HomeMy WebLinkAboutBANK OF COLORADO - PDP - 16-03 - CORRESPONDENCE - (3)fit
VELDMAN MORGAN
C O hi M E R C 1 A 1,
NEC OF LINCOLN AVENUE AND LEMAY AVENUE
BANK OF COLORADO I OFFICE I RETAIL BUILDING
Applicant
—
Location
Current Use
Dan Bernth
Bank of Colorado
NEC of Lincoln Ave. and Lemay Ave.
Vacant Ground, approximately
IIA13 Acres
61,569 Square Feet
Inbaded Use
Drive - Thru Bank
—
OfAee
--._ - ----
Retall
Building Size - - -_
6,000+ I - Square Feet
To Be Determined --
__ -_ -
Construction Material -
. __. _
Zoning- -- __ ----
- I - Industrial -
----
Projected Rsvk-rw _
Type 1 -
—
Landscaping
in accordance with 3.2.1
1
Wmi are drainage issues tor- the site? - -- ---- -
2
Now do we overcome drainage Issues for this site?
3
_ - --- . eft_...
V�II Lemay Avenue Realignment Impact this sit-e?— If so, how?----
----
4
Will Mulberry Corridor Plan Impact thhz sib? H so, how?
---
5 How is ws s-6-Impacted bjAde uab Public Fac Imes CAPf hzsun?
07/28/2002/SS/DAN/BANK OF COLORADO - LL
760 Whalers Way, Bldg. C, Suite 200 Fort Collins, CO 80525 Phone 970/223-5555 fax 970/223.1647
street. The developer would be eligible for repays for any improvement above and
beyond the local street standard. Improvements along Lincoln should be designed to
match and tie into the improvements that were done for Buffalo Run Apartments. Please
note that the Street Oversizing Fund does not reimburse for short term interim
improvements. If interim improvements are deemed not be necessary, then cash in lieu
for ultimate improvements may be needed instead.
18. Utility Plans will be needed at the time of submittal. A Development Agreement will be
required prior to recording final documents. A Development Construction Permit will be
required prior to beginning site work. For further information, please contact Sheri
Wamhoff, 221-6605.
19. For the larger surrounding context, please be aware that two existing local streets, Duff
and Webster, will need to be extended from the east to serve the 14 acre vacant area to
the north of the subject site. For further information regarding Transportation Planning
issues, please feel free to call Tom Reiff, 221-6608.
20. Please be aware of the pending East Mulberry Corridor Plan. There are long range plans
to re -align Lincoln and to extend Buckingham to the east. There is also some discussion
of down -zoning the property to L-M-N. The contact person is Pete Wray, 221-6376.
21. The Department of Natural Resources will require an Ecological Characterization Study.
This study should establish the boundaries of the wetlands and identify the existing trees.
In addition, the study should address the Limits of Development and establish the buffer
areas as called for in the Land Use Code. Native plants and grasses should be used in the
buffer zones.
22. The City Forester should be consulted to evaluate the existing trees. If any trees are
found to be significant, then they should be preserved. Where trees cannot be preserved
they must be mitigated according to the Land Use Code. For further information, please
contact Tim Buchanan, 221-6361.
23. The construction phase will require a Fugitive Dust Permit from the Larimer County
Health Department. Also, trash enclosures should be sized to accommodate various
containers for recycling. A single trash hauler should be used. For further information
on natural resource issues, please contact Doug Moore, 221-6750.
24. For an estimate of the Capital Improvement Expansion Fee, payable at the time of
building permit, please contact the Building Inspection Division, 221-6760. This fee is
adjusted annually.
5
Fire Lane" signs. Addresses must be visible from the public street system. For further
information, please contact Ron Gonzales, 221-6570.
9. The Street Oversizing Fee will be $11.03 per square foot for a bank with drive -through
facilities. The fee for the retail building is $6.24 per square foot and payable at the time
of building permit issuance. Keep in mind fees are adjusted annually. In addition, the
City collects the Larimer County Road Fee.
