Loading...
HomeMy WebLinkAboutBANK OF COLORADO - PDP - 16-03 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETPik A RAI& OP Cdod C ,,%o 6 Project: /�- d3 l �.,icae-pi t "ihAY Date: r006. 0&0"3 Planner: ��O S• Traffic Operations: E� 'B Engineer: KA r,E ems Requested e ine ems eing e urne v U) a ;� .S 0 Other Items Required LO 7 y .� 0 Other Items being Returned Engineering X I k x� Stormwater X jG Water/Wastewater/FEL,WD Traffic Operations X X Trans ortation Planning X Transfort Engineering Pvmt. Light & Power Technical Services PFA TOTALS 5 y L Other: Note: All redlined items should be returned with the resubmittal/revisions. REVISION ROUTING SHEET tZ ITEM: NIL OF CoozoR/ioo DATE RECEIVED: f Gti a Z V Q [zs•. FILE: PROJECT PLANNER ZONING X BUILDING INSPECTION FORESTRY POLICE - JOE GERDOM ADVANCE PLANNING STREETS R.O.W. PLANNING WATER CONSERVATION POST OFFICE W EST XCELENERGY SCHOOLS: POUDRE / THOMPSON AT & T DIGITAL CABLE CDOT DITCH COMPANY RAILROAD: UP or BNSF REA/DOE/PRPA NATURAL RESOURCES PARK PLANNING S o y 3 1 TOTAL 7 B 1 7 3 1