Number: 26 Created: 6/4/2003
Does the delineated ROW as shown account for the future intersection configuration
and cross sections for Lincoln and Lemay, such as through lanes, turn lanes, bike
lanes, and medians? Please keep in mind that the E. Mulberry Corridor Plan has
identified this section of Lincoln Ave. as a 4-Lane arterial.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 27 Created: 6/6/2003
A meeting is needed between the developer of this site and the owner of the
property to the east and north to discuss the future water and sewer requirements.
This property alone may not warrant a water main looping; however, from the
standpoint of the overall area, additional connections will likely be needed and will
be required with this project. The water main located in Lemay is a cathodically
protected water main. Include a Cathodic Isolation connection detail as well as
clearly define the connection on the overall utility plans.
Topic: Landscape
Number: 28 Created: 6/6/2003
Maintain the required landscape and utility separation distance on the landscape
plans.
Topic: Utility Plan
Number: 29 Created: 6/6/2003
A lowering of the existing 24-inch water mains is not advisable. A meeting is needed
to discuss alternative options to these lowerings. Have all the existing water mains
located in Lemay and Lincoln been potholed? Several crossings are in question as
to whether they will conflict with one another.
See site, landscape and utility plans for other comments.
Department: Zoning Issue Contact: Gary Lopez
Topic: Zoning
Number: 4 Created: 5/27/2003
Building dimensions required on footprint of site plan.
Number: 5 Created: 5/27/2003
Indicate building height on elevation.
Number: 6 Created: 5/27/2003
Show pedestrian -ramped areas with an "R"; where driveways and sidewalk
intersect. Also, stripe those areas where they cross the drives.
Page 7
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: Traffic
Number: 1 Created: 5/14/2003
1 have reviewed the TIS for the Bank of Colorado located at the intersection of
Lincoln and Lemay. Overall, the intersection of Vine and Lemay does not meet the
LOS standards found in Table 4-3 of the LCUASS. Short term operation needs to
be LOS D or better and short term overall is at LOS E. Two of the movements
EB/S13 are at LOS F in the AM and the standards require E or better. The project
will be responsible for constructing the EB and WB left turn lanes at Vine and Lemay
if other developments lag behind and fail to construct the improvements
The access off of Lincoln is proposed to be a 3/4 short term and ri/ro in the long
term. I would prefer to see it as a ri/ro access from the beginning. It is always
difficult to modifiy access locations once they are in place. Medians should be
installed on both Lemay and Lincoln.
Number: 32 Created: 6/6/2003
A revised TIS (memo form) should be submitted with new signal phasing at Vine and
Lemay to confirm the APF analyses.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 23 Created: 6/4/2003
The TIS identifies the Ped LOS for the street crossing of Lincoln to the Wal-Mart
Supercenter and the Buffalo Run apartments as LOS B. However, in order to
achieve this LOS of B the street crossing is required to have a 6' pedestrian refuge
within a raised median. The pedestrian refuge within the median is also required as
an element of the City's street standards as outlined in the LCUASS. The ped refuge
should also be incorporated within the Lemay median, according to the LCUASS.
Please include these features as part of the raised medians in subsequent
submittals.
Number: 25 Created: 6/4/2003
Parking layout and site design should not preclude future cross access to
development that may occur to the east or north of this site. Please ensure that this
remains the case in subsequent submittals. Please also bear in mind that the.
driveway providing access to E. Lincoln should be a right -in / right -out only.
Furthermore, as properties develop to the east a new shared access point to Lincoln
will be required. Cross access opportunities also apply to pedestrian facilities, such
as walkways and not be precluded by landscaping. Please work closely with the
adjacent developer / property owner on identifying the cross access locations with
this submittal.
Page 6
Topic: Plat
Number: 34 Created: 6/10/2003
Is this property being replatted ? If yes, please provide a copy of the plat as none
was received; if not, then all detention areas need to be placed within drainage
easements by separate document(s). Please also provide 20 foot utility easement
for all storm lines.
Topic: Pond Operation
Number: 40 Created: 6/10/2003
Please clarify how the manual gate will be operated after a storm. Who will be in
charge of opening and closing the gate? when would that happen in relation to a
storm event? what happens if the gate is left closed after a storm or opened during
normal operations? and who is responsible for making sure that the system
functions adequately?
