screening between the supermarket loading area and the Harmony Mobile Home
Park The screening is located on the mobile home park side.
35. The applicant should be aware that pad users that desire a national prototype
identity would be subject to Section 3.5.3(D) which calls for compatibility with
the context and character established by the center and surrounding neighborhood.
Consequently, such standard corporate architecture would be modified
accordingly.
■ All architecture is proposed to be compatible with each other. Please see the
provided elevations for more detail.
36. In order to promote a more attractive streetscape along Harmony Road, Staff
would be interested in seeing alternative layouts for Pad C. For example, the
reverse mode layout should be investigated where the c-store is placed along
Harmony and the gas pumps and canopy is, more internal to the center.
■ The convenience store and gas station use have been eliminated from this plan.
37. A neighborhood information meeting will be required. It is recommended that the
meeting take place as close to submittal as possible. The Planning Department
will create the notification map for the neighborhood meeting. Please notify the
Planning Department at your earliest convenience if you desire to proceed to this
next stage.
A neighborhood meeting was held at the Harmony School on July 25, 2002. Staff
facilitated that meeting and minutes were taken. Few changes to the Site Plan
have been made since the meeting. The most significant change to the plan was
the elimination of the convenience store and the gas station from the proposal.
The west side of Building 9 (formerly Pad H) has been designated as an outdoor
activity area. Additional outdoor activity areas include both ends of Building 7
and both ends of Building 8.
29. All restaurant pads should include outdoor dining opportunities with permanent
patios or moveable furniture on wide sidewalks or plazas.
The applicant has concentrated the outdoor dining spaces on the interior of the
site because of the greater separation from highway noise. Opportunities for
outdoor dining exist on the two larger restaurant pads adjacent to. Harmony
Road.
30. Restaurant pads will need an area for solid screen walls for dumpsters, loading,
and the outdoor -facing portion of the walk-in cooler/freezer.
■ Solid screen walls have been provided around dumpsters and loading areas
where applicable. Additional landscape plantings have also been proposed
surrounding these areas.
31. The convenience store should also include an outdoor patio. Please see the
Schrader Country Store in the Harmony Village Shopping Center as an example.
The convenience store and gas station use have been eliminated from this plan. A
small 4000 square foot restaurant/retail use has replaced this use.
32. Much more landscaping/berming will be needed to buffer the gas pump area
along Harmony Road. Generous use of evergreens may be needed for year-round
screening.
■ The convenience store and gas station use have been eliminated from this plan.
33. In terms of architecture, the developer should draw upon the character established
by the original Harmony School and its sensitive gymnasium addition. Sections
3.5.1(A — F) address compatibility issues.
The applicant's architect, Vaught Frye, has used similar brick and integrally
colored masonry block to provide textural relief and detailing similar to Harmony
School, Schraeder's and the Hospital. The signature "tulip" design has also been
incorporated throughout the project in prominent locations — such as entries - to
contextually relate to the adjacent developments.
34. The Harmony Mobile Home Park will need more screening than shown in order
to buffer the loading area.
■ Asper discussions with City Staff, the total parking count for the entire shopping
center (including this new development, the Harmony School, the Diamond
Shamrock and the approved Harmony School Shops 3rd Filing) will be allowed
only 5 spaces per 1000 square feet. The revised Community Shopping Center
square footage, of 15Z 643 square feet of development for the entire Community
Shopping Center, the maximum allowable number of parking spaces allowed is
764. In total, we are proposing 752 parking spaces. Please see the cover sheet of
the site plan for a more information.
26. The double drive -through lane on the south side of Pad A is discouraged. Ingress
and egress appear awkward. There are conflicts in that the location is at the
intersection of the two main drive aisles for the center plus the carwash exit lane.
The drive -through creates unnecessary impervious surface requiring water quality
treatment and stormwater detention. Idling cars contribute to the tailpipe
emissions that create our brown cloud during atmospheric inversions. Informal
evidence leads Staff to conclude that these facilities are rarely used. This space
could be better used as a public pedestrian area with landscaping rather than given
over to the private individual needs of the automobile.
■ At staffs request, the pharmacy drive thru lane associated with the supermarket
has been eliminated.