10. A Transportation Impact Study will be required which will address all modes. Check
with Eric Bracke, 221-6630, to determine the scope of the study. Keep in mind that the
intersection of North Lemay and East Vine is approaching capacity and there are issues
with complying with the Adequate Public Facilities standard. Even though the long
range plan is to re -align Lemay to the east, interim improvements to this intersection may
be needed in the short range. If it is determined that there is no available capacity at this
intersection, the applicant can participate in improvements or wait until the improvements
are completed by others.
11. The City is considering placing a funding source question before the voters this
November for transportation improvements. If passed, the Lemay/Vine intersection
would become eligible for improvements.
12. The developer is responsible for the repair of any damaged sidewalk, curb and gutter
along the public streets that front the project.
13. Lincoln has new section of pavement as a result of Buffalo Run Apartments. Please be
aware that any street cuts along Lincoln are subject to street cut fees based on the
condition of the asphalt. For further information, please contact Rick Richter, 221-6605.
14. Please be cautioned that any construction activity off -site will require an easement from
the property owner.
15. Additional right-of-way and easement may be needed along both Lincoln and Lemay. In
the case of Lemay, the right-of-way amount will be based on short term conditions. In
the long term, right-of-way for the Lemay Bypass will be required if the property has any
frontage along the future bypass. Such dedication may include additional land for slope
easements.
16. Local streets should intersect with the two abutting arterials every 660 feet. Exceptions
may be necessary for the future re -aligned Lemay Bypass. A variance would be
processed by the Engineering Department. It is likely that the driveway cut on Lemay
will be restricted to right-in/right-out turning movements. The offset in driveway cuts on
both sides of Lemay may not be allowed unless protected from left turns by a raised
median.
17. If the developer chooses to move forward ahead of the Lemay Bypass project, then the
improvements along Lemay would consist of sidewalk, curb, gutter, and one-half the
10
available power to serve the site. The number and location of the transformers must be
coordinated with Light and Power. Transformers must be both accessible (within ten feet)
to hard surface for emergency change -out and screened for aesthetic purposes, if visible
from a public street. Meters should be screened as well. Any modification to the existing
system would be at the developer's expense. A Commercial One ("C-1") Form must be
completed by a licensed electrical contractor. Please refer to the hand-out describing the
development fees and charges. Street trees in the parkway strip must be kept 40 feet
from streetlights. Ornamental trees must be kept 15 feet from streetlights. For further
information, please contact Rob Irish, 221-6700.
,4. This site is in the Dry Creek drainage basin where the new development fees are
$5,000/acre which is subject to the runoff coefficient reduction. The standard drainage
and erosion control reports and construction plans are required and they must be prepared
by a professional engineer registered in Colorado. The primary issue is the site drains
into the ditch along Lincoln which is presently undersized and frequently floods
properties to the east in the County. Rex Burns with the County has stated that no
increase in runoff is allowed in the Lincoln Street ditch. One alternative that has been
discussed is temporary retention with a release into the ditch after the ditch drains down.
Another issue is a pipe along Lemay that is a 10" PVC pipe which needs to be up sized to
at least the size installed by the Wal-Mart project. The site is on Stormwater inventory
map #10G. A copy can be obtained from the Utility Service Center at 700 Wood Street.
There is an offsite flow from the west that overtops Lemay and flows along the south side
of this site which needs to be accommodated.
5. There is an existing 24-inch water in Lemay and an 8-inch water main in Lincoln. There
is an existing 15-inch sanitary sewer approximately 200 feet E of Lemay in N/S
alignment. The developer must provide a 30-foot easement for the existing N/S
sewer. Extend water main from the 8-inch main in Lincoln to loop to the 24-inch main in
Lemay. Any water or sewer main brought to the property must be extended to the limits
of the property to serve future adjacent development. The water conservation standards
for landscape and irrigation will apply to the project. Development fees, water rights and
a repay for the 24-inch water main will be due at time of building permit. The Water and
Sewer Department of Fort Collins Utilities has implemented a plan check fee. For further
information, please contact Roger Buffington, 221-6681.
