HomeMy WebLinkAbout637 COWAN STREET - FDP - 21-03A - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETtii C
Project: �� �� �i�L �l-n ,�f Date:
Planner: el% Traffic Operations: Engineer:
ems Requested
RedFined items Being Returned
o
v
`��° Y
�
Other Items Required
a;
U)
—J
°
v
� L
p
Other Items being
Returned
Engineering
/l K
Stormwater
Water/Wastewater/FCLWD
Traffic Operations
Transportation Planning
Tra n sfort
Engineering Pvmt.
Light & Power
Technical Services
PFA
TOTALS
/
Other:
Note: All redlined items should be returned with the resubmittal/revisions.
Please cal/ 221-6750 to schedule a resubmittal
appointment,
REVISION ROUTING SHEET - J26ot A 3
..
m�����������
.�I!l1la�
�I
V. l