Loading...
HomeMy WebLinkAboutLARIMER COUNTY COMMUNITY CORRECTIONS FACILITY ADDITION, PHASE II - SITE PLAN ADVISORY REVIEW - 19-03A - CORRESPONDENCE - REVISIONS41 0 Department: Natural Resources Issue Contact: Doug Moore Topic: General Number: 11 • The minimum interior enclosure dimensions are 156" x 105" for a trash enclosure accommodating one 3 yard recycling and one 3 yard trash bin. This is what exists. Our proposed trash enclosure exceeds these dimensions. We will verify the new service requirements of the total facility and revise the enclosure size as necessary. Department: Transportation Planning Issue Contact: Kurt Ravenschlag Topic: General Number: 8 • No comment required. Department: Stormwater / Water / Wastewater Issue Contact: Wes Lamarque Topic: General Number: 4 • The submitted drainage letter and analysis addresses all of the issues about the stormwater detention and proposed solutions. Please review. Number: 5 • The submitted drainage letter and analysis addresses all of the issues about the stormwater detention and proposed solutions. The culvert was approved with the original building and the engineer has no intent to change the design. Please review. Number: 6 • This will be revised with the final engineering documents. Department: Stormwater / Water / Wastewater Issue Contact: Roger Buffington Topic: Water / WW Number: 7 • Final utility plans will be submitted. We expect to make connections to the existing 6" sewer stub located west of the existing building stairwell. No new fire line or water line is expected. The existing water service lines entering the building are properly sized to accommodate the addition. In building stub -outs are already in place for these future connections. Underground electrical will be re-routed as it currently occurs under our addition. vc.oi C / Walt Gantt Kenney & Associates Architects LLC END OF RESPONSE LIST kenney associates, LLC architects landscape architects urban designers planners • Date: January 4, 2006 To: City of Fort Collins Community Planning and Environmental Services Current Planning Att: Shelby Sommer RE: Larimer County Community Corrections Phase II Addition 2255 Midpoint Drive Fort Collins CO 80525 Site Plan Review Responses The following is responses to your review letter dated December 23th, 2005: Department: Current Planning Issue Contact: Shelby Sommer Topic: General Number: 9 • More parking will be proposed. We are preparing an additional drawing for the new parking lot improvements immediately adjacent to the east of our site. This site has been slated for future parking expansion already under a different master plan. Number: 10 • The primary building entrance is existing with the main structure. Phase II addition has an entrance that is secondary to the main structure and must not be a dominant feature of the entire building fagade. The "top" treatment will be consistent with the existing structure so it may harmonize architecturally. Section 3.5.3 (D) of the Fort Collins Land Use Code indicates these guidelines to be for new buildings and to the extent reasonably feasible, ... changes to existing building walls, facades or awnings. We feel this addition would not be defined as such. Number: 12 • The City of Fort Collins designates this property as E-Employment. Corrections facilities are permitted uses in this zoning district and this use is consistent with the City Structure Plan. Department: Engineering Issue Contact: Sheri Wamhoff Topic: General Number: 1 • The coordination of our proposed walk along the west side with the grading and driveway proposed on the adjacent lot will occur with the final design process. Number: 2 • We will show the existing improvements in a lighter line weight to help distinguish the limits of existing items and what is proposed. Number: 3 • A new set of utility plans will be provided as per Nolte. The utility submittal appears incomplete or preliminary because it meets the submittal requirements for a Site Plan Review process. kenney e associates, LLC architects landscape architects urban designers planners