Loading...
HomeMy WebLinkAboutTHE FARMSTEAD - PDP - 8-03 - SUBMITTAL DOCUMENTS - ROUND 2 - REVISIONSNumber 15 A Transfort stop location has been integrated into the site. Transportation Planning: Number 45 Future street improvements as well as future striping are now shown on site plan. Number 47 Wheelstops are now shown south of building #3. Number 48 The parking area south of building #3 has been revised, and this comment no longer pertains. Number 50 The walkway that is in the emergency access easement has been widened to six feet. Water Wastewater: Number 27 The number of dwelling units has now been indicated on the site and utility plans. Number 30 Fire lines will not be required for any buildings. Zoning: Number 2 The buildings on the site plan have now been dimensioned to the adjacent property lines. Number 3 The number of dwelling units as well as the parking layout has been revised to comply with the parking requirement in the LUC. Number 5 Lot 1 is a single family lot. Number 7 This project will be built out in one phase. The landscape assurance section has been appropriately revised. Number 8 The tree in question has been relocated. I trust that after many meetings with city planning, and engineering and a total redesign based on this constructive input, we now have a plan that will meet all applicable criteria. Please feel free to call if you have any questions, ideas or comments. Sincerely, Mikal Torgerson M. Torgerson Architects Number 41 Buildings 4 & 5 have been eliminated in this layout, so this comment no longer applies. Number 42 The project name has been revised to "Farmstead" per city comments. Number 68 The public sidewalks have been revised so that the proposed sidewalks now tie into existing sidewalks on both the West and South sides. Number 69 Discussions with City of Fort Collins Traffic Engineering staff indicated that an alternative analysis for the suitability for a roundabout at the Taft Hill Road/ Laporte Avenue intersection is not required due to existing constraints in the immediate area that would preclude such an intersection design. Number 71 Basements are not planned for this development. Number 72 Lot 1 is planned for a single family residence that would gain access from Taft Hill Road in the same location as the emergency access easement location. Labeling has been provided on the site plan to clarify this. Number 77 A utility coordination meeting would be welcomed by the development team for this project. We have postponed this meeting until a final design could be established, but believe that such a meeting would be appropriate at this time. If staff wishes to coordinate such a meeting, this would be welcomed. If, however, it is preferable that we coordinate such a meeting, please advise and we will do so. Light and Power: Number 13 A streetlight layout has been provided on the landscape plan. Number 14 Transformer locations will be coordinated at the utility coordination meeting. Police: Number 18 A fence has been located between the residential units and the canal per this comment Building Location: Number 75 Building #2 has been relocated to be significantly farther away from the ditch Transfort Number 81 The buildings and site were redesigned and coordinated. The site and building elevations now agree with one another. Number 82 Building number six (now building number four) has been redesigned with a substantial front porch which protrudes proud of the garage doors. Number 83 Convenience has been somewhat compromised in this layout in order to enhance the pedestrian qualities of the proposed neighborhood. It is our belief that there is a substantial market for a less automobile dominated streetscape, with convenient parking slightly compromised in order to achieve this goal. Number 84 Buildings 4 & 5 have been eliminated from the revised layout. Number 85 There are rear stoops for the buildings 1,2 & 3 these are now shown on the site and landscape plans. Number 89 The site, landscape and building elevations have been revised per the redlines provided by city staff. Engineering addressed by the site, landscape and architectural plans.. Number 17 Because the site plan has undergone significant changes up to this submittal (due primarily to drainage constraints), we have postponed meetings with the ditch company until layouts could be finalized. The development team will now submit these same plans to the ditch company and solicit their "buy in" immediately following this submittal. Ditch company signature blocks have been added to the construction documents. Number 38 A temporary turnaround easement has been provided on the revised plans. Through discussions with Poudre Fire Authority, it was indicated that an actual turn around need not be provides since a full loop back to public right of way is provided for emergency services. Another factor that played into this decision is that it is anticipated that the property immediately to the South will likely be developed as a second phase of this project, and it would be a waste of resources to provide curb, gutter and paving for a turn around that will be removed in the very near future. It is our belief that we are meeting section 3.6.2(C) by providing a "temporary turnaround easement at the end of the street with a diameter of 80"'. September 26, 2003 Steve Olt City of Fort Collins 281 North College Fort Collins, CO 80522-0580 Dear Mr. Olt. - Attached is our response to city staff comments. Current Planning: Number 62 Landscape plans have been revised to provide full tree stocking per Section 3.2.1(D)(1)(c) of the Land Use Code Number 63 Landscape plans have been amended to satisfy the foundation planing requirements as set forth in Section 3.2.1(E)(2)(d) of the LUC Number 64 The redesigned parking area referenced in this comment has been revised to meet the interior landscaping requirements of Section 3.2.1(E)(5) Number 65 Additional landscaping has been added in the parking areas referenced in this suggestion. Number 66 The landscape assurances note has been revised to remove the phasing phraseology. Number 67 The trees being removed are very small "trash trees" that have sprouted up around the canal. However the development team recognizes that the City forester needs to be contacted regarding any trees to be removed. This was not able to be accomplished prior to this submittal since the layout was quite fluid due to engineering constraints. (Drainage issues were being explored both by city staff and our engineering consultants until quite recently) We will contact the City forester immediately now that the layout has been established. Number 70 Dimensions have been added to the site plan per this comment. Number 73 Building envelopes have been dimensioned to 2 property lines per this comment. Number 80 The site was entirely redesigned with some loss of units in order to meet the parking requirements laid out in the LUC 223 Wh College forl Collins CO 80524 970.416.7431 1.888.416.7431 Fax: 970.416.7435 Email: mikal@archilex.com hHp://www.urchitex.com