HomeMy WebLinkAboutRAM'S CROSSING - PDP - 22-03 - CORRESPONDENCE - REVISIONSNumber: 5 Created: 7/24/2003 Please provide adequate room in the trash enclosure for recyclables TAS Response: Two recyclables are provided in the trash enclosure. Number: 6 Created: 7/24/2003 LABEL BUILDING ENVELOPE, FOOTPRINT, DIMENSIONS AND DISTANCE TO PROPERTY LINES TAS Response: Building envelope, footprint, dimensions and distance to property lines are labeled. Number: 7 Created: 7/24/2003 Note the back-up distance between rows of parking spaces in the easterly parking area_ TAS Response: The 24' backup distance between rows of parking spaces in easterly parking area is noted. Number: 8 Created: 7/24/2003 On the landscape plan, Note #1, states that planted areas are to be xeriscape or irrigated, but the plants listed aren't xeriscape will need to be irrigated unless someone plans on handwatering for the first few years - which is probably unlikely - Please review this TAS Response: Planted areas are to be irrigated. Number: 9 Created: 7/24/2003 Need to put in trees or shrubs at the end of the parking aisles and in the islands between spaces. TAS Response: Refer to response # 24 for the current planning. Redline drawings are available at the Current Planning front desk Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 482-8125. Yours Truly, Carr Bieker Oussama Abbas The Architects' Studio Page 4 3) Utility Plans/Grading Plan a) Show: 100-year floodplain and shallow flooding area, model cross-section lines and BFE lines. (All labeled) b) Include a table showing: City BFE at upstream (west) end of structure, regulatory base flood elevation, lowest floor elevation and lowest elevation of proposed HVAC equipment. c) Add note to the plan that a Iloodplain use permit is required prior to construction, along with a $25 permit application fee. (See note above under report section. If a permit has already been approved during the review process this note can state that a permit has already been completed.) d) Add a note to the plan that a FEMA Elevation Certificate must be completed and approved for the building structure prior to the release of the CO. S&A Response. Added to Sheet No. 4 of Utility Plans Department: Traffic Operations Issue Contact: Ward Stanford Topic: Traffic Number: 20 Created: 8tl /2003 Project needs to provide a TIS, memo. Level. TIS should also include data of existing, and existing plus proposed, bldg's trip generation and peak hr vol's enteringtexiting the site. Also to include current volumes on the roadways serving the sites drive accesses. TAS Response: See Matt Delich report. Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 14 Created: 7/28/2003 The existing water line which extends into the site is a "PRIVATE" line. This line is fed by a master meter located adjacent to City Park Road. No meter or meter pit is required on this building and no fire hydrant will be allowed on the end of this existing water line. S&A Response: Meter, meter pit and fire hydrant have been removed. Number: 15 Created: 7/28✓2003 Provide existing and proposed rim elevations on the sanitary sewer manholes which are affected by the developed areas. Clearly define all required adjustments on the overall utility plans. Provide a manhole adjustment detail on the detail sheet. S&A Response. Added adjustment detail to Sheet Six Included all adjustment elevations Number: 16 Created: 7/28/2003 Additional fees may be assessed on this additional usage. Contact Mary Young for additional fee information 221-6700. See site landscape and utility plans for other comments. S&A Response. Acknowledged. Department: Zoning Issue Contact: Jenny Nuckols Topic: Zoning Number: 2 Created: 7/24/2003 Please remove topo lines from final site and landscape plans TAS Response: Topo lines are removed from final site and landscape plans. Number: 3 Created: 7/24/2003 The north HC space should be marked as Van Accessible as well as HC accessible TAS Response: The north HC spaces are marked as Van Accessible as well as HC accessible. Number: 4 Created: 7/24/2003 I don't see any bicycle racks - please showflocate them near building entrances. TAS Response: Bicycle racks are added on east and west sides near building entrances. Additional bike racks are located Inside the building. Page 3 TAS Response: Lighting levels around the trash enclosure are increased to be at least OS fc. Barberry, crimson pygmy will replace the lilac. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 18 Created: 7/31/2003 A drainage easement will be required for all limits of the detention ponds. These can be done by separate document if no replat is to occur. S&A Response: Separate documents will be submitted after plans are approved. Number: 19 Created: 7/31/2003 Please provide details for the water quality outlet structures on the plans. An outlet structure similar to the City s standard would be preferred. They can be a smaller version and would provide a better design regarding aesthetics and space usage. An area inlet in the middle of the pond sticking out of the ground may be less appealing visually. S&A Response: Actually both are sore thumbs but inlets are precast and easier to construct Topic: Floodplain Number: 21 Susan Hayes 8/4/03 Created: 8/4/2003 1) Plat - It appears the plat is being revised so it must show the new floodplain boundary for the Canal Importation Basin. Add an additional note noting the date of the floodplain mapping so as not to cause confusion with the 1990 certification stating the site is not in the floodplain. S&A Response. There is no new plat with this project Notes added to ILC which is a reference map and included with the Utility plans. 