HomeMy WebLinkAboutTHE FARMSTEAD - FDP - 8-03 - CORRESPONDENCE -Project: ���t�y,�e�
� � Dater a y
Planner: 5L7� e�2Li Traffic Operations: Engineer: '1 441— �
ems Requested
Kedlinedems Being Keturned
c
°
Z.
0
v
�,
c
'm
o
Other Items R Required
�1
°'
cn
C
m
a
Z.
�
D
v .
a a
•�
0
Other Items being
Returned
Engineeringk
k
Stormwater
x
Water/Wastewater FCLWD
k
x
Traffic Operations
Trans ortation Planning
Transfort
En ineerin Pvmt.
Light & Power
Technical Services
PFA
TOTALS _
,.
1
Other:
Note: All redlined items should be returned With the resubmittal/revisions.
Please call 22.1-6750 to schedule a resubmittal
appointment,
If you have any questions regarding these issues or any other
issues related to this -project, please feel free to call me at
221-6341.
You s Truly,
Steve Olt, V
City Planner
Cc: Marc Virata
Wes Lamarque
Jeff Hill
DMW Engineers
Current Planning File #8-03
Page 6
Department: Water Wastewater
Topic: General
Number: 106
[7/1/04]
Issue Contact: Jeff Hill
Created: 10/14/2003
[4/29/041
As previously indicated!
Show all gas and electric mains on the overall utility plans.
Maintain 4 feet minimum separation between curb stop/meter
pits and all gas/electric mains. Maintain a 4 feet minimum
separation between meter pits and all building envelopes.
Topic: Utilities
Number: 189 Created: 7/2/2004
[7/2/04] Show and label existing as well as proposed water
mains, curb stops and meter pits on the overall utility plans.
Field locate and show water lines for "C" store on northeast
side of LaPorte Avenue and Taft Hill Road.
Number: 190 Created: 7/2/2004
[7/2/04) Provide elevations on the proposed water main and
sanitary sewer service crossing at Building 2, Lot 3.
Maintain 18-inches of vertical separation between sewer and
water. Concrete encase sanitary sewer if above or within 18-
inche of water main.
Number: 191 Created: 7/2/2004
[7/2/04) Provide 10 feet of utility easement on both sides of
the proposed sanitary sewer main. Provide concrete encasement
detail on detail sheet.
See site, landscape and utility plans for other comments.
This completes staff (and outside reviewing agencies) review
and comments at this time. It is possible that these issues
can be addressed without going through another formal round of
review. Please contact Engineering, Stormwater, and
Water/Wastewater to work out arrangements on how to respond to
these comments. This proposal is subject to the 90-day
revision re -submittal requirement (from the date of this
comment letter, being July 14, 2004) as set forth in section
2.2.11(A) of the Land Use Code. Be sure and return all red -
lined plans if / when you re -submit. .
Page 5
6. What will protect LaPorte Avenue from sedimentation during
the construction of the new road construction that will act as
a south to north funnel for stormwater and sediments?
Topic: Grading Plan
Number: 180 Created: 6/30/2004
[6/30/04] Please call out the landscape wall top and bottom
of wall elevations. Provide a detail for the proposed
landscape wall.
Topic: Storm sewer profiles
Number: 167 Created: 4/30/2004
[6/30/041
Still need a profile for the pipe north of building 2.
[4/30/04] Please provide a profile for all .proposed storm
sewers and for the box across Pennsylvania Street.
Topic: Utility Plans
Number: 164 Created: 4/30/2004
[6/30/041
The revised pond outfall plans call for a 24" CMP and a swale
from the junction box north to the outfall on Taft Hill Road.
Please provide a detail for the the proposed grate over the
junction box.
Please call out a seeding for the swale and provide erosion
protection during construction.
Please provide buried riprap at the downstream end of the
pipe.
This pipe is on County ROW and serves City property, there
will need to be an agreement between the City and the County
as to who is responsible for maintenance of this pipe.
Apparently the pipe is in its entirety within County ROW and
Larimer County_Engineering should be routed these plans, and
should sign off on these prior to City approval.
Please call out the type and size of the storm pipe north of
Building 2.
Department: Transportation Planning Issue Contact: Tom
Reiff
Topic: General
Number: 179 Created: 6/29/2004
(6/29/04] No further comments.
Page 4
0
Number: 196 Created: 7/12/2004
[7/12/04] The truncated dome detail is nearing completion but
not yet available. If there is a timing issue, sketched
drawings are available that would need to be converted to CAD
and placed on the plan set.
