Loading...
HomeMy WebLinkAboutRAM'S CROSSING - PDP - 22-03 - CORRESPONDENCE - REVISIONS (3)2) Drainage Report a) Please state the building foundation is slab -on -grade. This is noted on the plans, but not in the report. S&A: First paragraph under Developed Site section. b) On Page 1, please state this site is in the Canal Importation floodplain, not just the Canal Importation basin. S&A: Added to page 1. c) Please attach the Anderson report. It's referenced, but not attached. S&A: Attached Anderson report Department: Traffic Operations Topic: Traffic Number: 31 1111201031 No problems S&A: Acknowledged. Department: Water Wastewater Topic: General Number: 16 112/10/031 Issue Contact: Eric Bracke Created- 1112012003 Issue Contact: Jeff Hill Created. • 712812003 Additional fees may be assessed on this additional usage. Contact Mary Young for additional fee information 221-6700. S&A: Acknowledged. Number: 36 Created. • 1211012003 1121101031 Provide profiles of all proposed storm sewers. S&A: See Sheets 5 & 6 Number: 37 Created: 1211012003 [121101031 Provide complete details for the adjustment of the existing sanitary sewer manhole (see detail attached to plans). S&A: See Sheet 6. Redline drawings are available at the Current Planning front desk. Be sure and return all of your redlined plans when you re -submit. K you have any questions regarding these issues of any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, Bob Barkeen City Planner Page 2 im am RESPONSES FOR CITY COMMENTS L'iatintia�rtL'nEi.ins By TAS and S&A THE ARCHITECTS'STUDIO 12/15/2003 Date: 121,112003 CARR BIEKER 151 W. MOUNTAIN AVE. FT. COLLINS, CO 80524 The Architect's Studio and Stewart & Assoc. have resonded to City Comments as follows: Staff has reviewed your submittal for RAM'S CROSSING POP - TYPE I alIC/ AND FINAL PLAN, and we offer the following comments: ISSUES: Department: Engineering Topic: Engineering Number: 32 112181031 No Problems S&A: Acknowledged Issue Contact: Dave Stringer Created: 121812003 Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number. 19 Created: 713112003 112/9/031 REPEAT COMMENT- There still needs to be a detail regarding the orifice plate and dimensions, as well as how it is to be attached to the inlet. Please provide details for the water quality outlet structures on the plans. An outlet structure similar to the City's standard would be preferred. They can be a smaller version and would provide a better design regarding aesthetics and space usage. An area inlet in the middle of the pond sticking out of the ground may be less appealing visually. S&A: Details for orifice plate added to Sheet No. 6. Number. 33 Created: 121912003 There is a tree still being proposed on top of an area inlet as per previous comment. Please relocate tree. S&A: Tree has been relocated. Topic: Erosion/Sediment Control Number: 34 Created. 121912003 1. The plan has the wrong erosion control notes. Please use the "new" Loveland/Ft. Collins/Larimer County notes for sediment and erosion control. Please add to these any notes specific to the construction of this project. S&A: Notes have been revised. See Sheet 6. 2. There is no erosion control plan that indicates the BMP's to be used and their location. S&A: There are now. See Sheet 4. 3. There are no PS or EFF calculations. S&A: Added PS & EFF to Storm Drainage Report. Topic: Floodplain Number: 35 Created.121912003 1) Sheet 2 of 6- Reference Map. Please change the note to add the word floodplain after Canal Importation Basin. S&A: Added floodplain to Sheet 2 of 6. Page I