Loading...
HomeMy WebLinkAboutTIMBERLINE VILLAGE - HARMONY SCHOOL SHOPS, 4TH FILING - PDP - 10-03 - CORRESPONDENCE - (3)Yours Truly, Ted Shepard City Planner Page 8 The bike lanes shown on Harmony Road need to be located along the outer edge of the road and transition between the through lane and right turn lane at Timberline closer to the intersection. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Landscape Number: 35 Created: 3/31 /2003 As previously indicated, Show all existing and proposed water/sewer lines on the landscape plans and provide the required landscape/utility separation distances. Maintain 10 feet of separation between light poles and water sewer lines. Topic: Plat Number: 34 Created: 3/31 /2003 As previously indicated, Provide utility easements for all curb stops and fire hydrants. Topic: Utility Plans Number: 37 Created: 3/31 /2003 As previously indicated, Remove all unnecessary text from the overall utility plans to provide more clarity. Number: 39 Created: 3/31 /2003 As previously indicated, Include standard general notes on the overall utility plan pertaining to poly wrapping D.I.P. Remove the general note to joint deflect water mains vertically to avoid utility crossing. Clearly define all locations of conflict of water mains and other utilities. Provide all information necessary for water main lowerings. Number: 91 Created: 6/6/2003 Show and label all location of proposed as well as existing curb stops. Number: 92 Created: 6/6/2003 Reconfigure storm sewer and water main layout between bag 8 and 9 to avoid multiple utility crossings as well as several unnecessary fittings on the water main. Number: 93 Created: 6/6/2003 Provide the design specification for our review for the geoweb proposed for the access road on the sanitary sewer main. The sewer cleaning trucks are approximately 40 to 45 tons. A "grasscrete" type system may be needed to carry loads in this range. Number: 94 Created: 6/6/2003 Maintain 10 feet of separation between the fire hydrant adjacent to bldg 3 and the trash enclosure for bldg 3. See site, landscape and utility plans for more comments. Department: Zoning Issue Contact: Peter Barnes Topic: zoning Number: 72 Created: 5/21 /2003 Near the northeast corner of the Albertsons building on the site plan there's a note that says "Lot Line (typ)" with an arrow that points to nothing. The arrow needs to point to a lot line, so the note needs to be moved, or a lot line needs to be drawn. Red -line drawings are available at the Current Planning front desk. Red -lined Engineering drawings will be forwarded under a separate cover. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Page 7 Call out all inlet sizes and types on the overall utility plan. Call out types of pipe used for drainage. Please specify if these DP (Drainage Pipes) will be RCP Class III, ADS etc... ?? There are still many areas that are unreadable on the plans. The overall utility plan is too busy with text notations. Please reroute the storm sewer to the southeast of building 8 in a manner that would minimize the amount of crossings over the proposed water line. Please maintain a minimum 18" vertical clearance between sanitary lines and storm lines whenever possible. The overall utility plan has many unreadable/overlapped labeling. Please clarify and correct. Legend is missing on some of the plans. - Please provide a phasing plan. Clarify what will be built with first phase, how will future phases be dealt with in the interim, will they be overlot graded and stabilized ?? Department: Traffic Operations Issue Contact: Eric Bracke Topic: Transportation Number: 69 Created: 5/20/2003 There have been discussions and preliminary designs for a channelized 'T' intersection at Timberline/Milestone. The new set of plans shows a full movement intersection without the benefit of the channelizing medians. Why? If the developer has decided not to go with the chanellized 'T', then a full median will be constructed resulting in a right-in/right-out access at Timberline/Milestone The connection to the east has not changed. It still appears circuitous and meanders through the parking lot rather than functioning as a true cross access. Department: Transportation Planning Issue Contact: Tom Reiff Topic: Transportation Number: 27 Created: 3/28/2003 Harmony corridor is identified as a future Enhanced Travel Corridor' and Timberline will be a high frequency corridor on the City's Long Range Transit Plan. According to the LUC (4.19 (E.1c) neighborhood commercial centers are major stages for the transit network (existing or future). Integration of a transit stop needs to be included in future submittals. A meeting with Transportation Planning and Transfort is requested to discuss the stop locations. (FOLLOW UP COMMENT 6-2-03) The proposed right turn lane into the site from Timberline will suffice as the future transit stop on the Timberline corridor. However, the Harmony stop needs to be located as close as possible to the primary driveway and walkway system into the site (see red lines). Even though no concrete pads will be required at this time, please show on the site plan the walkway