HomeMy WebLinkAboutKAUFMAN BARN, ADDING A STRUCTURE TO A PROPERTY WITH A NON-CONFORMING USE - 18-03 - CORRESPONDENCE - (3)No Comments
Department: Stormwater Utility
Topic: Storm Water
Number: 4
No Comment
Department: Traffic Operations
Topic: Traffic Operations
Number: 2
No concerns or issues. Traffic Study is waived.
Department: Transfort
Topic: General
Number: 8
No comment
Issue Contact: Wes Lamarque
Created: 5/29/2003
Issue Contact: Eric Bracke
Created: 5/20/2003
Issue Contact: Garold Smith
Created: 6/3/2003
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 10 Created: 6/4/2003
Please dedicate half of the appropriate right-of-way (ROW) along Horsetooth for a 4-Lane Aterial. This
amount totals 57.5 feet.
Department: Technical Services Issue Contact: Jim Hoff
Topic: Plat
Number: 12 Created: 6/13/2003
Boundary closes, legal closes after "bearing typo" is corrected.
- Number:13 Created: 6/13/2003
Existing improvements should not be shown on the subdivision plat.
Number: 14 Created: 6/13/2003
Are easements needed on this parcel?
Department: Water Wastewater
Topic: General
Number: 15
No comments.
Department: Zoning
Topic: ZONING
Number: 3
Neither set of plans show which barn is being replaced
Issue Contact: Jeff Hill
Created: 6/13/2003
Issue Contact: Jenny Nuckols
Created: 5/22/2003
Be sure and return all of your redlined plans when you re -submit. If you have any questions
regarding these issues or any other issues related to this project, please feel free to call me
at (970) 221-6750.
Ypurs Truly, I TE O%/ PR oti i S ` OCT. G
1\
Troy Tannr
City P
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
ELIZABETH KAUFMAN Date: 06/13/2003
2204 W. PROSPECT RD.
FT. COLLINS, CO 80526
Staff has reviewed your submittal for KAUFMAN SUBDIVISION - TYPE II (LUC) #18-03,
and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Troy Jones
Topic: General
Number: 17 Created: 6/13/2003
Ted Shepard is the project planner on this project. He has been on vacation for the past 2 weeks, so I'm
forwarding you these comments. I looked over the plans, and don't see any problems from a Current
Planning Department perspective. Once Ted Shepard returns on June 16, 2003, please coordinate directly
with him regarding any additional comments he may have, and to coordinate a hearing date.
Department: Engineering Issue Contact: Dave Stringer
Topic: General
Number: 7 Created: 5/30/2003
Will enter into Development Agreement with owner. City will not require any street improvements at this time.
D.A. will obligate property for cost of improvements for future roadway improvements.
Topic: Plat
Number: 5
Need to remove all structures from plat.
Created: 5/30/2003
Number: 6 Created: 5/30/2003
Need to dedicate a total of 57. 5 feet as measured from section line. If existing 40 foot right-of-way is correct
then need to dedicate 17.5 feet additional
Also, need to dedicate 15 foot utility easement behind right-of-way
Department: Excel Energy
Topic: General
Number: 16
No comments.
Issue Contact: Len Hilderbrand
Created: 6/13/2003
Department: Light & Power Issue Contact: Doug Martine
Topic: Light & Power .
Number: 1 Created: 5/16/2003
Applicant will need to contact Light & Power Engineering (221-6700) if any changes to the existing electric
service are required.
Department: Natural Resources
Topic: Transportation
Number: 11
No Issues.
Department: Police
Topic: General
Number: 9
Issue Contact: Doug Moore
Created: 6/5/2003
Issue Contact: Joseph Gerdom
Created: 6/3/2003
Page 1