Loading...
HomeMy WebLinkAboutGAMBLE SUBDIVISION REPLAT - 15-03 - CORRESPONDENCE -Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Stormwater Number: 25 Created: 6/9/2003 Please add a F.F. elevation for the new building on the grading plan. Number: 26 Created: 6/9/2003 Is there any proposed grading that differs from existing grading? Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 22 Created: 6/3/2003 Provide a copy of the proposed replat reflecting the 9 foot utility easement shown on the utility plans along the east side of the property. Number: 23 Created: 6/3/2003 Place the proposed curb stop 1-foot from the rear of the utility easement and the meter pit more than 2-feet beyond that. See utility plans for other comments. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel freeb call me at (970) 221-6750. Y urs Tru y, II r �, Troy Jon�s City Plany�er Page 2 Citvof turf Collins STEWART & ASSOC. DICK RUTHERFORD 103 S. MELDRUM ST. FT. COLLINS, CO 80521 STAFF PROJECT REVIEW Date: 06/11 /2003 Staff has reviewed your submittal for GAMBLE SUBDIVISION REPLAT - TYPE I (LUC) #15- 03, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Troy Jones Topic: General Number: 27 Created: 6/11 /2003 We are ready for public hearing. All remaining issues can be reviewed with a final compliance submittal after the hearing. I'd like to shoot for Monday June 30th during business hours for the public hearing, however I need to coordinate with the hearing officer's schedule, so if that day doesnl work, I'd like to conduct the hearing sometime later that week. Let me know if there is any time between June 30th and July 3rd that doesn't work for you, and I'll plan around it. Number: 28 Created: 6/11 /2003 When you submit final mylars, they need to reflect a condition that has resolved all the remaining comments from this letter. Submit 2 paper copies of the plat and three paper copies utility plan set together with the final mylars. Also be sure to submit all redlines back to us. Department: Engineering Issue Contact: Katie Moore Topic: Utility plans Number: 16 Created: 5/28/2003 Please provide a legal description below the title on the cover sheet. Number: 17 Created: 5/28/2003 Please provide two benchmarks from the City of Fort Collins Vertical Control. The City no longer uses the bonnet bolt survey. Number: 18 Created: 5/28/2003 Please include the plat (for reference only) in the utility plan set. Number: 19 Created: 5/28/2003 Please provide the indemnification statement on the cover sheet: utility plan checklist item I.M. Number: 20 Created: 5/28/2003 Please label the existing retaining wall. How tall is it? Number: 21 Created: 5/28/2003 Please show the approximate limits of the street cut and add the note: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs are to be in accordance with City street repair standards. Department: PFA Issue Contact: Michael Chavez Topic: General Number: 24 Created: 6/3/2003 After reviewing Poudre Fire Authority has no comments concerning this replat. Page 1