connection, landing area, and shelter pad. (see redlines for stop locations) Number: 28 Created: 3/28/2003 The proposed private drives that provide cross access to the eastern property need to be realigned and more direct. (Follow Up Comment 5-29-03) Since the City is not requiring a public street connection to the east, the primary east -west drive aisle should be designed to function similar to a street. Furthermore, this drive access may become very important for this development if the 3/4 turn movement from EB Harmony Road is closed at some future date, which according to CDOT is very likely. Please see the provided sketches for the reconfigured drive aisle and intersection. Number: 32 Created: 3/28/2003 Directional access ramps are required within the public Right of Way. Please install directional ramps at the two drive aisle entrances off of Milestone Drive (see red lines). An additional ramp on the north side of Milestone Drive is required to align with the ramp directed to the north. Also change the radial style ramps shown at the Harmony Road access to east to west directional ramps only. (Repeat Comment 5-29-03) Please show directional access ramps at the drive way intersections with Milestone Dr. in accordance with the LCUASS (see red lines). Number: 89 Created: 6/2/2003 Page 6 Delete the grading and erosion control notes (Larimer County Urban Street Standards) from the note sheet #2 of 20. The erosion control plan is very incomplete. Among other things missing are the notes, schedule, BMP legend, etc. Please complete your plan properly and resubmit. Topic: Grading Plans Number: 62 6/4/03 Created: 4/7/2003 Show spillway location. Call out berm and spillway elevations. Provide a spillway detail. Provide spot elevations, call out all high points and low points. Use different line thicknesses for proposed contours, building footprints and property lines. Please call out the pan elevations in the pond. Why does it end suddenly end where it does??? clarify grades. Specify which existing trees in the detention pond will be affected by regrading operations. Please provide mitigation since these trees provided a buffer for the residences to the north. Please tie in contours to neighboring properties. Label existing contours. Topic: Off -site Drainage improvements Number: 63 Created: 4/7/2003 6/4/03 The off -site storm sewer improvements that were built previously by the developer were not certified to the City, please provide one. During a site visit it was observed that the areas disturbed during the installation process were not adequately vegetated/seeded. This should be done prior to the approval of this project. Topic: Plat Number: 60 Created: 4/4/2003 6/4/03 Does the area where the existing detention pond from the previous filing is located have a drainage easement on it. If yes, then you need to vacate any existing drainage easement no longer needed on the plat. Topic: Storm sewer profiles Number: 66 Created: 4/7/2003 6/3/03 Specify maintenance responsibility for all storm sewers. City will only maintain lines in the public ROW. Number or name different storm lines. Call out clearance from proposed sanitary sewer and water lines. Some clearances, Le the sanitary sewer clearance by STMH-1 seem to be very small. Please keep 10 year HGL within the pipe. Topic: Utility Plans Number: 61 Created: 4/4/2003 6/4/03 Provide a legend. Identify what DP stands for (Drainage Pipe). Please call out existing storm sewers. Reference detail sheet for facilities. Page 5 Number: 78 Created: 5/29/2003 Remove shrubs at the electric vault located 120' NE of Building 5. (See Overall Utility Plan 10 of 20 and Landscape Plan 5 of 14) Number: 79 Created: 5/29/2003 Use caution when Installing trees over primary electric lines. See Utility and Landscape Plans. Number: 80 Created: 5/29/2003 Buildings 7 and 8 use a shared transformer. Will need to know the electric load for both buildings to determine final transformer size. Number: 81 Created: 5/29/2003 State Highway Permits will be needed for installation of electric system along Harmony. Developer is responsible for obtaining all required construction permits. Number: 82 Created: 5/29/2003 Electric lines will need to be in an easement. Show electric/utility easements or a blanket easement on the plat. Number: 83 Created: 5/29/2003 Transformer for Building 6 is next to the north building wall. A window or door will not be allowed next to the transformer. Number: 84 Created: 5/29/2003 Contact Xcel Energy to underground the overhead electric line on Harmony. Due to adjacent water lines this line may need to be installed joint trench with the Cities new electric line. Department: Stormwater Utility Issue Contact: Basil Hamdan Topic: Details Number: 67 Created: 4/7/2003 6/4/03 Please provide a concrete reinforcement detail for the water quality outlet box Topic: Drainage plan Number: 65 Created: 4/7/2003 6/4/ 03 Provide Legend. Use one sheet if possible. Please call out inlet sizes, pipe sizes etc... on utility plans rather than on drainage plan. Show existing lines in a different line type than proposed ones, Topic: Erosion Control Number: 64 Created: 