Loading...
HomeMy WebLinkAboutFLATS AT RIGDEN FARM - FDP - FDP140021 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSTopic: General Comment Number: 1 Comment Originated: 10/14/2014 10/14/2014: no comments Department: Water -Wastewater Engineering Contact: Roger Buffington, 970.221.6854, rbuffngtonOfcoov.com Topic: Construction Drawings Comment Number: 6 1Comment Originated: 10/24/2014 10/24/2014: On the irrigation tap, show/label the curb stop, meter pit and the size of the service. Comment Number: 7 Comment Originated: 10/24/2014 10/24/2014: Will the sewer services to Bldg 5 and Bldg 7 have clean -outs at the 90 degree bends? If yes, label the clean -outs as traffic -rated and include the Standard Detail. Page 4 of 4 Department: Outside Agencie, Contact: Don Kapperman, , Topic: General Comment Number: 1 Comment Originated: 10/15/2014 10/15/2014: Comcast did a joint trench with Light and Power on the property years ago. Department: Technical Services Contact: Jeff County, 970.221.6588, icounty(alfcaov.com . Topic: Building Elevations Comment Number: 2 Comment Originated: 10/1512014 10/28/2014: SHADOW ANALYSIS: There is still text that needs to be masked. See redlines. 10/15/2014: SHADOW ANALYSIS: There is text that needs to be masked. See redlines. Topic: Construction Drawings Comment Number: 4 Comment Originated: 10/15/2014 10/28/2014: The benchmark statement on sheet CS2 should match sheet CS1. 10/15/2014: The City has moved to the NAVD88 vertical datum. Please provide the following information in the format shown below. 1) PROJECT DATUM: NAVD88 BENCHMARK wl DESCRIPTION (Provide 2 City of Fort Collins benchmarks) ELEVATION: OR, if project has already been surveyed in NAVD29 Unadjusted: 2) PROJECT DATUM: NGVD29 UNADJUSTED (OLD CITY OF FORT COLLINS DATUM) BENCHMARK w/ DESCRIPTION (Provide 2 City of Fort Collins benchmarks) ELEVATION: If using NGVD29 UNADJUSTED the following equation statement will be needed. NOTE: IF NAVD 88 DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NAVD88 = NGVD29 UNADJUSTED + X.XX4 Topic: Lighting Plan Comment Number: 13 10/28/2014: Not routed to us this round of review. 10/15/2014: No comments. Topic: Plat Comment Number: 16 10/28/2014: We are waiting to hear back from the Surveyor on this. 10/15/2014: Please clarify the intent of Note #5. See redlines. Comment Number: 17 10/28/2014: Please add "Exclusion" to Lot 2. See redlines. 10/15/2014: Is Lot 2 meant to be part of the exclusion? See redlines. Department: Traffic Operation Contact: Martina Wilkinson, 970-221.6887, mwilkinson(&fcaov.com Comment Originated: 10/15/2014 Comment Originated: 10/15/2014 Comment Originated: 10/15/2014 Page 3 of 4 Comment Number _ ,2 Comment Originated: 10/30/2014 10/30/2014: The north arrow is pointing in the wrong direction on the following sheets: SG1- Subgrade Plan SS1- Sanitary Line A Plan and Profiles G1- Overall Grading Plan G2- Overall Grading Plan Please revise Comment Number: 13 Comment Originated: 10/30/2014 10/30/2014: Please add a note to the Overall Utility Plan (sheet U1) that specifies the thickness of the bus pad to be 6" thick concrete pad. Comment Number: 14 Comment Originated: 10/30/2014 10/30/2014: Please replace the sidewalk chase detail D10 on sheet D5 with sidewalk chase detail D10-B Department: Environmental Planning Contact: Lindsay Ex, 970.224.6143, lexWcaov.com Topic: General Comment Number: 1 Comment Originated: 10/15/2014 10/15/2014: No comments. Department: Internal Services Contact: Todd Reidenbach, , Topic: General Comment Number: 1 Comment Originated: 10/15/2014 10/15/2014: Addresses will be assigned by the GIS Department after the plans have met final approval through Development Review and are recorded with the City. Comment Number: 2 Comment Originated: 10/15/2014 10/15/2014: Projects with three or more tenant units require the Unit Level Addressing form to be completed and submitted to the GIS Department once plans have met final approval through Development Review and are recorded with the City. This can occur anytime during construction, but before any utilities or address signs are installed. All addressing will be determined by the GIS Department and submitted to Poudre Fire Authority, USPS, Building Services, and Fort Collins Utilities. Failure to contact GIS and determining addresses through other means may result in address changes. Todd Reidenbach, GISP GIS Mapping Specialist treidenbach@fcgov.com 970.416.2483 Work 970.221.6329 Fax Comment Number: 3 Comment Originated: 10/15/2014 10/1512014: The Unit Level Addressing form can be obtained by contacting the GIS office at gis@fcgov.com or (970) 416-2483. Page 2 of 4 Fort Collins October31, 2014 Jason Sherrill LANDMARK HOMES 1170 WEST ASH ST SUITE100 Windsor, CO 80550 RE: Flats at Rigden Farm, FDP140021, Round Number 1 Community Development and Neighborhood services 281 North Coilege Avenue PO Box 580 Fort Collins, CO 80522 970.221.6760 970.224.6134 - fax fcgov. com/developmentreview Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Noah Beals, at 970416-2313 or nbeals@fcgov.00m. Comment Summary: Department: Planning Services Contact: Noah Beals, 970-416.2313, nbeals(tfcpov.com Topic: General Comment Number: 1 Comment Originated: 10/13/2014 10/29/2014: The plat signature block was not updated. 10/13/2014: The signature block for Planning on the site plan and the plat need to be changed from Director of Planning to Director of Community Development and Neighborhood Services. Department: Engineering Development Review Contact: Tyler Siegmund, 970-221-6501, tsiggmund(a)fcaov.com Topic: General Comment Number: 10 Comment Originated: 10/30/2014 10/30/2014: SITE PLAN: Please update the bus stop pad dimensions on the site plan- All other project documents specify 8ft x 25ft pad. Comment Number: 11 Comment Originated: 10/30/2014 10/30/2014: On the cover sheet of the Utility Plans, the Sheet Index is missing sheet SG1- Subgrade Plan. Please add this sheet to the Sheet Index Page 1 of 4