27. As we have discussed in prior meetings, there needs to be direct and well -
designed pedestrian sidewalks, plazas, and other amenities to promote walking
from both the Sunstone and Harmony Mobile Home Park neighborhoods. The
plaza between Pads F and G appears to be crowded by the loading zone. Perhaps
this loading zone does not need to be extended so far north. The drive aisle
between Pads G and H should be designed to be "street -like" with sufficient
cross-section or wide sidewalks for bicycles. If necessary, street trees could be
placed in tree grates in order to accommodate a wider sidewalk. Staff
recommends that the developer take inspiration from City Comforts, by David
Sucher, City Comforts Press, Seattle, 1995. This book provides numerous ideas
on how to add pedestrian and bicycle amenities into retail shopping center. ,
■ Direct pedestrian walkways have been incorporated into the design to provide
connections from Sunstone and the Harmony Mobile Home Park to the shopping
center. Primary pedestrian connections have also been created to Milestone,
Timberline Road and to Harmony Road. Each building has at least one
uninterrupted pedestrian access to a connecting walkway. A pedestrian plaza has
been created between buildings 7 an 8 to provide a spot for outdoor gatherings
and dining.
28. The west side of Pad H should be designated as a pedestrian plaza as well.
■ The applicant's engineer has held discussions with the city regarding the CDOT
Access Permit. The outcome of these discussions stated that the applicant will
pursue this issue after the application has been submitted.
21. If there exists overhead electrical lines along Harmony, then this line should be
placed underground. This line may be owned by R.E.A.
■ There do exist overhead electrical lines along Harmony Road and those lines are
will be buried.
22. A replat is preferred to vacate unneeded easements and to dedicate new
easements. Also, after consultation with.CDOT, Staff will determine if any
additional right-of-way is needed along Harmony Road.
A replat is proposed to vacate unnecessary easements and to dedicate new
easements. The applicant's engineer has been in contact with CDOT regarding
additional right-of-way and no additional right-of-way is needed.
23. A Fugitive Dust Permit will be needed from the Larimer County Health
Department during the construction phase. The trash collection system should
include facilities for recyclable materials. Native plants and grasses are
encouraged versus irrigated blue grass sod. Check for prairie dogs and burrowing
owls prior to grading. For further information regarding any natural resource
issues, please contact Doug Moore, 221-6750.
A Fugitive Dust Permit will be acquired before construction. Native seeding will
be utilized where allowed. Blue grass sod is proposed within the 80 foot
Harmony setback.
24. The existing trees should be evaluated by Tim Buchanan, City. Forester.
Significant trees should be preserved. If not, then trees lost to construction must
be mitigated as per the formula in the Land Use Code. Undesirable species such
as Siberian Elm and Russian Olive, or other non-native trees should be removed.
For further information, please contact Tim Buchanan, 221-6361.
■ The applicant's representative met Tim Buchanan on site on February 19`4. The
plans reflect the outcome of that meeting. Trees over 6" in diameter will be
replaced at a ratio of 3:1. These trees will be a minimum of 3 " in diameter or 8
feet tall.
25. The parking calculation lists the potential uses individually. This would not be
the correct approach as all parking within the center would be available to any of
the individual businesses. Section 3.2.2(K)(2) refers to the land use category
"shopping center." This category is allowed a maximum five spaces per 1,000
square feet resulting in a maximum of 537 spaces.
■ So noted. Thank you.
15. In addition, the City collects the Larimer County Road Impact fee.
■ So noted. Thank you.
16. A Transportation Impact Study will be required. Please contact Eric Bracke to
determine the scope of the study. This study will help determine the extent of off -
site street improvements necessary to mitigate the impact of the project on the
public street system. For example, it is difficult to imagine not constructing an
off -site connection to the future signalized intersection at Harmony Road and
Snow Mesa Drive. Such a connection may need on -street bike lanes and detached
sidewalks as well. The Transportation Impact Study (T.I.S.) must also perform a
Level of Service analysis for alternative modes. Enhanced crosswalks should be
provided across the internal drive aisles. For further information, please contact
Tom Reiff, 224-2040.
■ A T.I.S. has been included with this submittal package. Enhanced crosswalks
have been added to the site plan.
17. In the future, there will be bus service along both Harmony and Timberline
Roads. The location of future bus stops should be determined with the
development proposal so sidewalk connections can be made. Please contact
Gaylene Rossiter, 221-6620 for further information.
■ TransFort was contacted regarding the proposed bus service location. At that
time TransFort stated that all routes were being reviewed and that no
determination has been made on future stop locations. Further contact with
Gerald Smith is pending.
18. The standard Utility Plan, Development Agreement and Development
Construction Permit will be needed. For further information, please contact Sheri
Wamhoff, 221-6605.
