Loading...
HomeMy WebLinkAbout300 SMITH STREET, OLD TOWN COMMONS - FDP - 39-03B - CORRESPONDENCE - (5)Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Erosion/Sediment Control Number. 65 Created: 4/22/2005 [4/22105] Please provide project schedule, calculations. If you have any questions, please call Bob Zakely at 221-6700. Topic: Storrnwater Number. 62 Created: 4/22/2005 [4/22105] Please revise slope to be 1-inch per fooffor the drainage valley pan. Number. 63 Created: 4/22/2005 [4/22/05] The grate for the alley drainage is not required. The grate could be removed and the flows can just enter the concrete channel. This will also allow for additional slope. There is only .05 feet of drop along the channel. Number. 64 Created: 4/22/2005 [4/22105] A radius is required for the junction of the concrete channel with the existing curb and gutter. See redlined plans. Department: Zoning Issue Contact: Jenny Nuckols Topic: Zoning Number. 4 Created: 10/21/2004 [4/13/05] [10/21/04] Need to show foundation plantings on the south side of the building. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yo Truly, teve Olt City Planner Page 2 STAFF PROJECT REVIEW Cityof Fort Collins ROSITA BACHMANN Date: 04/28/2005 8018 FOX HILL DR. LONGMONT, CO 80501 Staff has reviewed your submittal for 300 SMITH STREET, OLD TOWN COMMONS PDP AND FINAL PLANS, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Marc Virata Topic: General Number. 55 Created: 1 /18/2005 [4/19/05] The redesign has concerns. Only .2% of grade is being provided, there's not enough slope to ensure'adequate drainage. In talking with Stdrmwater, couldn't the design function better if the grate in the alley was eliminated and a chase was designed from the alley out to the sidewalk by haying the invert elevation at the alley start at 66.42 to daylight to the street at 66.21? Rather than a grate on the sidewalk, use a metal plate (see attached detail). I ' [1/18/05] Is it the case that the drainage collected from the inlet on the west side of the alley cannot be directed underneath the sidewalk to the west out to Olive Street instead of the grate system? This would reduce costs as well as general concerns on the amount of concrete pavement beneath the grate system to ensure it holds up to traffic. Department: Light & Power Issue Contact: Doug Martine Topic: Light & Power Number: 10 Created: 10/27/2004 [4/8/05] [10/27/04] Electric and gas service & meter locations will need to be coordinated with Light & Power Engineering and Xcel Energy. Normal electric development charges and electric system modification costs will be payable by the developer. Department: PFA Issue Contact: Michael Chavez Topic., General Number. 50 Created: 12/15/2004 [4119/05] [12115/04] WATER SUPPLY: Commercial No commercial building can be greater then 300 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual pressure of 20 psi. 1997 UFC 901.2.2.2 . Number. 51 Created: 12/15/2004 [4/19/05] [12/15/04) PREMISES IDENTIFICATION: Approved numerals or addresses shall be provided for all new and existing building in such a position as to be plainly visible and legible from the street or road fronting the property. 1997 UFC 901.4.4 Page 1