HomeMy WebLinkAbout637 COWAN STREET - PDP - 21-03 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProje(t; bV e0tyar) 3 -W 21 -1�3
Planner: TynW Joni 1raMc Operations:
Engineer: I—. x ,4"f-ffly-e�
Date: L4b3
s' Itemt Requested �o ^
e land Plat Utili R t Drainage _ref . �"
g
��w
`�``�Ny
- �, �.�
Redlined Items Bring Returned
Site land Plat Utility Drainage R t Other Items Being Returned
Engineering
Stormwater
Eramic Operations
bans. Planning
irans(ort
Natural Rmourm
_
_
—
Park Planning
Other:
Note: All redlined items should be returned with the retubmittal/ revisions.
- I %
Revisions Routin
Item:
[2'1—I)-1;7 )�
—clL-1
' i
Date:
a
.,
FILE: PROJECT PLANNER
)(
ENGIINEERD G: PAVEMENT
ZON' iG
BUILDING INSPECTION
LIGHT & POWER
MAPPING / DRAFTL*iG
FORESTRY
FCLWD/ELCO,BOXELDER
FIRE
POLICE
ADVANCE PLA,\'NING
STREETS
OWPIA 1NING
RMComTA.Ny
ONSERVATION 'ICEERVICE:
POUDRE ! THOMPSON.GHtiyAY
DEPARTME`7TMPANY
RAILROAD: UP or BIN/CS
REA/DOE/PRPA
x
`21-1- Li I l--FT)
mmmm ME
wommomm
g Sheet