Loading...
HomeMy WebLinkAboutKAUFMAN BARN, ADDING A STRUCTURE TO A PROPERTY WITH A NON-CONFORMING USE - 18-03 - CORRESPONDENCE - (3)No Comments Department: Stormwater Utility Topic: Storm Water Number: 4 No Comment Department: Traffic Operations Topic: Traffic Operations Number: 2 No concerns or issues. Traffic Study is waived. Department: Transfort Topic: General Number: 8 No comment Issue Contact: Wes Lamarque Created: 5/29/2003 Issue Contact: Eric Bracke Created: 5/20/2003 Issue Contact: Garold Smith Created: 6/3/2003 Department: Transportation Planning Issue Contact: Tom Reiff Topic: Transportation Number: 10 Created: 6/4/2003 Please dedicate half of the appropriate right-of-way (ROW) along Horsetooth for a 4-Lane Aterial. This amount totals 57.5 feet. Department: Technical Services Issue Contact: Jim Hoff Topic: Plat Number: 12 Created: 6/13/2003 Boundary closes, legal closes after "bearing typo" is corrected. - Number:13 Created: 6/13/2003 Existing improvements should not be shown on the subdivision plat. Number: 14 Created: 6/13/2003 Are easements needed on this parcel? Department: Water Wastewater Topic: General Number: 15 No comments. Department: Zoning Topic: ZONING Number: 3 Neither set of plans show which barn is being replaced Issue Contact: Jeff Hill Created: 6/13/2003 Issue Contact: Jenny Nuckols Created: 5/22/2003 Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Ypurs Truly, I TE O%/ PR oti i S ` OCT. G 1\ Troy Tannr City P Page 2 STAFF PROJECT REVIEW City of Fort Collins ELIZABETH KAUFMAN Date: 06/13/2003 2204 W. PROSPECT RD. FT. COLLINS, CO 80526 Staff has reviewed your submittal for KAUFMAN SUBDIVISION - TYPE II (LUC) #18-03, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Troy Jones Topic: General Number: 17 Created: 6/13/2003 Ted Shepard is the project planner on this project. He has been on vacation for the past 2 weeks, so I'm forwarding you these comments. I looked over the plans, and don't see any problems from a Current Planning Department perspective. Once Ted Shepard returns on June 16, 2003, please coordinate directly with him regarding any additional comments he may have, and to coordinate a hearing date. Department: Engineering Issue Contact: Dave Stringer Topic: General Number: 7 Created: 5/30/2003 Will enter into Development Agreement with owner. City will not require any street improvements at this time. D.A. will obligate property for cost of improvements for future roadway improvements. Topic: Plat Number: 5 Need to remove all structures from plat. Created: 5/30/2003 Number: 6 Created: 5/30/2003 Need to dedicate a total of 57. 5 feet as measured from section line. If existing 40 foot right-of-way is correct then need to dedicate 17.5 feet additional Also, need to dedicate 15 foot utility easement behind right-of-way Department: Excel Energy Topic: General Number: 16 No comments. Issue Contact: Len Hilderbrand Created: 6/13/2003 Department: Light & Power Issue Contact: Doug Martine Topic: Light & Power . Number: 1 Created: 5/16/2003 Applicant will need to contact Light & Power Engineering (221-6700) if any changes to the existing electric service are required. Department: Natural Resources Topic: Transportation Number: 11 No Issues. Department: Police Topic: General Number: 9 Issue Contact: Doug Moore Created: 6/5/2003 Issue Contact: Joseph Gerdom Created: 6/3/2003 Page 1