HomeMy WebLinkAboutVINEYARD REZONING - 2-03 - SUBMITTAL DOCUMENTS - ROUND 1 - REZONING RELATED DOCUMENTWESTERN HERITAGE PROPERTY DEVELOPMENT
Rezoning Petition — Exhibit "A"
Page 4 of 4
January 8, 2003
3. By better mixing uses, the residential community proposal will best support
higher density of employment in the surrounding areas.
4. The property is within 2 miles of high shopping centers along Mulberry.
5. The 1-25 access will afford easy access for travel, as well as concentrating traffic
near residential and employment areas.
6. The property is supported by nearby utilities and proposed utilities.
7. Urban Estate zoning is the lowest density residential district in the Land Use
Code, and will provide for the desired transition from other zoning to Industrial
zoning.
8. The open space/no-build tract on the west side of the rezoning request will both
afford open space beautification, regional and subarea. planning requirements,
as well as possible water channel and detention requirements that will be
required for engineering and drainage requirements due to Boxelder Creek
flooding. These issues have been reviewed with the Stormwater Utility
Department, and an open space as proposed could well suit the many floodplain
requirements well. An open space/no-build easement dedication will be drafted
at such time as the City requires.
9. Along with the open space/no-build easement, cluster building can also be
accommodated on the eastern portion of the Urban Estate zoning.
RezoningPetition_ExA
WESTERN HERITAGE PROPERTY DEVELOPMENT
Rezoning Petition — Exhibit "A"
Page 3 of 3
January 8, 2003
6. development of residential lots should be'/4 mile from 1-25,
7. the zoning and properties along 1-25 should show a transitional nature from
commercial to residential.
Because there is no longer an adoption date for the 1-25 Subarea Plan and the date
has been extended from the Spring of 2001 to as much as five years hence as well as
being amalgamated into a future City Plan, it is the applicant's desire to submit a
rezoning plan that will best include the planning done by 1-25 Corridor Plan and the
conceptual ideal that the zoning along 1-25 should include design criteria that includes
the appearances, use, floodplain issues and compatibility issues designated by same.
Because studies of the new results of the floodplain studies in the area, and because
adjoining properties are in a large part residential in nature, the applicant believes it is
best served by all to have a combination of industrial open space/no-build areas and
residential areas for this parcel. This would both accommodate drainage problems and
alleviate the unsightly possibility of such a large industrial tract with nothing but storage
bins at the northern gateway to the City.
JUSTIFICATION FOR UE (URBAN ESTATE) ZONING
Zoning this property as UE instead of I (Industrial) is in better compliance with City and
area regional requirements. Along with rezoning the property, an open space, no -build
tract is proposed for the area. This will be used to best accommodate open space
requirement along the highway corridor as well as possible drainage requirements due
to flooding along the 100-year flood area along 1-25. Justifications include:
1. Having too large an I -Industrial tract near the highway will most likely have a
detrimental visual impact on the northern gate to the City. An I -Industrial tract of
this size, unless it is used for commercial office building, usually ends up bearing
tractors and other storage facilities on them with time. The proposed plan is to
have a manageably -sized tract bordering 1-25.
2. Abutting developments are being built as residential communities to the west and
the south presently. These communities are a visual statement that the
transitional zoning away from 1-25 is a good solution to many issues addressed
by various regional and subarea studies.
RezoningPetilion_ExA
WESTERN HERITAGE PROPERTY DEVELOPMENT
Rezoning Petition — Exhibit "A"
Page 2 of 2
January 8, 2003
Other properties to the south include a city parcel zoned I (Industrial), as well as
a county parcel east of that that is owned by Wilber Lebsack and is being
developed as a residential community with an approximate density of 2 houses
per acre.
To the north the property is zoned I (Industrial) and is being used commercially.
To the west would be 1-25, and just west of that is a fairly large residential
community developed by Richmond Homes with a PUD density.
Along with residential and I -Industrial zoning plans for the surrounding
properties, other commercial improvements for the area should include widening
E. Vine to 4-lane arterial on the west side of 1-25, as well as improving Vine to
east side of 1-25 to 2-lane arterial status, and possibly improving the I-25/Vine
interchange. The Anheuser Busch processing plant is 2 miles away.
BACKGROUND
Two recent submittals on the property for conceptual review were reviewed on June 30,
1997 and October 29, 2001. In 1997, the current Planning Department stated that the
property was currently in the 1-25 Corridor Study and that the land use requirement from
that study will affect the land use for this project.
In 2001 another set of comments included new requirements for this parcel in light of an
ongoing subarea study, the 1-25 Corridor Study, and the Boxelder Creek and Cooper
Slough floodplain studies, also. Some of the findings and land use recommendations
applicable to this site would be to:
1. build on the results of the 1-25 corridor Plan;
2. integrate open space into a network of watercourses,
3. support areas around the Anheuser Busch facility with neighborhoods and other
commercial facilities, .
4. protect river and stream corridors and their riparian boundaries,
5. storm drainage area and detention ponds should be designed to create
permanent habitat area with native vegetation
RezoniNPetitiw_ExA
WESTERN HERITAGE PROPERTY DEVELOPMENT
Rezoning Petition — Exhibit "A"
Page 1 of 1
January 8, 2003
OVERVIEW
This parcel of land that is being submitted for rezoning from I (Industrial) to UE (Urban
estates) has been submitted for conceptual review at least two other times by Western
Heritage Property Development, Inc., in recent years. No definite direction was
afforded past submittals, in part due to the lack of a time frame for completing and
adopting the 1-25 Corridor Plan and the Subarea Plan for this area. A large amount of
work has been done by staff and various consultants, as well as having numerous
public hearings and City Council work sessions. Summarizing the strategic direction for
open space, flood control, employment and shopping corridors, as well as an area for
residential use, although it may not be complete, can be more cohesively planned at
this time. The current conclusion of these studies should provide enough direction for
rezoning this parcel of land to best comply with future directions and city planning.
JUSTIFICATION FOR REQUEST
PrOperty Description
This is a piece of property that adjoins 1-25 feeder road on the NE corner of
E. Vine and 1-25. It is approximately 53.92 acres in size, with approximately
424 feet of frontage on E. Vine. An approximate 24.658-acre "I" zone tract lies
directly west of the proposed "UE" zone is also owned by the Petitioner, and is in
what is called a "no rise zone / 100-year flood boundary of Boxelder Creek"
along 1-25.
The property is presently serviceable by East Larimer County Water District and
Boxelder Sanitation District for water and sewer, and Light and Power for
electricity.
The east side of the property adjoins Boxelder Creek where a 100-building
setback is required. Two personal residences also adjoin the property to the
east.
To the south, E. Vine should be the future access for this property and this
residential community.
RezoningPetition_ExA