■ The standard Utility Plan, Development Agreement and Development
Construction Permit have been discussed with Sheri Wamhoff.
19. A repay is due for public improvements along all three public streets.
■ So noted. Thank you.
20. The private access drive off Timberline may need an updated Access Permit from
CDOT. The City will process the application.
10. The site is located in the Fox Meadows drainage basin where the new
development fee is $6,468 per acre, subject to the runoff coefficient.
■ So noted. Thank you.
11. The standard Drainage Report, Erosion Control Plan, Grading and Drainage Plan,
prepared by an engineer licensed in Colorado are required at the time of submittal.
■ A Drainage Report, Erosion Control Plan and Grading and Drainage Plan
prepared by a Colorado licensed engineer are included with this submittal.
12. The detention pond will need to be enlarged to accommodate the increased runoff
and meet the present rainfall requirements. The detention volume needs to be
determined using SWMM. The volume increase needed can be a percentage of
the total volume since the previous rainfall requirements were different for the
existing developed areas. The spillway should be designed to accommodate the
entire 100-year developed flow including the new hydrology for the whole basin.
The outfall system for the pond was redesigned and may have been built with a
previous proposal. That system, if built, has not been certified. Also, there may
be some repair needed on the pan if what is there now is the final pan.
■ The applicants engineer has met with City of Fort Collins Utility department
regarding the detention pond. The pond has been sized per agreement with the
utility department using SWMM.
13. The Stormwater Utility presently maintains the Sunstone Subdivision detention
pond. It was determined during the last review process that the City would
maintain the whole pond even though new developments are now required to
maintain their detention ponds. Stormwater maintenance; however, will only be
provided if the expanded ponds meet certain requirements such as being seeded in
drought -tolerant natural grasses needing mowing only 3-5 times/year. In addition,
side slopes must be 4:1 maximum and concrete pans are required for bottom
slopes less than 2%. For further information, please contact Glen Schlueter, 221-
6681.
■ The applicant's engineer has designed the pond within parameters agreed upon
with the City of Fort Collins Stormwater Utility department. The pond will be
seeded with drought -tolerant natural grasses. In addition the side slopes will not
exceed 4:1.
14. The Street Oversizing Fee will apply, due at the time of building permit issuance.
Please note that these fees are adjusted annually. The fees vary depending on the
land use based on trip generation. For example, for general retail, the fee is $4.03
per square foot. Fees are considerably higher for the convenience store with gas
pumps. For further information, please contact Matt Baker, 221-6605.
■ The applicant's representative attended a utility coordination meeting to discuss
these issues and the results of those meeting are shown on the plans. The utility
coordination meeting was held on February 12, 2003 at the City of Fort Collins.
Trees will be kept away from all existing and proposed utility easements.
6. There would be a long service line needed to serve Pad H. Meter pits should be
located near mains.
■ The applicant's representative attended a utility coordination meeting to discuss
these issues and the results of those meeting are shown on the plans. The utility
coordination meeting was held on February 12, 2003 at the City of Fort Collins.
Service line and meter pit locations were discussed at the February 12, 2003
meeting. The results of those discussions are reflected on the plans.
7. Water conservation standards for landscaping shall apply. Plant investment fees
and the raw water acquisition charge are due at building permit. The Water and
Sewer Department has a separate plan check fee. For further information, please
contact Roger Buffington, 221-6681:
■ Water conservation standards for landscaping have been implemented. Turf grass
has been limited to the 80 foot Harmony setback zone and a few other isolated
locations within the project. Non -irrigated native seed is proposed within the
detention pond. New trees within the detention pond will be drip irrigated as well
as all shrub beds and trees within the project boundary.
8. The Poudre Fire Authority will require that a fire hydrant be installed to serve the
site capable of delivering a minimum of 1,500 gallons per minute at 20 psi.
residual pressure. The access drive can be private but must be dedicated as an
emergency access easement with curbs painted red and signs stating "No Parking
— Fire Lane."
■ The applicant's representatives have held additional discussions with Ron
Gonzales regarding hydrant locations and fire lane widths. As a result of these
discussions, an additional hydrant has been located between buildings 9 and I
and additional width has been provided to the parking lot aisles around buildings
3 and 4. All hydrants will meet the requirements listed above, the private drives
will be dedicated as emergency access easements, curbs will be painted red and
signs will be posted stating "No Parking — Fire Lane ".
9. Any building with over 5,000 square feet of uncontained floor area must be
equipped with an automatic fire extinguishing system. For further information,
please contact Ron Gonzales, 221-5670.
