Loading...
HomeMy WebLinkAboutTIMBERLINE VILLAGE - HARMONY SCHOOL SHOPS, 4TH FILING - FDP - 10-03A - CORRESPONDENCE - REVISIONSCow, @@ o urban design, inc. Department: Zoning Issue Contact: Peter Barnes Topic: zoning Number:114 Created:9/4/2003 No comments. So noted. Thank you. Page 6 co XYP@P� urban design, inc. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Landscape Number:35 Created:3/31/2003 9/10/03 As previously indicated, provide the required landscape/utility separation distances. Correct standard general note on the landscape plans pertaining to landscape utility separation requirements. Maintain 10 feet of separation between trees and water/sewer lines and 4 feet of separation shrubs and water/sewer lines. Landscape and utility separation issues were resolved at a meeting between Joe Carter of Cityscape and Jeff Hill on October 2, 2003. Jeff Paulsen, with JR Engineering, was in attendance. Topic: Utility Plans Number:91 Created:6/612003 9/10/03 As previously indicated, show and label all location of proposed as well as existing curb stops and meter pits. All existing water services must have a curb stop attached to them or there is no way to control the water. Please refer to J. R. Engineering's comment response letter for this issue. Number:100 Created:7/24/2003 If meter pits, curb stops and fire hydrants for phase one are constructed within phase two then provide bollards to protect them from traffic. Include a bollard detail on the detail sheet. Please refer to J. R. Engineering's comment response letter for this issue. Number:102 Created:7/24/2003 See site, landscape and utility plans for other comments The landscape plan comments have been addressed. Please refer to JR Engineering's comments letter for additional response. Number:117 Created:9/11/2003 Water services must remain the same size from the main to a point 5 feet downstream of the meter pit. Correct all water services to reflect this. Please refer to J. R. Engineering's comment response letter for this issue. Number:118 Created:9/11/2003 Provide utility easements for all water services up to and including the curb stop as well as fire hydrants. Please refer to J. R. Engineering's comment response letter for this issue. Number:120 Created:9/11/2003 Include 1 1/2% 2" meter pit detail, concrete encasement detail and bollard detail on the detail sheet with the next submittal. Please refer to J. R. Engineering's comment response letter for this issue Page 5 Department: Stormwater Utility Topic: Erosion Control Number:64 Created:4/7/2003 Please provide an erosion control escrow calculation Fourth Review September 8, 2003 Same comment as last time. Third Review c�tys aP - urban design, inc. Issue Contact: Basil Hamdan in the text of the report. July 23, 2003 Please schedule a meeting with Bob Zakely to discuss this plan. Second Review June 3, 2003 The plan is still incomplete and difficult to follow, please correct. Please refer to J. R. Engineering's comment response letter for this issue. Topic: Plat Number:119 Created:9/11/2003 The maintenance note on the plat sems to indicate that the City will be responsible of maintaining all facilities within a drainage easement on the site, while the City has only agreed to maintain the pond and the storm sewer from Harmony to the detention. Please modify the note, to that effect and add that the City wioll only maintain the detention pond after certification and acceptance of that pond, and after the two year warranty period. Please refer to J. R. Engineering's comment response letter for this issue. Topic: Utility Plans Number:112 Created:7/28/2003 Please add the abbrevaition labeling of Roof Drain, R.D. to the abbreviation list as well as that of Domestic Service, D.S. Please specify what type of pipe will be used for the drainage coming off the roof of Building 1. Provide a cleanout at the bend. Please refer to J. R. Engineering's comment response letter for this issue. Number:121 Created:9/11/2003 Please clearly call out that the inlet and storm sewer along Harmony Rd. will be built with Phase 1. Add note to storm sewer profiles that all storm sewers to use water tight joints. Sorm sewer installation to be inspected by City of Fort Collins. Pipe B only to be maintained by City of Fort Collins, all other pipe to be maintained by property owner. Please refer to J. R. Engineering's comment response letter for this issue. Department: Transportation Planning Issue Contact: Tom Reiff Topic: Transportation Number:116 Created:9/10/2003 No further comments. So noted. Thank you. Page 4 con@@ o urban design, inc. does not