Department: Stormwater Utility Issue Contact: Basil
Hamdan
Topic: Ditch company signature
Number: 150 Created: 4/27/2004
(6/30/041
[4/27/04] Ditch company should sign off on utility plans and
plat prior to submission of mylars to the City.
Topic: Erosion Control
Number: 87 Created: 3/28/2003
[6/29/04]
Third Review
June 28, 2004 .
1. The surety calculation is incorrect. Cost for silt
fencing is low, cost for revegetation for the entire acreage
is now $725 per acre for areas greater than 5 acres, $775 per
acre for areas less than 5 acres. Also, not all of the BMP's
indicated on the plan are included.
2. There must be a project schedule on the plan indicating
when various BMP's are to be installed and/or removed in
relation to the stages of construction. Don't name specific
months, use Month 1, 2, 3, etc.
3. Is the'sediment trap in the pond to be accomplished by
over -excavation or by utilization of an outlet filter ?
Please indicate on the plan.
4. The southeast bank of the New Mercer canal is not
protected by any silt fencing. This would seem to indicate
that the triangular area near Taft Hill Road will not be
disturbed by this project, although new sidewalks are.shown
here. Why is the canal not protected from these upslope
constructions. Please correct appropriately.
5. The sidewalk construction along LaPorte Ave. is outside
the area protected by the silt fencing there. What will
protect downstream areas (LaPorte Avenue) from this
construction?
Page 3
Number: 155 Created: 4/28/2004
[7/9/04] Carried over for reference.
[4/28/041 The plans will need to be modified at a later date
to reflect the installation of the water line and driveway cut
as existing referenced in the previous comment.
Number: 162 Created: 4/30/2004
[6/18/04] The plans do not indicate the driveway is to be
removed; the consultant engineer had indicated in a meeting
that the ditch company does not need this access point and
that it can be removed.
[4/30/04] The existing driveway out to Taft Hill Road should
be removed with the work done referenced in Comment #154
unless the ditch company needs this access point.
Topic: Plat
Number: 192 Created: 7/12/2004
(7/12/041 The plat language (including guarantees and the
notice of.other documents) is.outdated and actually a little
more restrictive. I'd suggest amending it to the language
attached, which can be electronically emailed if desired.
Topic: Utility Plans
Number: 178 Created: 6/18/2004
[6/18/04] The street profile sheet should show the box
culvert on the profile view of both flowlines as well as the
cross pan and sanitary sewer main that crosses the street into
the private drive.
Number: 193 Created: 7/12/2004
[7/12/041 On Sheet 11, indicate the scale for the blow-up of
the street (1"=101).
Number: 194 Created: 7/12/2004
[7/12/04] Add detail figure 11-8 in LCUASS to the box culvert
detail sheet.
Number: 195 Created: 7/12/2004
[7/12/04] Ensure the Type III barricade detail is provided. It
doesn't appear to be on the plan set.
Page 2
0
STAFF PROJECT REVIEW
City of Fort Collins
M. Torgerson Architects Date: 07/14/2004
c/o Mikal Torgerson & Troy Jones
223 North College Avenue
Fort Collins, CO.
Staff has reviewed your submittal for THE FARMSTEAD, FINAL
COMPLIANCE - (TYPE 1 - LUC) - #8-03, and we offer the
following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 197 Created: 7/14/2004
(7/14/041 Current Planning has no further comments at this
time.
I will be ready to request mylars of the Site Plan, Landscape
Plan,. Building Elevations,. and subdivision plat when
Engineering calls for utility plan mylars. At that time 1
mylar each of the Site, Landscape, & Building Elevation Plans,
and 3 mylars of the subdivision plat (at least 1 mylar must
have original signatures) will be submitted to the Current
Planning Department.
Department: Engineering Issue Contact: Marc Virata
Topic: Box Culvert Design
Number: 177 Created: 6/18/2004
[6/18/04] Prior to sign off on mylars for the project,
provide signed and stamped structural calculations by a
structural engineer on the box culvert design.
Topic: General
Number: 154 Created: 4/28/2004
[6/18/041 Carried over for reference.
(4/28/041 The developer should look at having the water line
connection as well as the new driveway approach out to Taft
Hill Road constructed in advance of the City's in -place street
work on Taft Hill in order to avoid cutting into a newly
redone street. The developer would need to fill out an
excavation permit through Engineering in order to accomplish
this. The developer will need to have City licensed concrete,
utility and asphalt contractors to do this work. Contact Rick
Richter (221-6605) in order to coordinate.