HomeMy WebLinkAboutTIMBERLINE VILLAGE - HARMONY SCHOOL SHOPS, 4TH FILING - FDP - 10-03A - SUBMITTAL DOCUMENTS - ROUND 1 - REVISIONS (3)101. Note was added on sheets 9 & 10 of 27 stating "ALL UTILITIES SHALL BE INSTALLED
WITH PHASE I UNLESS OTHERWISE SPECIFIED".
101. Water line was added. Fire hydrant is now in landscaped island and is stubbed out for
future development.
102. Comments were checked and revisions were made.
If you have any questions or need additional information, please contact me at 970.491.9888.
Sincerely, �f
Trina Colvin
Design Technician H
cc: Rob Beery, Miller -Weingarten,
Joe Carter, Cityscape
Matt Rankin, Vaught -Frye Architects
Randall Provencio, JR Engineering
X: 934700 / Corresp / Letters / commentresponseletter
103. Signature block for CDOT was added to bottom right corner of cover sheet. Sheet 2B
was added for placement of CDOT General notes.
104. Latest approved Striping Plan was added to drawings.
105. Revisions were made accordingly.
106. Existing cross slopes have been added to cross -sections.
107. Transition lengths have been specified on drawings.
Light and Power
96. Vaught Frye Architects has provided this information to Alan Rutz.
97. Blanket easement is being used for this development as specified on notes at bottom of
sheet. Due to developers concern blanket easements will be revised and individual easements
will be shown on Plat prior to Mylar submittal.
Stormwater
109.
• The owner of the telephone easement does not have exclusive use of the land
encumbered by his easement. There is no requirement that he sign the Plat.
• Note has been revised.
• Note has been revised.
64. A meeting with Bob Zakely has been scheduled.
108.
• Note was added on sheets 11 & 12 of 27 stating "ALL FUTURE PHASE AREAS (BLDGS 3,
4, 5, 6) SHALL BE OVERLOT GRADED WITH POSITIVE DRAINAGE. ALL FUTURE AREAS
SHALL BE SEEDED AND MULCHED PER LANDSCAPE PLANS."
• Detail of 2' trickle pan was added to sheet 26 of 27
111. The proposed area inlet is outside of CDOT R.O.W.
112.
• Type of pipe used for roof drains is stated on the Cover Sheet (1 of 27) in note #17 in
lower left corner.
• Clean outs have been added at bends.
Transportation Planning
98. The walk width has been revised to 8'.
Water/Wastewater
35. See comment response by Cityscape.
91. Note was added on sheets 9 & 10 of 27 stating "WATER METER PITS AND CURB STOPS FOR
BUILDINGS 3, 4, 5 AND 6 SHALL BE INSTALLED WITH FURTHER PHASES".
93. Placing Geoweb specification on drawings will place liability on J-R Engineering by
referencing specification will limit the liability in J-R Engineering which is our
preference.
X: 934700 / Corresp / Letters / commentresponseletter
August 25, 2003
Mr. Ted Shepard
City of Fort Collins
281 North College Avenue
Fort Collins, Colorado 80522
Re: Harmony School Shops 41h Filing
Dear Ted:
ft)
J•R ENGINEERING
A Subsidiary of Westrian
We have revised the construction drawings and drainage report per your comments dated July
23, 2003. The following numbers correspond to the comments:
Engineering
54. Letter of intent will be submitted by the developer.
58. Note no. 2 will be deleted on the plat and replaced with a note that references the
"Restrictions and Covenant" document to be recorded concurrently with the Plat. This
document specifically details the rights, responsibilities, restrictions and obligations of the
parties involved. The change was not yet made because we are waiting on specific
language from the attorney.
113. A note was added to Canalized "T" Demo Plan stating "CONTRACTOR SHALL REFER
TO LANDSCAPE PLANS BY CITYSCAPE FOR REMOVAL AND REPLACEMENT OF
EXISTING LANDSCAPING ALONG MEDIAN. RELOCATION OF EXISTING
LANDSCAPING ALONG MEDIAN SHALL BE COORDINATED WITH CITY
FORRESTOR.".
Topic plat:
90.
• Sheet numbers of the Plat were revised unfortunately; an error still exists on sheet one
since it is shown as sheet 2 of 2. This will be corrected for the final product.
• Plat is undergoing a major overhaul to help clarify easement locations and geometry.
This revision will include a third page but not completed in time for this submission.
All easements will be clearly shown and will be locatable upon completion.
• Subtitle has been revised.
• Same response as item no. 2
110. Same comment as to item 90.2 above..
Utility Plans:
76.Raised medians are revised to accommodate WB-50 turning movement.
X: 934700 / Corresp / Letters / commentresponseletter
2620 Fast Prospect Road, Suite 190, Fort Collins, CO 80525
970-491-9888 • Fax: 970A91-9984 • wJrengineering.com