■ All buildings over 5, 000 square feet will be equipped with an automatic fire
extinguishing system.
full description of the requirements of land development along Harmony Road in
general and development of a neighborhood shopping center in particular.
■ An 80 foot setback from the future edge of pavement along Harmony Road has
been created as per the Harmony Corridor Standards and Guidelines. An 8-foot
wide trail, berming and landscape plantings (per the Harmony plant palettes)
have been provided within the 80 foot setback zone.
3. Electrical power can be extended to the site from both Timberline and Milestone.
The location of the transformers must be coordinated with Light and Power.
Transformers must be within ten feet of hard surface.for emergency change out
and screened from public streets as best as possible. Normal development
charges will apply. Any modification to the existing system will be at the
developer's expense. Electrical facilities are typically served from the front of the
lot. Joint trench is possible with telephone, cable TV. and internet broadband
providers if these utilities cannot access lots from the rear. The street trees behind
Pad "G" along Milestone must be placed in the parkway between sidewalk and
curb, and spaced 40-feet (ornamental trees 15-feet) from streetlights.
■ The applicant's representatives have met with the City of Fort Collins and other
utility providers at a utility coordination meeting to review the proposed utility
plans. The street trees behind Building 8 (formerly Pad "G') have been
relocated into the parkway strip along Milestone Drive. City of Fort Collins
standard street tree placement/separation as been met.
4. If the internal streets are private, then no public street -lighting will be provided.
Please note that all private light fixtures must be down -directional and feature
sharp cut-off luminaires. Light will not be allowed to spill over the property lines.
The use of high pressure sodium is strongly encouraged in order to match public
street lighting and for energy conservation purposes The applicant should be
keenly aware that there are new under -canopy maximum allowable lighting
levels. A Lighting Plan will be a submittal requirement. For further information,
please contact Rob Irish, 221-6700.
■ All streets within the development are private and it is noted that no public
streetlights will be provided. The developer will provide site lighting. All light
fixtures are down directional and feature sharp -cut off luminaries. Minimal light
spills over property lines. There are no gas station uses proposed with this
development so under canopy lighting is no longer an issue.
5. There are existing utilities within the site that were installed in conjunction with
earlier filings. The Water and Wastewater Department requires that sanitary
sewer mains be within a 30-foot wide easement and water mains be within a 20-
foot wide easement. It is preferred that water and sewer mains be placed under
hard surface. All existing easements should be retained. Trees should be kept
away from underground utilities in accordance with existing specifications.
cuoffin@@P@
urban design, inc.
3555 stanford road, suite 105
February 27, 2003 fort collins, Colorado 80525
(970) 226-4074
fax (970) 226-4196
Ted Shepard a@cityscapeud.com
City of Fort Collins
Community Planning and Environmental Services
P.O. Box 580
Fort Collins, CO 80522
RE: Timberline Village PDP — Conceptual Review Comments and Responses
Dear Ted,
Included below are the comments received from City Staff regarding the April 4, 2002
Conceptual Review for Timberline Village (Harmony School Shops). An explanation (in italics)
of how issues have been addressed follows each comment.
COMMENTS:
1. The project is zoned H-C, Harmony Corridor. This particular comer is defined as
being eligible for either a "Neighborhood" or "Community" shopping center,
subject to review by the Planning and Zoning Board (Type Two). Within the
"Neighborhood" center, the supermarket cannot exceed 49,000 square feet.
Therefore, the proposed 52,443 square foot supermarket would not be permitted
except as allowed per the Request for Modification to the Planning and Zoning
Board. The parking lot must feature no less than 10% interior landscaping.
Bicycle parking shall be provided at each building entrance, including the
convenience store. All trash areas, utility meters, electrical transformers and
loading docks must be screened from view from adjacent properties and public
streets.
It is noted that this project is subject to a Type Two review and is eligible for
either a "Neighborhood" or "Community" designation. This project received
approval for two modifications on September 5, 2002. The two modifications
were: 1) to increase the square footage of the shopping center from 49, 000 sf to
52, 443 square feet, 2) to increase the dimensions of some of the parking stalls
from 9' x 19' to 10' x 19.5'. The parking lot exceeds the minimum 10% interior
landscaping requirement and all trash areas, utility meters, transformers and
loading docks are screened with either plant material or solid masonry walls.
2. The 80-foot setback from Harmony Road is measured from the future edge of
pavement. Please refer to the Harmony Corridor Standards and Guidelines for a