Loading...
HomeMy WebLinkAboutTIMBERLINE VILLAGE - HARMONY SCHOOL SHOPS, 4TH FILING - PDP - 10-03 - CORRESPONDENCE - REVISIONS (6)• The future lots have been labeled as "Future Phase" which will eliminate the need for phasing sheets as discussed with Marc Virata. If you have any questions or need additional information, please contact me at 970.491.9888. Sincerely, Randall K. Provencio Project Manager cc: Rob Beery, Miller -Weingarten Joe Carter, Cityscape Matt Rankin, Vaught -Frye Architects Mike Brake, JR Engineering X: 934700 / Corresp / Letters / commentresponseletter • One sheet is not possible with scale that is being used as discussed with Basil Hamdan. • Utility plans were revised to show this information. • Existing line types were revised. 64. • Grading and Erosion Control Notes will be revised on next submittal. • Erosion Control Plan has been revised. 62. • Spillway and berm elevations will be shown on next submittal • Grading Plan has been revised to show storm sewer invert elevations. • Concrete pan alignment has been revised and pan spot elevations will be added on next submittal. • This is shown on demolition plan, which cross-references the landscape plan. • All proposed contours were properly tied out. 63. Stan Whitaker of Western Investment is working with Basil Hamdan to determine if a drainage certification has ever been submitted/approved. 60. A storm sewer easement has been provided for the area inlet and storm pipe designed to pick up storm water flows from Harmony Road as directed by Basil Hamdan. 66. • Labeling was revised on sewer profiles. • A note was added to cover sheet clarifying the maintenance responsibility of storm sewers. 61 • Storm sewer labeling was revised. • A utility coordination meeting was held with Basil Hamdan, Jeff Hill, Alan Rutz, developer Rob Beery, and JR Engineering to resolve any utility conflicts at the main entrance. It was decided at this meeting that the utility layouts as shown were satisfactory for the allowed space provided. • All existing storm sewers labeling have been revised. • Legend is provided on cover sheet as discussed in meeting with Basil Hamdan. • Inlet sizes and types are called out on the overall utility plan. • Storm sewer labeling has been revised. • Storm sewer labeling has been revised. • Utility plans have been cleaned up. • A utility coordination meeting was held with Basil Hamdan, Jeff Hill, Alan Rutz, developer Rob Beery, and JR Engineering to resolve any utility conflicts at the main entrance. It was decided at this meeting that the utility layouts as shown were satisfactory for the allowed space provided. • An area inlet and storm pipe has been designed to pick up storm water flows from Harmony Road as directed by Basil Hamdan. • A note was added to cover sheet clarifying the maintenance responsibility of storm sewers. • Eighteen inches has been maintained at all utility main crossings. • Overall utility plan has been cleaned up as much as possible without eliminating necessary text. • Legend is shown on cover sheet as discussed in meeting with Basil Hamdan. X: 934700 / Corresp / Letters / commentresponseletter 2. A "Channelized T-Intersection" design for the Timberline Road/Milestone Drive intersection will be submitted at a later date. 3. Timberline Road improvements from Caribou Drive to Harmony Road will not be required for this development per discussions with Matt Baker and Eric Bracke. 4. See comment response by CityScape. 5. A "Channelized T-Intersection" design for the Timberline Road/Milestone Drive intersection will be submitted at a later date. Comcast Cable 1. An easement will be added to drawings along the north side of Harmony Road once it is determined what type of easement will be required per utility companies. Excel Energy 1. All required gas easements will be addressed by a blanket easement that will be provided for the entire development as noted on the plat and will also be covered in the Developer's Agreement. 2. A blanket cross access easement will be provided for the entire development as noted on the plat and will also be covered in the Developer's Agreement. 3. A 15-foot utility easement along the north side of Harmony Road will be provided and the existing overhead electric line will be placed underground in front of this development at developer's cost. 4. Noted. Technical Services 1. Boundary has been revised to match legal and it does close. 2. Subtitle has been corrected. 3. A meets and bounds legal has been provided for entire boundary. 4. The Point of Beginning has been labeled. 5. Plat has been revised to address the dedication of Milestone Drive and Timberline Road. 6. All proposed easements are shown on the plat. 7. Vacation note #2 has been revised. Engineering Pavement 1. Noted. City Forrester 1. See comment response by CityScape. 2. See comment response by CityScape. 3. See comment response by CityScape. 4. See comment response by CityScape. 5. See comment response by CityScape. Stormwater 67. A concrete reinforcement detail for the water quality outlet box will be provided on next submittal. 65. • Legend is provided on cover sheet as discussed with Basil Harridan. X: 934700 / Corresp / Letters / commentresponseletter 26. Noted. Transfort 7. See comment response by CityScape. 27. See comment response by CityScape. 28. See comment response by CityScape. 29. See comment response by CityScape. 30. See comment response by CityScape. 31. See comment response by CityScape. 32. Ramps have been revised per redlines. 33. Ramps have been revised per redlines. Water/Wastewater 35. See comment response by CityScape. 34. Easements have been provided for all curb stops and fire hydrants. 36. Proposed water line along the north side of building 5 has been realigned and easement has been provided. 37. The text has been shifted around for clarity but it was determined that this text is necessary for contractors as discussed with Jeff Hill. 38. Steel casing is no longer being used so the detail was removed. 