Topic: Spillway
Number: 39 Created: 6/10/2003
Please provide a spillway and a spillway detail for the detention pond.
Topic: Storm Sewer Profile
Number: 36 Created: 6/10/2003
The storm sewer along Lincoln Avenue has an invert at the manhole that is higher
than invert in. Please redesign the proposed storm line, projecting the storm sewer
elevations back through the Lemay Avenue intersection such that there would be a
positive slope at the manhole and throughout the pipe profile.
Please call out the 100 year HGL on the pipe profiles
Topic: Utility Conflicts
Number: 37 Created: 6/10/2003
The proposed storm sewer crossing of Lemay Avenue may have some major utility
conflicts. Please show and call out on the pipe profiles the existing City of Fort
Collins, ELCO and North Weld Irrigation District lines. Please provide a minimum of
18 " of clearance from these lines.
Show the electric duct bank crossing of the proposed storm line at Lemay Avenue.
Will there be a conflict between the proposed storm line on the north side of Lincoln
and any proposed duct banks as the storm sewer alignment seems to coincide with
the area that Electric utilities are usually located.
There seems to be a utility conflict at the crossing of the 8" water line and the
existing storm sewer. Please pothole to check existing elevations.
Page 5 ,
Department: Stormwater Utility Issue Contact: Basil Harridan
Topic: Details
Number: 42 Created: 6/10/2003
Please provide a detail for the manually operated headgate at the retention pond
outlet into the ditch.
Topic: Drainage Report
Number: 41 Created: 6/10/2003
Please call out the 2 year flows in the drainage report rational method calculations
as Q2, not Q10 as currently shown.
Explain in the text of the report and provide a schematic of what pipe scenario
corresponds to which to which storm sewer.
Please specify how the pipe crossing of Lemay Avenue was designed. Provide 100
year master plan flows in the Lincoln channel upstream of Lemay. If the proposed
improvements are the ultimate improvements for Lemay Avenue then pipe should be
designed to carry 100 year master plan flows with no overtopping allowed since
Lemay Avenue is an arterial street.
Topic: Erosion Control
Number: 35 Created: 6/10/2003
June 3, 2003
The plan doesn't show the BMPs, it would probably help if they were there.
Topic: Grading Plan
Number: 38 Created: 6/10/2003
There seems to be grading to the north and east of the property line. Any such
grading would require an off -site grading easement from the property owner.
Why is the pavement thickness on the grading plan ? Please remove.
Please provide a legend.
Topic: Landscape Plan
Number: 43 Created: 6/10/2003
There seems to be a conflict between one of the proposed shade tree along Lemay
Avenue and the proposed storm sewer. Please rectify.
Page 4
hearing. For easements to be dedicated to the City (utility easements), the
completed legal descriptions and dedication paperwork must be submitted to the
City prior to mylar approval. For private easements (grading easement with
neighbor) a copy of the completed easement will need to be submitted to the city
prior to mylar approval.
Number: 15 Created: 6/2/2003
Please submit a completed Utility Plan Checklist (LCUASS) with the next submittal.
Number: 16 Created: 6/2/2003
Both driveway cuts should be the radius -style, not flared, cuts with the standard
radius because both Lincoln and Lemay are arterials.
Number: 17 Created: 6/2/2003
Because so much of the street design shown needs to be substantially changed for
the next submittal, these designs were not given a detailed review; please expect
new comments with the next submittal.
Number: 20 Created: 6/2/2003
Please provide all information on street cross -sections as required under LCUASS.
Number: 30 Created: 6/6/2003
Pedestrian ramps should be the same width as the sidewalks leading into them, in
this case 6 feet wide on Lincoln and Lemay.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric
Number: 2 Created: 5/15/2003
Nearest existing power is at the N. side of Lincoln Ave., approximately 120 ft. east of
this site. Developer will be required to provide an off -site easement from this point to
the corner of the bank site along the north side of Lincoln. Contact Light & Power
Engineering (224-6152) for assistance.
Number: 3 Created: 5/15/2003
Developer will need to coordinate power requriements and a transformer location
With Light & Power Engineering (224-6152).
