Loading...
HomeMy WebLinkAboutBANK OF COLORADO - PDP - 16-03 - CORRESPONDENCE - REVISIONSdetention / retention pond in a prescribed manner. Also, keep in mind that the gate will only be opened after a storm event as it is intended to not only detain, but also, to retain stormwater. Spillway 39. The spillway and spillway detail are included as part of this resubmittal package. Storm Sewer Profile 36. The inverts are existing — there is no plan to modify. Utility Conflicts 37. We potholed to a depth of 8' and did not find the pipe for the City of Fort Collins or North Weld. We don't see any conflicts, however, as we do not plan to do any work below 8'. The electrical lines are overhead. There will be no conflict between the proposed storm line on the North side of Lincoln Avenue and the electrical lines. Traffic Operations 1. Per Eric Bracke, this project will not be responsible for the EB and WB lanes at Vine Drive and Lemay Avenue. 31. A revised TIS ( memo form ) is part of this resubmittal. Transportation 23. This resubmittal is in accordance with 6/25/03 meeting directives. 25. Acknowledged. 26. Yes — in accordance with 6/25/03 meeting directives. Water Wastewater 27. The water main loop has been removed — See revised plans. Landscape 28. Acknowledged. Utility Plan 29. The water mains in Lincoln Avenue and Lemay Avenue have been potholed. Zoning 4. Building dimensions have been added as part of this resubmittal package. 5. Building height has been placed on the revised elevations. 6. Acknowledged. Should you have any questions regarding this matter, please call me. Thank you for your cooperation. Sincerely, DO ERSTEINN LEMBURG COMMERCIAL, INC. Daniel R. Bernth, CCIM President 9/24/2003A\DLC\DL Network\DLC TEXTILETTERS\PDP - BOC RESUBMIT LTR2.doc Traffic 18. The access on Lemay Avenue will continue to be right in / right out. The direct access from Lincoln Avenue from this property will be eliminated. The new access to Lincoln Avenue will be approximately 500 feet from Lemay Avenue. See revised TIS ( memo form) for further details. 19. Per Eric Bracke, this development will not be responsible for constructing left turn lanes on Vine Drive and Lemay Avenue. Utility Plan 12. Note added per request. 13. Acknowledged. 15. Included as part of this resubmittal. 16. Revised as requested. 17. Please review resubmittal. 20. Included as part of this resubmittal. 30. We have adjusted pedestrian ramps in accordance with direction outlined in 6/25/03 meeting with staff representatives. Light and Power — Electric 2. Acknowledged. 3. Acknowledged. Police 22. Revised as requested. Stormwater Utility 42. Detail is added. Drainage Report 41. The 2 year flows in the drainage report have been revised to reflect Q2. Text has been added to show what pipe scenario corresponds to which storm sewer. Erosion Control 35. BMPs have been added. Grading Plan 38. We are currently pursuing off -site grading easements from adjoining property owners. The pavement thickness is on the grading plan for the convenience of the asphalt contractor — we would prefer not to remove it. The legend has been added. Landscape Plan 34. The conflict between the proposed shade tree along Lemay Avenue and the proposed storm sewer has been rectified. Plat 34. The property will be platted as Bank of Colorado Subdivision. Pond Operation 40. Bank management will be responsible for operating the manual gate. Procedures will be implemented to ensure that the gate is opened and closed so that flows are exiting the 9/24/2003A\DLC\DL Network\DLC TEXTILETTERS\PDP - BOC RESUBMIT LTR2.doc 702 West Drake Road Building E, Suite B-102 Fort Collins, CO 80526 (970) 221-1965 Office (970) 221-1966 Fax September 24, 2003 Mr. Ted Shepard Chief Planner 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522-0580 RE: Bank Of Colorado — Northeast Comer of East Lincoln Avenue and Lemay Avenue Dear Ted: The following is an explanation of issues arising from the Staff Project Review letter ( See attached Staff Project Review letter dated 6/11/03 ) and how those issues have been addressed. Engineering — Katie Moore 7. Eight (8) copies of the plat map are included in this resubmittal package- 8- Acknowledged. 9. A revised layout has been provided as part of this resubmittal package. The revised layout should not require a variance. We are currently undergoing negotiations with the adjacent property owners regarding cross access easements from both East Lincoln Avenue and Lemay Avenue. 10. Included as part of resubmittal. 11. The detailed design of Lemay Avenue along the property's frontage has been incorporated as part of this resubmittal. 14. Mylars will be submitted in accordance with quality requirements at the appropriate time. 33. Acknowledged. Landscape 31. Acknowledged. 9/24/2003/\\DLC\DL Network\DLC TEXT\LETTERS\PDP - BOC RESUBMIT LTR2.doc