6. Please note that Elco also has mains in Lincoln and Lemay that may have to be crossed.
There may be an existing Elco service line that would have to be abandoned. For further
information regarding Elco facilities, please contact Webb Jones, 493-2044.
7. The site will be served by the Poudre Fire Authority. They will require that a fire hydrant
be within 300 feet of all buildings capable of delivering a minimum of 1,500 gallons per
minute at 20 p.s.i. Addresses must be visible from public streets.
8. Access roads to buildings must feature no less than 25-feet inside and 50-feet outside
turning radii. Designated fire lanes must feature curbs painted red and "No Parking —
3
ITEM: Bank of Colorado - Northeast Corner of East Lincoln and Lemay
MEETING DATE: July 29, 2002
APPLICANT: Bank of Colorado c/o Mr. Dan Bernth, Veldman-Morgan, 760
Whalers Way, Building C, Suite 200, Fort Collins, CO. 80525.
LAND USE DATA: Request for 6,000 square foot commercial building featuring a 3,500
square foot bank, with accessory drive-thru facilities, and 2,500 square feet of retail on 1.413
acres at the northeast corner of East Lincoln and Lemay within the old East Lincoln O.D.P.
COMMENTS:
The site is zoned I, Industrial which permits financial services as a permitted use subject
to Administrative (Type One) Review. The retail portion, however, is not permitted in
the Industrial zone unless it meets the definition of a "convenience shopping center."
This definition is as follows:
Convenience shopping center shall mean a shopping and service center situated on seven (7) or
fewer acres with four (4) or more business establishments with separate exterior entrances,
located in a complex which is planned, developed and managed as a single unit, and located
within and intended to primarily serve the consumer demands of adjacent employment areas. The
principal uses permitted include retail stores; business services; convenience retail stores with
fuel sales (possibly including an accessory one -bay automatic carwash but not a multi -bay self -
serve carwash); personal business and service shops; standard or fast food restaurants (without
drive -up windows); liquor sales (for on- or off -premise consumption); beauty or barber shops;
dry-cleaning outlets; equipment rental (not including outdoor storage); limited indoor
recreational uses; pet shops; and uses of similar character. Secondary uses may include
professional offices; limited banking services such as branch banks (with limited drive -up
facilities) and automated teller machines; multi -family dwellings; medical offices and clinics;
small animal veterinary clinics; child care centers; and elderly day-care facilities.
2. The bank is limited to a maximum of 3.5 spaces per 1,000 square feet of gross floor area.
The retail, if allowed, would be limited to a maximum of 3.0 spaces per 1,000 square
feet. The build -to line along both arterials is between ten and 25 feet.
3. The source of electrical power is along both Lincoln and Lemay. Electrical conduit is
stubbed to the property as part of the intersection widening project. There is sufficient
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 321 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
CURRENT PLANNING DEPARTMENT
Commui Planning and Environmental'. fices
Current Planning
City of Fort Collins
August 1, 2002
Mr. Dan Bernth
Veldman Morgan Commercial Real Estate
760 Whalers Way
Building C, Suite 200
Fort Collins, CO 80525
Dear Dan:
For your information, attached is a copy of the Staff's comments for the Bank of Colorado and
Retail Space at the Northeast Corner of East Lincoln and Lemay Avenue which was
presented before the Conceptual Review Team on July 29, 2002.
The comments are offered by staff to assist you in preparing the detailed components of the
project application. Modifications and additions to these comments may be made at the time of
formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to call me at 970-221-6750.
Sincerely,
TIC
Ted Shepard
Chief Planner
cc: Project Planner
File
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020