HomeMy WebLinkAboutRAM'S CROSSING - PDP - 22-03 - CORRESPONDENCE - (4)Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 16 Created: 7/28/2003
(12/10/03)
Additional fees may be assessed on this additional usage. Contact Mary Young for additional fee
information 221-6700.
Number: 36 Created: 12/10/2003
(12/10/03) Provide profiles of all proposed storm sewers.
Number: 37 Created: 12/10/2003
(12/10/03) Provide complete details for the adjustment of the existing sanitary sewer manhole (see detail
attached to plans).
Redline drawings are available at the Current Planning front desk. Be sure and return all of
your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Bob Barkeen
City Planner
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
THE ARCHITECTS' STUDIO Date: 12/11/2003
CARR BIEKER
151 W. MOUNTAIN AVE.
FT. COLLINS, CO 80524
Staff has reviewed your submittal for RAM'S CROSSING PDP - TYPE I (LUC) AND FINAL
PLAN, and we offer the following comments:
ISSUES:
Department: Engineering
Topic: Engineering
Number: 32
(12/8/03) No Problems
Issue Contact: Dave Stringer
Created: 12/8/2003
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 19 Created: 7/31 /2003
(12/9/03)
REPEAT COMMENT- There still needs to be a detail regarding the orifice plate and dimensions, as well as how
it is to be attached to the inlet.
Please provide details for the water quality outlet structures on the plans. An outlet structure similar to the
City's standard would be preferred. They can be a smaller version and would provide a better design
regarding aesthetics and space usage. An area inlet in the middle of the pond sticking out of the ground
may be less appealing visually.
Number: 33 Created: 12/9/2003
There is a tree still being proposed on top of an area inlet as per previous comment. Please relocate tree.
Topic: Erosion/Sediment Control
Number: 34 Created: 12/9/2003
1. The plan has the wrong erosion control notes. Please use the "new" Loveland/Ft. Collins/Larimer County
notes for sediment and erosion control. Please add to these any notes specific to the construction of this
project.
2. There is no erosion control plan that indicates the BMP's to be used and their location.
3. There are no PS or EFF calculations.
Topic: Floodplain
Number: 35 Created: 12/9/2003
1) Sheet 2 of 6- Reference Map. Please change the note to add the word floodplain after Canal Importation Basin.
2) Drainage Report
a) Please state the building foundation is slab -on -grade. This is noted on the plans, but not in the report.
b) On Page 1, please state this site is in the Canal Importation floodplain, not just the Canal Importation basin.
c) Please attach the Anderson report. It's referenced, but not attached.
Department: Traffic Operations
Topic: Traffic
Number: 31
(11/20/03) No problems
Issue Contact: Eric Bracke
Created: 11 /20/2003
Page 1