move forward, the construction would need to fall upon this development; there would be reimbursement available from Street Oversizing for this. [7/23/03] After review of the submitted turning movements for a WB-50 and futher analysis of turning movements using the provided CAD drawings, please "shave off' portions of the medians as redlined. This would appear to make the turning movements easier for these larger vehicles. [9/16/03] Please be aware that Caribou Apartments has not completed final compliance review. As such, the development agreement will need to obligate the developer of both design and construction of the offsite improvements north of the channelized-T should Caribou Apartments not have these respective items completed relative to the desired schedule of Harmony School Shops 4th. Please refer to J. R. Engineering's comment response letter for this issue. Number:105 Created:7/28/2003 There is some concern on the amount of cross slope from the crown to the east side of Timberline directly in front of Milestone Drive, it appears relatively flat. Please explore raising the east side of this median to achieve greater fall across Timberline. It seems counterintuitive that the elevation noted at STA 15+97.25 is higher than the spot elevations on either side. Please see redlines on plan view and cross section sheets. [9/16/03]Please look at further raising the east side of the median from STA 17+50 to 18+50 to provide more of a cross fall, it would be preferred if the slopes can at least match existing slopes. Also, please show street patching as shown on the redlines with the typical street patching note. In addition, please show patching limits of 6' past (half the lane width) where curb and gutter is to be added and add the same note regarding limits of repair that is shown on Sheet 5. Please refer to J. R. Engineering's comment response letter for this issue. Number:115 Created:9/10/2003 Based on conversations with CDOT in processing their access permit, please address the following items: - Add a note to Sheet 8 indicating that the access opening onto Harmony Road is to be centered upon the 35' opening in the deeded access control line. - Please create an existing and proposed striping plan for Harmony Road. The proposed striping plan sheet should label/indicate striping to remain and proposed striping areas. In addition, indicate "existing bikelane striping from taper to intersection to be refreshed". On the existing striping plan, show with cross -hatching areas of striping which are to be removed. - Please provide what the building square footages are for the existing gas station and school uses that would use this development for circulation. This will be filled in item 11 of the access permit. - As a "heads -up", at the time the plans are approved and signed off, 5 copies (signed and stamped for the construction plan) of the following sheets will need to be provided for CDOT's purposes: >Cover Sheet >General Notes >Horizontal Control Plan >Grading Plan >Existing and Proposed Harmony Road Striping Plan >Details Sheets >Cityscape's Site & Landscape Plan (also, 3 additional copies of the proposed and existing striping plan for CDOT is needed) After approval of the plans, 5 copies of the plans will be provided to the City of Fort Collins for distribution to CDOT. Page 3 Ca�Y72@@P@ urban design, inc. Technical Services offered the following comments: 1. Boundary & legal closes 2. Plat does not meet requirements of Sections 1.2.2 and 1.2.4 in Appendix E-6 of the Larimer County Urban Area Street Standards. 3. Comments from March 26, 2003 Sheet have not been addressed. (#2 & #6) 4. If lot lines to be vacated were removed the plat would be cleaner. 5. Drainage/detention area at NEC of plat needs a Tract #. 6. Some easements are not locateable. [7/28/031 Technical Services offered the following comments: 1. Plat needs sheet No. 1 of 2 and 2 of 2. 2. Some easements are not locatable. 3. The title (subtitle) of the plat is wrong - ("being a replat of lots 2 & 3 Harmony School Shops 1st... ) 4. Is there a way to identify the lot corners (new) with a symbol? Lot lines are hard to distinguish. [9/16/03] These comments are left as unresolved because of the plat being revised by the applicant. Please refer to J. R. Engineering's comment response letter for this issue. Number:110 Created:7/28/2003 In general, it is difficult to follow the information on the plat. The lot lines within the platted boundaried are hard to follow. The plat labels a 20' utility, drainage, access easement (Reception# 97028752) which seems to point at a hatched area designated as an emergency access easement and there are other labels which are difficult to place where they are defined. [9/10/03] This comment is left as unresolved as the applicant has indicated an updated plat is still forthcoming. Please refer to J. R. Engineering's comment response letter for this issue. Topic: Utility Plans Number:76 Created:5/22/2003 Based upon discussion among City Transportation on 6/5, the horizontal alignment of the channelized-T design is satisfactory. The following items related to this design though, does need to be addressed. 