HomeMy WebLinkAboutPROSPECT/1-25 ODP - 20-03 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESThank you for your consideration and we look forward to working with you during
the development review process.
Sincerely,
VF Ripley Associates
Cathy Mathis
Plant material with a low to moderate water requirements
Limited turf areas
Effective use of soil amendments
An efficient irrigation system
Appropriate maintenance
PRINCIPLE RD — 3: Urban Estate Development may be included in some
residential districts for several purposes ... 3) to provide, in some cases, a
physical transition between urban development and rural or open lands.
Policy RD —1.2 Mix of Housing Types and Lot Sizes.
The overall density of the Urban Estate parcel will be 2 units/acre and the
location of the estate lots will provide a transition to the county subdivisions to the
east.
1-25 Subarea Plan Visions and Goals achieved by the proposed plan
include:
Land Use - Prospect/1-25 ODP is consistent with the land uses proposed in the I-
25 Subarea Plan.
Transportation The transportation system for the ODP will provide a north -
south collector link; Prospect Road will be improved to 4-lanes; bike and transit
can be accommodated either within the development or nearby.
Community Image and Design — The ODP will comply with the Prospect Road
Streetscape program and the Development Standards for the 1-25 Subarea Plan
Economy — The northeast corner if prospect and 1-25 is designated as a mixed
use activity center, which will provide financially viable opportunities.
Housing — The Urban Estate land complies with the vision of providing a
transition area between urban and rural developments.
Environment — Natural features, such as Boxelder Creek and the irrigation
ditches will be buffered from development.
Growth Management — Adequate public facilities are available to the site.
4
transportation corridors, with feeder transit lines connecting all major
district destinations, consistent with the adopted Transit Development Plan
(1996).
PRINCIPLE T-5: The City will acknowledge pedestrian travel as a viable
transportation mode and elevate it in importance to be in balance with all
other modes. Direct pedestrian connections will be provided and
encouraged from place of residence to transit, schools, activity centers,
work and public facilities.
Major pedestrian and bicycle routes will be incorporated within the Overall
Development Plan, linking residential to businesses, employment and the
proposed high school. The proposed plan has a multitude of opportunities for
mass -transit, bicycle, and pedestrian travel. The collector street network will
have on -street bike lanes, Prospect Road is slated to become. a four -lane arterial,
the Spring Creek Bike Trail runs through the project, and County Road 5, which
is planned for a feeder transit route.
PRINCIPLE CAD-1: Each addition to the street system will be designed with
consideration to the visual character -and experience of citizens who will
use the street system and adjacent property. Together, the layout of the
street network and streets themselves will contribute to the character, form
and scale of the city.
Policy CAD —1.2 Street Layout.
Policy CAD-1.3 Streetscape Design.
The proposed collector street will provide direct access between Carriage
Parkway, Prospect Road, and the frontage road.
PRINCIPLE ECON-1: The City will pursue a balanced and sustainable
economic development program.
Policy ECON-1.1 Balance of Employment Opportunities
Policy ECON-1.2 Economic Development Policy
Prospect/1-25 ODP will foster economic development and opportunities by
providing a commercial lifestyle center as well as industrial and employment
uses.
Policy ENV-3.3 Water Demand Management Policy.
The landscape plan for the project will utilize the following xeriscape principles:
3
A proposed collector street connects to. Carriage Parkway to the north and ties
into Prospect Road and a future signalized intersection. Local street connections
are provided at 660 foot intervals. On -street bicycle routes will be provided to
encourage alternative modes of travel.
Any existing wetland or special wildlife habitats on the property will be identified
at the Project Development Plan (PDP) stage. The ODP indicates wildlife buffer
zones per the LUC for both irrigation ditches and Boxelder Creek.
Utility infrastructure adequate to serve the proposed land uses is available in
close proximity to the site. An existing 20" sewer line serves the northern two-
thirds of the property. The entire property is served by an existing ELCO 8"
water line. An approved Boxelder Sanitation District 20" sewer line will serve the
southern one-third of the project.
City Plan Principles and Policies achieved by the proposed plan include:
PRINCIPLE LU-1: Growth within the city will promote a compact
development pattern within a well-defined boundary.
Policy LU-1.1 — Compact Urban Form.
The Prospect/1-25 ODP is contained within a contiguous boundary, encouraging
potential future growth to be pedestrian and transit -oriented.
PRINCIPLE T-1: The physical organization of the city will be supported by a
framework of transportation alternatives that maximizes access and
mobility throughout the city, while reducing dependence upon the private
automobile.
Policy T-1.1 Land Use Patterns. The City will implement land use patterns,
parking policies, and demand management plans that support effective
transit, an efficient roadway system, and alternative transportation modes.
Appropriate residential densities and non-residential land uses should be
within walking distance of transit stops, permitting public transit to become
a viable alternative to the automobile.
Policy T-1.2 Multi -Modal Streets. Street corridors will provide for safe and
convenient use of all modes of travel, including motor vehicles, transit,
bicycles, and pedestrians.
PRINCIPLE T-2: Mass transit will be an integral part of the .city's overall
transportation system.
Policy T-2.1Transit System. The City's public transit system will be .
expanded to provide integrated, high frequency transit service along major
2
6
June 17, 2003
Planning and Zoning Board Members
Mr. Cameron Gloss
Fort Collins Planning Department
281 North College Avenue
Fort Collins, CO 80524
RE: Planning Objectives for Prospect / I - 25 Overall Development Plan
Dear Cameron:
The Prospect / I — 25 Overall Development Plan (ODP) is a 135.5 - acre property
located at the northeast comer of Interstate 25 and Prospect Road.
Undeveloped property owned by Imago Enterprises is adjacent to the property on
the north.. Interchange Business Park, Waterdale and Clydesdale residential
developments are located further to the north and northeast. Kitchell Subdivision
and the undeveloped Poudre High School Site are to the east; and existing
commercial and Homestead Estates Subdivision are situated south of the site.
Boxelder Creek is flows under the Interstate Highway just north of the property.
The Cache La Poudre Reservoir Inlet and the Apparent Lake Canal Company
irrigation ditches traverse the site in a northwest to southeast direction.
The land is zoned C — Commercial District, I -Industrial District and UE — Urban
Estate District. Proposed land uses for each parcel of land in the ODP are the
same as the permitted land uses in the applicable Zoning Districts, which ever
applies. The zoning, land uses, and proposed street networks are consistent with
the 1-25 Sub -Area Plan and the adopted 1-25 Regional Plan.
Land adjacent to the intersection of 1-25 and Prospect Road is zoned
Commercial. The site is identified on the 1-25 Subarea Plan as a mixed -use
activity center. The Plan calls for a 350,000 sq. ft. commercial lifestyle center at
this location to serve the City's objective of providing a mix of employment
opportunities. Approximately 1,600,000 sq. ft. of Industrial uses are projected on
84 acres north of the proposed activity center. The area zoned Urban Estate will
contain approximately 40 lots at a maximum of 2 units per acre.
1