Loading...
HomeMy WebLinkAbout637 COWAN STREET - PDP - 21-03 - CORRESPONDENCE - REVISIONS1 Item #68 Response: Printing error. The drainage report has been updated and resubmitted in full. Silt fence and a temporary sediment basin will prevent sediment from leaving the site. Full details are located int the drainage report. Item #34 Response: The curb stop has been moved as requested and a variance is being requested for the driveway cut-out in the Right -Of -Way. 000000IVIL ENGINE RESPONSES TO COMMENTS To: Katie Moore Civil Engineer, Development Review City of Fort Collins PO Box 580 Fort Collins, CO 80522-0580 From: Jade P. Miller, P.E. DMW Civil Engineers, Inc. Date: November 5, 2003 Project: 637 Cowan Street Fort Collins, Colorado Project No. COW: 0301.00 143S WEST 29T" STREET LOVELAND, CO B053B (970) 461-2661 FAX (970) 461-266S WWW. DMWCIVILENSINEERE.COM The following is in response to engineering related comments made by the City regarding to the aforementioned project dated October 10, 2003. Item # 64 Response: The barricade detail has been updated as requested. Item #72 Response: A variance is being requested for the driveway cut-out in the Right -Of - Way Item #73 Response: The drainage easement was shown on the utility plan. Easement documents are being submitted with this submittal. Item #39 Response: The drainage easement was shown on the plans. Easement documents are being submitted with this submittal. Item #67 Response: Printing error. The drainage report has been updated and resubmitted in full.