Department: Police Topic: General m Issue Contact: Joseph Gerdo
Number: 22 Created: 6/3/2003
Lighting: It appears that the photometrics do NOT include additional lighting values
in the drive up stalls. Assuming that these values will be over 1.0 BUT NOT OVER
4.0 Values in Parking lot (over 5.0fc) are excessive.
Page 3
possible future alignment of Lincoln, to be designed by others, and remove the
vertical design as well.
Number: 11 Created: 6/2/2003
There are approved designs of Lemay avenue stretching from south of this site north
to Vine (in the Mulberry/Lemay Crossings, C3-1814, and Buffalo Run plans, C3-
1724). These plans may be used and referenced by this project, or, if this project
wishes to redesign Lemay, then both ends of the new portion need to tie into the
approved design(s) (station equations, vertical matches). Detailed design of Lemay
along the property's frontage is needed.
Number: 14 Created: 6/2/2003
Please see the Larimer County Urban Area Street Standards Appendix E-6 Criteria
for Scanable Quality Mylars, for quality requirements for all plan sheets (site,
landscape, utility, plat, etc.).
Number: 33 Created: 6/6/2003
Please see redlines for any additional comments.
Topic: Landscape
Number: 31 Created: 6/6/2003
Special consideration should be given to the landscaping just south of the Lemay
access point because of the conflicting vehicle movements (The vehicles exiting the
drive -through vs. vehicles entering from Lemay).
Topic: Traffic
Number: 18 Created: 6/2/2003
Please revise the TIS to reflect the access points as right-in/right-out, and the
access on Lincoln going away in the future.
Number: 19 Created: 6/2/2003
Please note that, while there are plans currently being approved for the addition of
left turn lanes on Vine at Lemay, if those lanes are not constructed by the time this
development wishes to move forward, then this development will need to construct
those lanes.
Topic: Utility Plan
Number: 12 Created: 6/2/2003
Please show the approximate limits of street cuts and add the note: Limits of street
cut are approximate. Final limits are to be determined in the field by the City
Engineering Inspector. All repairs are to be in accordance with City street repair
standards.
Number: 13 Created: 6/2/2003
It appears that offsite grading and utility easements will be needed. Letters of intent
for these easements from the affected property owner(s) will be required prior to
Page 2
STAFF PROJECT REVIEW
Citvof Fort Collins
DOBERSTEIN & LEMBURG Date: 6/11/2003
DAN BERNTH
702 W. DRAKE RD. #B102
FT. COLLINS, CO 80526
Staff has reviewed your submittal for BANK OF COLORADO PDP - TYPE I (LUC)
#16-03, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Katie Moore
Topic: General
Number: 7 Created: 5/30/2003
Please provide a plat of the property with ROW and easements dedicated as
necessary, since the property is not currently platted. Both Lincoln and Lemay are
4-lane arterials on the Master Street Plan, with a total of 11 5'of ROW. Utility
easements 15' wide are required behind the ROW on both streets as well. ROW
dedicated for Lemay should be located to provide for the ultimate alignment of
Lemay as it swings east for the future overpass at Vine.
Number: 8 Created: 5/30/2003
Regarding the ultimate design of Lincoln, the transition of Lincoln from 4-lane to 2-
lane needs to occur at the next intersection east of Lemay. Studies have shown that
the Lincoln/Lemay intersection needs to be 4 lanes on all sides to provide for the
needed capacity.
Number: 9 Created: 5/30/2003
The access points shown do not meet the minimum separation distance from an
intersection as required by the Larimer County Urban Area Street Standards.
Please submit a variance request according to LCUASS 1.9.4. It is the City's
intention to support the variance, but not without conditions. Adding to comment #1
from Traffic Operations, the medians required to restrict access to ri/ro for both the
access on Lincoln and the one on Lemay should be standard medians in the center
of the street. "Pork chop" islands in the driveways would be insufficient. Also,
please note that the access location on Lincoln is approved on an interim basis only,
and should be noted that it will be removed in the future. When the property to the
east develops, a shared access needs. to be provided with a greater separation from
Lemay than is shown with the current access. It is suggested to work with the
adjacent property owner(s) regarding cross access from this parcel to both the north
and the east.
Number: 10 Created: 6/2/2003
Please provide the full design (detailed, not preliminary) of Lincoln along the
property's frontage,. including the full lengths of the turn lanes that stretch east of the
property. Beyond this, to the east, please show the horizontal alignment as a
Page 1