Loading...
HomeMy WebLinkAboutRAM'S CROSSING - PDP - 22-03 - CORRESPONDENCE - (4)Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 16 Created: 7/28/2003 (12/10/03) Additional fees may be assessed on this additional usage. Contact Mary Young for additional fee information 221-6700. Number: 36 Created: 12/10/2003 (12/10/03) Provide profiles of all proposed storm sewers. Number: 37 Created: 12/10/2003 (12/10/03) Provide complete details for the adjustment of the existing sanitary sewer manhole (see detail attached to plans). Redline drawings are available at the Current Planning front desk. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, Bob Barkeen City Planner Page 2 STAFF PROJECT REVIEW City of Fort Collins THE ARCHITECTS' STUDIO Date: 12/11/2003 CARR BIEKER 151 W. MOUNTAIN AVE. FT. COLLINS, CO 80524 Staff has reviewed your submittal for RAM'S CROSSING PDP - TYPE I (LUC) AND FINAL PLAN, and we offer the following comments: ISSUES: Department: Engineering Topic: Engineering Number: 32 (12/8/03) No Problems Issue Contact: Dave Stringer Created: 12/8/2003 Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 19 Created: 7/31 /2003 (12/9/03) REPEAT COMMENT- There still needs to be a detail regarding the orifice plate and dimensions, as well as how it is to be attached to the inlet. Please provide details for the water quality outlet structures on the plans. An outlet structure similar to the City's standard would be preferred. They can be a smaller version and would provide a better design regarding aesthetics and space usage. An area inlet in the middle of the pond sticking out of the ground may be less appealing visually. Number: 33 Created: 12/9/2003 There is a tree still being proposed on top of an area inlet as per previous comment. Please relocate tree. Topic: Erosion/Sediment Control Number: 34 Created: 12/9/2003 1. The plan has the wrong erosion control notes. Please use the "new" Loveland/Ft. Collins/Larimer County notes for sediment and erosion control. Please add to these any notes specific to the construction of this project. 2. There is no erosion control plan that indicates the BMP's to be used and their location. 3. There are no PS or EFF calculations. Topic: Floodplain Number: 35 Created: 12/9/2003 1) Sheet 2 of 6- Reference Map. Please change the note to add the word floodplain after Canal Importation Basin. 2) Drainage Report a) Please state the building foundation is slab -on -grade. This is noted on the plans, but not in the report. b) On Page 1, please state this site is in the Canal Importation floodplain, not just the Canal Importation basin. c) Please attach the Anderson report. It's referenced, but not attached. Department: Traffic Operations Topic: Traffic Number: 31 (11/20/03) No problems Issue Contact: Eric Bracke Created: 11 /20/2003 Page 1