4/7/2003 Second Review June 3, 2003 The plan is still incomplete and difficult to follow, please correct. March 7, 2003 Page 4 does not move forward, the construction would need to fall upon this development; there would be reimbursement available from Street Oversizing for this. Number: 88 Created: 6/2/2003 Based on CDOT requirements (given the existing posted speed limit), when Harmony Road is widened to 6 lanes, the required stacking for the dual -left turn lanes might eliminate the 3/4 turning movement into the site, reducing the driveway out to Harmony Road as a right -in, right -out movement. Topic: Plat Number: 70 Created: 5/21 /2003 There are numerous areas defined internal to the plat that are not locatable. Number: 74 Created: 5/22/2003 Note 1 on the plat is a potential concern. The blanket easement being created by the note technically results in all buildings being built on this easement (and perhaps legally prevents the buildings from being built) because building envelopes aren't defined on the plat. Number: 90 Created: 6/5/2003 Technical Services offered the following comments: 1. Boundary & legal closes 2. Plat does not meet requirements of Sections 1.2.2 and 1.2.4 in Appendix E-6 of the Larimer County Urban Area Street Standards. 3. Comments from March 26, 2003 Sheet have not been addressed. (#2 & #6) 4. If lot lines to be vacated were removed the plat would be cleaner. 5. Drainage/detention area at NEC of plat needs a Tract #. 6. Some easements are not locatable. Topic: Site Plan Number: 71 Created: 5/21 /2003 Please add a note on the site plan indicating that: "Buildings 3, 4, 5, and 6 are approved with regards to land use only. Subsequent development of each building will require City approval of site specific utility plans (prepared by a licensed engineer in the State of Colorado) for the area surrounding each building currently noted as "Future Phase" on the Harmony School Shops 4th Filing utility plans. Said approval shall be in conjunction with an associated minor or major amendment (as applicable). Drainage reports, erosion control deposits, and inspection fees may also be required with the development of each building." A similar note will be required on the development agreement for the project. Topic: Transportation Number: 85 Created: 6/2/2003 The TIS notes approach speeds on Harmony as 45 mph instead of 50 westbound, 55 eastbound. The TIS should correct this information and if any of the numbers generated in the report are dependent on posted speed, those results should likewise be amended. Number: 86 Created: 6/2/2003 The TIS shows a drop in total peak hour traffic on some movements in the Harmony/Timberline intersection when compared to the 2015 numbers in the PVHS study. The TIS should explain why this change occurs. Number: 87 Created: 6/2/2003 The TIS shows EB Harmony to NB Timberline turning movements at 8 (AM) & 6 (PM) while the some turning movement into the site off the 3/4 access directly east is at 61 (AM) & 123 (PM). The TIS should explain how this distribution split was determined. Department: Light & Power Issue Contact: Alan Rutz Topic: General Number: 77 Created: 5/29/2003 Transformer behind Building 1 must be accessible by an electric line truck. Provide a detail of the proposed transformer enclosure. Page 3 Number: 53 Created: 4/1 /2003 Show the installation of a Type III barricade along the eastern boundary of this site at the termination of the private drive, as well as the internal sidewalk system. (6/4/03) With the need to construct a sidewalk to Snow Mesa to meet LOS requirements, the Type III barricade is no loner needed. Number: 54 Created: 4/2/2003 Letters of intent are required for all offsite easements prior to the scheduling of a hearing. This appears required for the property to the northeast as well as southwest. (6/4/03) The owner of the mobile home park also needs to sign a letter of intent for the sidewalk connection. Number: 58 Created: 4/2/2003 The existing cross access easement shown on the plat, which would facilitate connectivity to the east, does not line up with the driveway connection shown on the plans, which has been moved north. A cross access easement will need to be maintained at the finalized location for the driveway connection to the east. (6/4/03) Please ensure that cross access is maintained to the east by showing an access easement on the plat starting from the access point off Harmony north then proceeding east along the driveway which is meant to continue east into the future developable area. In addition, the site plan should make reference to the driveway continuing east upon development of the neighboring property. Number: 68 Created: 5/16/2003 It was not noted initially that Timberline Village is an existing name of a recorded plat in the City; the documents cannot have Timberline Village as the name associated with the City. The name on all the documents should be changed to Harmony School Shops 4th Filing. This also allows for this project to be filed in the same physical location as the previous filings of Harmony School Shops. Number: 73 Created: 5/21 /2003 Both the site plan and the utility plan needs to show a design for the 6' asphalt walk indicated on the site plan to connect to Snow Mesa Road. Number: 75 Created: 5/22/2003 Based upon discussion among City Transportation on 6/5, it was concluded that additional right-of-way along Harmony Road adjacent to this site is not required. This is a result of the determination that the right-of-way in place today will 'Work" in the ultimate 6-lane configuration of Harmony Road. Future edge of pavement to determine the 80' setback should still be verified. Number: 76 Created: 5/22/2003 Based upon discussion among City Transportation on 6/5, the horizontal alignment of the channelized-T design is satisfactory. The following items related to this design though, does need to be addressed. 