HomeMy WebLinkAboutGOLDEN MEADOWS BUSINESS PARK - PDP - 14-03 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject. C7Ct JSN �, 1C/'1(7J.v> t�✓�2._S.� ir, /L'- .ri
IPlanner:
Engineer:
Tralfic Operations: � �
}
Date:
.M
Items Requested
Site Land Plat Utilit Drainage fl t Other Items Required
Tngineering k k k
Redlined Items Being Returned
Site land Plat Utility Drainage R t Other Items Being Returned
Stormwater
Water/Wastewate
/,
X
X-
x
Tralfiic Operations
Trans. Planning
Tramfort
Natural Resources
_
Park Planning
Totals 46Z,4
Other:
Hate: All rtdllned items should be returned with the resubmittal/ revislons.
f � .
r
i
Revisions Routing Sheet aLAAA ,
Item: [# - e )
Date:
oo ,,, "��1a"
lor�
�uG P PAP
°° Z
a`' `aao v o 0
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT
ZONING
BUII.DING INSPECTION
LIGHT & POWER
?C
_
MAPPING / DRAFTING
FORESTRY
FCLWD/ELCOB OXELDER
FIRE
POLICE
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION '
POST OFFICE
EFE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE/THOMPSON
CABLE TV Cp p ti
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
RAILROAD: UP or BN/CS
REA/DOE/PRPA
TOTAL I [A-