1. Cross sections along the channelized-T at 50' intervals (as well as critical point such as median noses) are needed to verify drainage patterns and vertical "ride". Also provide spot elevations on any plan view. 2. Indicate curb type along the medians for the channelized-T proposed and provide a detail. 3. Turning movements for large vehicles (WB-50) need to be verified on this design, especially because of commercial trucks using this to serve the site and it allows them to head east on Harmony Road. 4. The proposed design is considered safe from a Traffic Operations standpoint, provided that the work north of Timberline (as being designed by North Star Design) is completed concurrently. The channelized-T without these improvements is a safety issue. It is required that this offsite design is approved concurrently with these plans if not already approved with the Caribou Apartments project. This may involve needing to place the plans from North Star into this submittal or getting North Star to separate this plan set out from the Caribou Apartments design to be approved independently. In addition, this offsite construction will need to be done prior to or concurrent with the channelized-T construction. As Caribou Apartments is under final compliance review, this may not be a concern, but if that project Page 2 November 12, 2003 Ted Shepard City of Fort Collins Community Planning and Environmental Services P.O. Box 580 Fort Collins, CO 80522 RE: Timberline Village PDP Dear Ted: Go4�, op� urban design, inc. 3555 Stanford road, suite 105 fort Collins, colorado 80525 (970) 226-4074 fax(970) 226-4196 e@cityscapeud.com Included below are the comments received from City Staff regarding the first round of Final Compliance Plans for Harmony School Shops Fourth Filing (Timberline Village). An explanation (in italics) of how issues have been addressed follows each comment. These comments were initially received on September 181", 2003. The City of Fort Collins redlines have been included with this submittal. ISSUES: Department: Engineering Issue Contact: Marc Virata Topic: General Number:51 Created:4/1/2003 Utility, access, and landscape permits are likely to be required by CDOT as the project continues. [6/4/03] It should be verified who will be working on the permit for CDOT to underground the overhead line within the development. Because I believe the line is Xcel's, they likely need to be working with the Developer for that portion of the utility permit. [9/16/03] This comment is left as unresolved just as a heads -up for the applicant. So noted. Thank you. Number:54 Created:4/2/2003 Letters of intent are required for all offsite easements prior to the scheduling of a hearing. This appears required for the property to the northeast as well as southwest. [6/4/03] The owner of the mobile home park also needs to sign a letter of intent for the sidewalk connection. [7/23103] A letter of intent from ARC was not received with the submittal, only a legal description of the area. [9/9/03] As neither a letter of intent or the actual easement has been provided for the proposed design, final compliance has not been met and the drawings cannot be finalized for approval and signature. It is my understanding that an alternative design for the trail is being looked at, this needs to be provided on the construction plan set. An agreement between the City of Fort Collins and the applicant regarding the off -site easements has been established. The applicant has agreed to provide funds in escrow for trail construction and materials. A graphic depiction of the trail has been removed from the planning documents but retained on the Engineering Construction set of drawings. A note has been added to both sets of plans stating that a trail of determined length from the eastern property line of this development to Snow Mesa Drive will be constructed. As proposed, the trail is 8' wide asphalt trail that will be sloped to drain. Topic: Plat Number:90 Created:6/5/2003 Page 1 �iNA-L Gph PGiRNL£