HomeMy WebLinkAboutCITY OF FORT COLLINS DRAKE WATER RECLAMATION - REPLAT - 17-03 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: Date: - 8 61,2
Planner: % S Traffic Operations: Engineer:
Items Requested
Redlinedems being Returned
N
o
j
r y
.�
0
Other Items Required
v
J
a
y
0
Other Items being
Returned
Engineering_
Stormwater
Water/Wastewater/FCLWD
Traffic Operations
Transportation Planning
Transfort
Engineering Pvmt.
Light & Power
Technical Services
PFA
TOTALS
Other:
Note: All redlined items should be returned with the resubmittal/revisions.
REVISION ROUTING SHEET
ITEM: 41F-522
Q,e �4,tG f !/ i �7t GEC G �7 /`� A Ti o A)
�7-a3
p %-03
DATE RECEIVED: O-
v
w
g
z
e
F
w
c o
c7
z w
az
o
w
Zz�
o
c F
L o
FILE: PROJECT PLANNER
ZONING
BUILDING INSPECTION
FORESTRY
POLICE - JOE GERDOM
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
WEST
XCELENERGY
SCHOOLS: POUDRE / THOMPSON
AT & T DIGITAL CABLE
CDOT
DITCH COMPANY
RAILROAD: UP or BNSF
REA/DOE PRPA
NATURAL RESOURCES
PARK PLANNING
TOTAL