HomeMy WebLinkAboutCITY OF FORT COLLINS VEHICLE STORAGE BUILDINGS - FDP - 23-03B - CORRESPONDENCE -[6/18/04] Maintain 10 feet minimum separation between inlets and all water/sewer lines. Number: 68 Created: 6/18/2004 [6/18/041 Provide North Weld Water District signature block on these plans. Number: 69 [6/18/04] See site, landscape and utility plans for other comments. Department: Zoning Topic: zoning Number: 57 [6/4/04] No Comments Number: 58 [6/4/04] No comments Created: 6/18/2004 Issue Contact: Jenny Nuckols Created: 6/4/2004 Created: 6/4/2004 Redline drawings are available at the Current Planning front desk. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to cal[ me at (970) 221-6750. Yours Truly, Bob Barkeen City Planner Page 4 Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 27 Created: 12/4/2003 6/16/04 - Since outfall pipe may be relocated farther west, these issues will be detailed with next submittal and will be reviewed at that time. [1/8/04] Please provide more detail for the outfall into the Poudre River and include all proposed construction details like flared - end sections, riprap, etc. A 20-foot wide off -site drainage easement is also required for the outlet storm sewer. If there is already an easement for the existing storm sewer, it would have to provide 10-feet on either side of the proposed storm sewer to be used. This scenario is unlikely and a new easement is probably required. On -site drainage easements are also required for all drainage structures including storm sewers and detention ponds up to the 100-year WSEL. Number: 59 Created: 6/15/2004 Please provide, as much as possible, horizontal separation between the tailings deposit area and the storm sewer. See grading plan. Number: 62 Created: 6/16/2004 Please show the underdrain outfall for the tailings deposit area and design all underdrains to outfall at the toe of the slope of the detention pond. Number: 63 Created: 6/16/2004 Please see additional comments on the redlined plans. Number: 64 Created: 6/17/2004 The Extran model will be reviewed with comments, if any, provided the week of June 21st. Topic: Erosion/Sediment Control Number: 61 Created: 6/16/2004 1. It seems (although it is not really possible to tell) that your calculations reflect completed conditions, not "during construction" conditions with your BMP's. Please clarify. 2. The main site is protected, I did not see any protection to the north of the main detention area to protect the pipeline constructions there???? 3. Your report calls for seeding and mulching, please put a note on the plan to that effect and indicate the area(s) that are to be so treated. 4. The outlet of the detention pond shows "inlet protection". There should be some clarification to this, what is to be utilized there (straw bales will not work). If you have any questions regarding erosion control, please contact Bob Zakely at 221-6700 Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 65 Created: 6/18/2004 [6/18/04] Water meter pit must be placed in a meter pit out side of the building. Provide the appropriate meter pit detail on the detail sheet. Number: 66 Created: 6/18/2004 [6/18/04] Water services may not extend from fire lines. For a water line to be considered a main a fire hydrant must be placed at the end. Number: 67 Created: 6/18/2004 Page 3 [6/3/04] Need signature block for North Weld County Water District and Nauta (neighbor with irrigation lateral crossing this property). Number: 49 Created: 6/3/2004 [6/3/04] Need to dedicate emergency access easement by separate document and to standard, with curves as opposed to 90-degree turns. Number: 50 Created: 6/3/2004 [6/3/04] Note reception number or book and page for all existing easements. Number: 51 Created: 6/3/2004 [6/3/04] Page C4 Note 2. Where is this note referring? Number: 52 Created: 6/3/2004 [6/3/04] Page C6 main building corner is very close to existing easement. Need to make sure future building does not encroach into easement Number: 54 Created: 6/3/2004 [6/3/04] Sheet C12 cross slopes have reverse fall or little slope to gutter. Existing street will require an overlay to correct problems. Approximately station 2+00 to 3+00 Number: 55 Created: 6/3/2004 [6/3/04] Sheet C15 and C17 - How will under drain pipe tie into slope of pond, show detail, Provide better detail of subdrain bedding and fabric system, fabric type, size of aggregate and etc. Number: 56 Created: 6/3/2004 [6/3/04] See additional comments on relined plan sheets. Please return redlines plans with next submittal Department: Engineering Issue Contact: Katie Moore Topic: General Number: 70 Created: 6/18/2004 [6/18/04) Please see redlined utility plan checklist for additional comments. Department: Engineering Issue Contact: Dave Stringer Topic: General Number: 10 Created: 11 /25/2003 [6/3/04] The Rails to Trails easement will need to be vacated prior to Building C being approved. [11/25/031 How and when will rails to trail be vacated? Number: 25 [6/3/04] Created: 12/3/2003 [12/3/03] refer to Larimer County Urban Area Street Standards for scaning requirements for all plan sheets Department: Light & Power Issue Contact: Doug Martine Topic: General Number: 43 Created: 5/19/2004 [5/19/04] No comments Department: Natural Resources Topic: General Number: 44 [6/1/04] No remaining issues. Issue Contact: Doug Moore Created: 6/1 /2004 Page 2 ia STAFF PROJECT REVIEW Citvof Fort Collins BHA DESIGN Date: 06/21/2004 RUSS LEE 4803 INNOVATION DR FT. COLLINS, CO 80524 Staff has reviewed your submittal for CITY OF FTC VEHICLE STORAGE BUILDINGS PDP - TYPE I AND FINAL PLAN, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Bob Barkeen Topic: Drainage Number: 60 Created: 6/15/2004 [6/15/041 Can the chain link fence along Wood Street be vinyl coated? This will improve the appearance and reduce glare off the fence. With the potential of Building C not being completed, a groundcover should be considered for the building area. Also, the landscaping was designed with the idea that this building would be built and provide screening for this area, several trees may need to be planted in the rear of the building envelop to provide screening if the building is not built. Please add a note indicating that the "Rails to Trails" easement will be vacated prior to the issuance of a building permit for Building C. Department: Engineering Issue Contact: Katie Moore Topic: Civil plans Number: 71 Created: 6/18/2004 [6/18/04] Sheet C11- street plan and profile: Why does the curb angle east at the north property line? If curb and gutter is needed for drainage purposes north of the property line, it should continue straight north as opposed to angling or curving to narrow the street north of the development site. Number: 72 Created: 6/18/2004 [6/18/04] Street design - C11 - The maximum grade break allowed is 0.4% and should be met even when tying to existing grades. Number: 73 Created: 6/18/2004 (6/18/04] Please provide 500' offsite design of Wood Street to the north as required per LCUASS. Number: 74 Created: 6/18/2004 [6/18/04] Please provide additional elevations so that cross -Slopes can be verified. Do you have data for the east edge/flowline of Wood Street? Department: Engineering Issue Contact: Dave Stringer Topic: Civil plans Number: 45 Created: 6/3/2004 [6/3/04] Review LCUASS appendix E-6 regarding scanning quality Number: 46 Created: 6/3/2004 [6/3/04] Need off -site easements for storm sewer work and any work out side of property. Number: 47 Created: 6/3/2004 [6/3/04] Is some form of permit required for work in Poudre River? Number: 48 Created: 6/3/2004 Page 1