1. Cross sections along the channelized-T at 50' intervals (as well as critical point such as median noses) are needed to verify drainage patterns and vertical "ride". Also provide spot elevations on any plan view. 2. Indicate curb type along the medians for the channelized-T proposed and provide a detail. 3. Turning movements for large vehicles (WB-50) need to be verified on this design, especially because of commercial trucks using this to serve the site and it allows them to head east on Harmony Road. 3. The proposed design is considered safe from a Traffic Operations standpoint, provided that the work north of Timberline (as being designed by North Star Design) is completed concurrently. The channelized-T without these improvements is a safety issue. It is required that this offsite design is approved concurrently with these plans if not already approved with the Caribou Apartments project. This may involve needing to place the plans from North Star into this submittal or getting North Star to separate this plan set out from the Caribou Apartments design to be approved independently. In addition, this offsite construction will need to be done prior to or concurrent with the channelized-T construction. As Caribou Apartments is under final compliance review, this may not be a concern, but if that project Page 2 STAFF PROJECT REVIEW City of Fort Collins CITYSCAPE URBAN DESIGN Date: 6/11/2003 JOE CARTER 3555 STANFORD RD. #105 FT. COLLINS, CO 80525 Staff has reviewed your submittal for TIMBERLINE VILLAGE PDP - TYPE II (LUC) #10-03, and we offer the following comments. This letter does not include Current Planning Department comments, which will be forwarded under a separate cover. ISSUES: Department: Engineering Issue Contact: Marc Virata Topic: General Number: 45 Created: 3/31 /2003 The internal parking lot and building layout design will likely be altered due to additional right-of-way width required on Harmony and Timberline Roads. Harmony Road requires an additional through lane per the City's Master Street Plan. Timberline Road also requires additional lanes and per the TIS, also requires additional right-of-way for the channelized-T intersection design with Milestone Drive. Interim/ultimate street designs are needed (which will also require CDOT approval) this will help establish right-of-way, utility, & Harmony Corridor setback requirements. (6/4/03) The plat appears to reflect the additional right-of-way required on Harmony Road correctly. However, this change in property line is not reflected on the horizontal control plans, Using the City's horizontal control plan for the Harmony Road alignment, it then appears as a result that the building placements fall short of the 80' setback from the future edge of pavement. Because the channelized-T design along Timberline has not been completed, there may be right-of-way impacts of the design which in turn may affect the building placement along Timberline. Number: 47 Created: 3/31 /2003 Ensure 9' utility easement is provided on Milestone Drive, 15' utility easements are provided on both Harmony and Timberline Road behind the ultimate right-of-way for each, and 80' of setback for the Harmony Corridor plan behind the future edge of pavement (6 lane section) for Harmony Road. (6/4/03) 15' of utility easement along Harmony Road is not evident on the plat. In addition, 80' of setback from the future edge of pavement is also not evident on the plat. Number: 51 Created: 4/1 /2003 Utility, access, and landscape permits are likely to be required by CDOT as the project continues. (6/4/03) It should be verified who will be working on the permit for CDOT to underground the overhead line within the development. Because I believe the line is Excel's, they likely need to be working with the Developer for that portion of the utility permit. Number: 52 Created: 4/1 /2003 The tree protection/mitigation plan shows landscaping to be removed/relocated outside of the property boundaries. Because this is off -site, the off -site easement required should also include a provision for tree removal/relocation. Another option is for the off -site property owner to sign off on the tree mitigation plan. (It appears that the offsite and onsite entities are one in the some, so this shouldn't be an issue). (6/4/03) Prior to a hearing, the landowner to the north should indicate if any issues exist on the proposal. Page I