HomeMy WebLinkAboutGAMBLE SUBDIVISION REPLAT - 15-03 - CORRESPONDENCE -Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 25 Created: 6/9/2003
Please add a F.F. elevation for the new building on the grading plan.
Number: 26 Created: 6/9/2003
Is there any proposed grading that differs from existing grading?
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 22 Created: 6/3/2003
Provide a copy of the proposed replat reflecting the 9 foot utility easement shown on the utility plans along
the east side of the property.
Number: 23 Created: 6/3/2003
Place the proposed curb stop 1-foot from the rear of the utility easement and the meter pit more than 2-feet
beyond that.
See utility plans for other comments.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel freeb call me at (970) 221-6750.
Y urs Tru y,
II r
�,
Troy Jon�s
City Plany�er
Page 2
Citvof turf Collins
STEWART & ASSOC.
DICK RUTHERFORD
103 S. MELDRUM ST.
FT. COLLINS, CO 80521
STAFF PROJECT REVIEW
Date: 06/11 /2003
Staff has reviewed your submittal for GAMBLE SUBDIVISION REPLAT - TYPE I (LUC) #15-
03, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Troy Jones
Topic: General
Number: 27 Created: 6/11 /2003
We are ready for public hearing. All remaining issues can be reviewed with a final compliance submittal
after the hearing. I'd like to shoot for Monday June 30th during business hours for the public hearing, however
I need to coordinate with the hearing officer's schedule, so if that day doesnl work, I'd like to conduct the
hearing sometime later that week. Let me know if there is any time between June 30th and July 3rd that
doesn't work for you, and I'll plan around it.
Number: 28 Created: 6/11 /2003
When you submit final mylars, they need to reflect a condition that has resolved all the remaining comments
from this letter. Submit 2 paper copies of the plat and three paper copies utility plan set together with the
final mylars. Also be sure to submit all redlines back to us.
Department: Engineering Issue Contact: Katie Moore
Topic: Utility plans
Number: 16 Created: 5/28/2003
Please provide a legal description below the title on the cover sheet.
Number: 17 Created: 5/28/2003
Please provide two benchmarks from the City of Fort Collins Vertical Control. The City no longer uses the
bonnet bolt survey.
Number: 18 Created: 5/28/2003
Please include the plat (for reference only) in the utility plan set.
Number: 19 Created: 5/28/2003
Please provide the indemnification statement on the cover sheet: utility plan checklist item I.M.
Number: 20 Created: 5/28/2003
Please label the existing retaining wall. How tall is it?
Number: 21 Created: 5/28/2003
Please show the approximate limits of the street cut and add the note: Limits of street cut are approximate.
Final limits are to be determined in the field by the City Engineering Inspector. All repairs are to be in
accordance with City street repair standards.
Department: PFA Issue Contact: Michael Chavez
Topic: General
Number: 24 Created: 6/3/2003
After reviewing Poudre Fire Authority has no comments concerning this replat.
Page 1