Loading...
HomeMy WebLinkAboutCITY OF FORT COLLINS VEHICLE STORAGE BUILDINGS - PDP - 23-03A - CORRESPONDENCE - REVISIONS (3)Vehicle Storage Building Responses to City of Fort Collins Review Comments By TEC 5/13/04 Responses to comments made by En2ineerine 5. See revised plans. 6. The new driveway on Wood Street has been deleted. 7. Soils reports attached with this submittal. 8. See revised plans. 9. See revised plans. 10. Rails to Trails is being vacated by the City of Fort Collins and is currently in process. 24. Verification of existing easement has been previously forwarded. 25. Plans conform to scanning requirements. Responses to comments made by Natural Resources A detail of the outlet to the Poudre River has been provided in the revised plans. The rip -rap stabilization matches the existing rip -rap on the river bank. No existing vegetation on this section of river bank exists. Responses to comments made by Poudre Fire Authority 33. See revised plans for Emergency Access Easement location. 34. See revised plans for fire hydrant. location. Responses to comments made by Stormwater Utility 26. SWMM analysis revised. 27. See revised plans. The outlet storm sewer sits inside an existing 25' utility easement. However, an existing building sits 5' inside the existing easement. The storm sewer is placed outside of the centerline of the easement to minimize impact to the building. 28. Floodplain is shown on the drainage report exhibit. 29. See revised plans. 30. See revised plans. 31. See revised drainage report. Responses to comments made by Water Wastewater 18. See revised plans. 19. See revised plans. 23. See revised plans.