39. All notes are provided on cover sheet as explained in meeting with Jeff Hill. The joint deflection note to avoid utility crossing was removed. All information for water main lowerings was provided. 40. All existing water and sanitary sewer services that are not being used are labeled as being abandoned to main as shown on demolition plan. 41. All cleanouts that are located in traffic areas have been labeled as "Traffic Rated" and a detail has been provided. 42. Twelve inches has been maintained at all utility main crossings. Zoning 1. See comment response by CityScape. 2. See comment response by CityScape. 3. See comment response by CityScape. 4. See comment response by CityScape. 5. The monument signs will be relabeled "Possible Entry Monument Sign Location" on utility plans on next submittal. 6. See comment response by CityScape. Current Planning 1. See comments responses by CityScape. 2. A blanket cross access easement will be provided for the entire development as noted on the plat and will also be covered in the Developer's Agreement. 3. See comments by CityScape for remainder of this section. Traffic Engineering 1. A "Channelized T-Intersection" design for the Timberline Road/Milestone Drive intersection will be submitted at a later date. X: 934700 / Corresp / Letters / commentresponseletter 44. JR Engineering has reviewed the right-of-way issues along Timberline Road and Harmony Road and would like to set up a meeting with the city as soon as possible to discuss what we have determined. Please notify me which city personnel you would like to attend this meeting so that I can set this meeting up. 59. An emergency access easement has been provided. Utility 48. A 150-feet of additional topographic survey has been provided along Harmony Road east of the east property line and along Timberline Road north of the north property line. Topo has also been provided for the full width of both roads as the city requested. 49. The future lots have been labeled as "Future Phase" which will eliminate the need for phasing sheets as discussed with Marc Virata. 50. The Horizontal Control Plan for Phase I is being provided for construction purposes and is not being provided for the future lots because they will not be built at this time. A Horizontal Control Plan will be provided for these lots at time of development. A Horizontal Control Plan is not a City of Fort Collins requirement and has only been provided per client's request. All dimensions for these future lots are being shown on the site plan as provided by CityScape. 55. A 15-foot curb return radii has been designed for driveway as directed by Ted Shepard of Current Planning. 56. A 15-foot curb return radii has been designed for driveway as directed by Ted Shepard of Current Planning. 57. An area inlet and storm pipe has been designed to pick up storm water flows from Harmony Road as directed by Basil Hamdan. Light and Power 11. See comment response by CityScape. 12. See comment response by CityScape. 13. Electric service locations have been revised per Alan's latest redlines. 14. Meter locations have been revised per Alan's latest redlines. 15. One transformer is being proposed for buildings #7 and #8 as shown on drawings. 16. The existing overhead line along the north side of Harmony Road is owned and maintained by PSCO and will be placed underground in front of this development at developer's cost. 17. Existing electric line and vault have been shown per Alan's latest redlines. 18. All existing electric lines have been revised per Alan's latest redlines. 19. All proposed electric primary lines have been revised per Alan's latest redlines. 20. All required electrical easements will be addressed by a blanket easement that will be provided for the entire development as noted on the plat and will also be covered in the Developer's Agreement. PFA 21. A 20-foot wide fire lane has been provided. 22. Noted. 23. Noted. 24. Noted. 25. Noted. X: 934700 / Corresp / Letters / commentresponseletter May 14, 2003 Mr. Ted Shepard City of Fort Collins 281 North College Avenue Fort Collins, Colorado 80522 Re: Timberline Village Dear Ted: J•R ENGINEERING A Subsidiary of Westrian We have revised the final construction drawings and drainage report per your comments dated April 4,2003. The following numbers correspond to the comments: Engineering 45. JR Engineering has reviewed the right-of-way issues along Timberline Road and Harmony Road and would like to set up a meeting with the city as soon as possible to discuss what we have determined. Please notify me which city personnel you would like to attend this meeting so that I can set this meeting up. 46. See comment response by Cityscape. 47. Plat and utility drawings have been revised to show a 9-foot utility easement along the south side of Milestone Drive. A easement will be added to drawings along the north side of Harmony Road once it is determined what type of easement will be required per utility companies. 51. Per JR Engineering's phone conversation with Tess Jones of CDOT on Wednesday 5/7/03 Tess informed JR Engineering to submit an existing striping plan for Harmony Road and a current Traffic Impact Study (TIS) for her review. Tess will then determine what will be required and at that point an Access Permit Application, fee, and whatever else Tess deems necessary will be submitted at that time. 52. The City of Fort Collins owns and maintains the tract between this development and the development to the north "Sunstone Village PUD". The city has agreed to sign off on whatever documentation is required as discussed in city meeting on Monday 4/7/03. 53. A Type III barricade was added along the eastern boundary at the termination of private drive and internal sidewalk of the site. 54. Noted. 58. A blanket cross access easement will be provided for the entire development as noted on the plat and will also be covered in the Developer's Agreement. Plat 43. The repair guarantee provision has been moved. 2620 East Prospect Road, Suite 190, Fort Collins, CO 80525 X: 934700 / Corresp / Letters / commentresponseletter 970-491-9888 • Fax: 970-491-9984 • ww ejrengineering.com