Loading...
HomeMy WebLinkAboutCITY OF FORT COLLINS VEHICLE STORAGE BUILDINGS - PDP - 23-03A - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTI. INTRODUCTION A. Purpose The purpose of this report is to analyze the stormwater impacts to site development at the City of Fort Collins Utilities, Fleet and Facilities Services site. The Facility is located in the southwest quarter of JSection 2, Township 7 North, Range 69 West, of the Sixth Principal Meridian, City of Fort Collins, Larimer County, Colorado. More specifically, the site is located in the northwest corner of the intersection of Wood Street and Vine Drive. Access to the site is via Wood Street, Vine Drive and Shields Street. See the vicinity map in Appendix A. The proposed improvements to the Utilities, Fleet and Facilities Services site include an increase in impervious areas to Lots 1, 2 and 3; removal of the orifice plate on the detention pond in Lot 1; and replacement of the outlet pipe for the detention pond for the City of Fort Collins Equipment Services Building at 835 Wood Street. B. Scope The scope of this study is to analyze the on -site stormwater facilities at the City of Fort Collins Utilities, Fleet and Facilities Services site for the interim and ultimate developed condition. This scope includes !J quantifying the stormwater flows from this site and its contributing basin, and to route these flows to their outfall at the Cache La Poudre River. This analysis includes the following tasks: 1. Evaluate existing stormwater facilities. 2. Evaluate impacts of the developed site on the existing stormwater facilities. 3: Determine and design method of water quality for the developed flows according to best management practices. 4. Develop stormwater facilities utilizing existing and new systems that meet the City of Fort Collins Drainage Criteria Manual and the Urban Drainage and Flood Control District (UDFCD) Drainage Criteria. o I. INTRODUCTION 11 I I 0 �J 0 t =1 2 P e U 0 TABLE OF CONTENTS 1. INTRODUCTION....................................-................................................................................................................. 1 A. Purpose............................................................................................................................................................I B. Scope...............................................................................................................................................................1 II. HISTORIC CONDITIONS.........................................................................................................................................2 A. Master Plan..................................................................................................................................................... 2 B. Historic Basin Description..............................................................................................................................2 C. Existing Stormwater Conveyance and Facilities.............................................................................................2 III. PROPOSED CONDITIONS....................................................................................................................................... 4 A. Developed Drainage Basins............................................................................................................................4 B. Stormwater System Modeling.........................................................................................................................4 1. Existing Conditions Model....................................................................................................................... S 2. Interim Conditions Model........................................................................................................................ 6 3. Ultimate Conditions Model...................................................................................................................... 6 C. Erosion Control............................................................................................................................................... 7 1. Erosion Control Measures....................................................................................................................... 7 2. Erosion Control Maintenance.................................................................................................................. 8 3. Permanent Stabilization........................................................................................................................... 8 IV. REFERENCES............................................................................................................................................................ 9 Appendices Appendix A — Maps Appendix B — Hydrology Appendix C — Hydraulics Appendix D — Pond Calculations Appendix E — Existing Conditions Model Appendix F — Interim Conditions Model Appendix G — Ultimate Conditions Model Appendix H — Other Reports Referenced OI x CITY OF FORT COLLINS UTILITIES, FLEET AND FACILITIES SERVICES Preliminary Drainage and Erosion Control Report November 14, 2003 The Engineering Co. Fort Collins, CO Project No. 03-102 FA2003 Projects\03-102\REPORT\Drainage Report.doc November 14, 2003 FILE: 03-102 City of Fort Collins Stormwater Department 700 Wood Street P. O. Box 580 Fort Collins, Co 80522-0580 ATTENTION: Mr. Glen Schleuter Dear Glen: We are pleased to submit our Preliminary Drainage and Erosion Control Report for the City of Fort Collins Utilities, Fleet and Facilities Services site. This study was completed in order to analyze the hydrology and hydraulics of the on -site stormwater facilities and their outfall to the Cache La Poudre River. This study was prepared in accordance with the City of Fort Collins Stormwater Design Criteria dated May 1984 and updated January 1999. This report is also in compliance with the Urban Drainage and Flood JControl District's Urban Drainage Criteria Volumes I and 2, dated June 2001, and Volume 3 dated September 1992. Should you have any further questions or require further discussion, please feel free to contact our office. Sincerely, Amber Kauffinan, A on tMeleveery, P.E. Design Engineer Projec The Engineering Co. The Engineering Co. The Engineering Co • 2310 East Prospect • Ft. Collins, CO 80525 • Phone (970) 484-7477 • FAX (970) 484-7488 No Text