2) Drainage Report a) Please clarify whether or riot the building foundation is slab -on -grade- If it has a crawl space or basement, the regulatory flood protection elevation is measured at the lower level, not at finished floor. S&A Response: Added that Ws slab on grade. b) On Page 1 please call out this is in the Canal Importation floodplain. S&A Response. Added to page 1. c) The Anderson report gave a range of regulatory flood protection levels since it was not known yet the exact location of the structure. Based on the given building location, the base flood elevation (BFE) must be calculated at the western edge of the building and this elevation stated in the report. The regulatory flood protection elevation is then calculated by adding 18 inches to the BFE. Please clarify in the report how you arrived at the elevation of 5040.35 for the regulatory elevation. S&A Response: Added to both Sheet MD. 4 of Utility plans/and drainage reporL d) In the report include a table showing: City BFE at upstream (west) end of structure, regulatory base flood elevation, lowest floor elevation and lowest elevation of proposed HVAC equipment. S&A Response. Added to drainage report e) State in report that a floodplain use permit is required prior to construction, along with a $25 permit application fee. A permit is required for both the building as well as any site work done in the floodplain. One permit can be submitted and reviewed now for all work, or two permits can be submitted, one for the site work (submitted prior to beginning site work) and one for the building (submitted at time of building permit application). S&A Response: Added to Sheet 4 and report f) State in report that a FEMA Elevation Certificate must be completed and approved for the building structure prior to the release of the CO. S&A Response. Added to report g) Add statement to the report that this site is in compliance with City Code, Chapter 10, Floodplain Regulations. S&A Response. Added to report. Page 2 Responses for the city comments City of Fort Collins By TAS and S&A Bob Barkeen City Planner City of Fort Collins Date: 11/04/2003 The Architects' Studio and Stewart & Associates have responded to the city comments as follows: ISSUES: Department: Current Planning Issue Contact: Bob Barkeen Topic: General Number: 23 Created: 8/29/2003 Any exterior lighting will need to be shown on the site plan. The Architects' Studio Response (rAS): Exterior lighting is shown on the site plan. Number: 24 Created: 8/29/2003 Canopy trees will need to be provided in the parldng islands within the parking lot. TAS Response: Water line is passing though the parking Islands on the south side. This condition makes It hard to have trees in the parking islands. However, we will have trees 10' away from the water line. Number: 25 Created: 8/29/2003 Please show existing fences on the site plan. Notes should be added showing where fences will be removed to provide pedestrian access to the north_ TAS Response: Existing fence Is shown on the site plan. Fence Is removed on the north end on the site to allow for pedestrian access. Number: 26 Created: 8/29/2003 Additional trees should be added to the north landscape area to fulfil tree stocking requirements. TAS Response: A storm drainage Is located on the north side. This condition makes it hard to fulfill free - stocking requirements. However, we will have tall shrubs. Department: Engineering Issue Contact: Dave Stringer Topic: General Number: 17 Created: 7/30/2003 No comments, everything is on site, need to show manhole and underwalk details Stewart & Associates Response (S&A): Manhole and underwalk details added. Department: Light & Power Issue Contact: Doug Martine Topic: tight & Power Number: 1 Created: 7/9/2003 Developer will need to coordinate power requirements, a location for a pad type transformer, and the electric development charges with Light & Power Engineering (221-6700). TAS Response: Transformer is located on the southeast comer of the building. Department: Natural Resources Issue Contact: Doug Moore Topic: General Number: 22 Created: 8/4/2003 No issues at this time. Department: Police Issue Contact: Joseph Gerdom Topic: General Number: 10 Created: 7/24/2003 Lighting levels around trash enclosure should be 0.5 fc or greater. Also, the lilac at the southwest comer of the trash enclosure creates a potential safety problem - suggest using a lower growing evergreen (not over 3' 0 maturity). Ra=Yjng PDPS.29.03 CLLycmmsSArspns.4m Page 1