Loading...
HomeMy WebLinkAboutRIGDEN FARM, 14TH FILING - PDP - 56-98AO - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT1 l� Imo_ -----_-----�------------------------------ --�-- �\ I __ _ _- _------ _--S--- - __—_ // \fit ' Ii 11- _ _ _ __ _ r -___ _ _ _ _ __________ , I 1 1 I M r I I I n ri l ' .OB 95 i r i .ts 97 - ,. mIo -----= =------------------ ------------ 1 I ii ii' IJ I uff3 I wr! I Im, u + + + it -K-- — — I ,1 uQQI I IF r s I I la I �— "It 91 I a n L7 I +x2 y I 1 Qg R . A3 � A2 I I - ■ At 11 II li �- — — 87 I B3 .83 1 .24 .86 I — It lace it IIIt 14, I It it IW �I II; LOT 11 —i—I—,—A�- — — — —I----- t War I IN ± s�LW;- I if r, III I I Fl___ l " ♦ IL ` i _' <�_ - ' --'. .a1'. ' III �� �} WWALIY/VH . Ira°I L Ile �-- 1! � III 1II in,' I 11 Ix. III II I � 1� I PRELIMINARY PLAN 11 11 III III I11 I11 I II NOT FOR CONSTRUCTION � s 30 75 O 30 60 z SCALE: 1"= 30' �\ u \1 � LEGEND�W oN�E ENE vR MINORSiR V VT ORBAM R NUMBER RUNOFF GOEFFlCIEM ORNNAGE 9ASINAGEA y PROPosEo ararnoN aF ovEaxNoa-.: CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: _ OlY ENGINEER CHECKED BY: _ WRIER L WASN:WATER UMW CHECKED BY: _ STOIIIWAIEII UxUIY CHECKED BY: _ PMKS h RECMIXIM CHECKED BY: _ TRM fNGNEEA CHECKED BY: _ to J NLo Oooto W LLJ N 0) W 0InN pOVN� IL �Z0N IO WW ¢ J-jLd a IL JpW� 0 >I-0 p �0(L g aILL 5 a W Q 0 PROD. NO. 104603400I 60F6 582 11.5 d' �-/ 581 49'G7 i1 w I ti/ I J¢ I I1\ w c� S LOCATED GENERALLY IN THE NORTH HALF OF THE SOUTHEAST TER OF SECTION 29. TOWNSHIP 7 NORTH, RANGE 68 WEST 0 PRINCIPAL MERIDIAN, IN THE CITY Or" TORT COLLINS, LARIMEfi' XORADO. POND 212 _Qo27 ' rO N r • m NORTH TPJB. STORM SEWER 18 4 - -- - A • CULVERT CROSW SITE AREA IS 308.33 ACRES, INCLUDING R.O.W. Anln rAcr►#r. �c 91-W Scenario: Base Combined PipelNode Report Label Length Constructed Design Total Excess Average Upstream Downstream Hydraulic Hydraulic Energy Energy Down- Up- Downstream Upstream Slope Capacity Flow Full Velocity Invert Invert Grade Grade Grade Grade stream stream Structure Structure (ft/ft) (cfs) (cfs) Capacity (ft/s) Elevation Elevation Line In Line Out Line In Line Out Cover Cover Hydraulic Hydraulic (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) Grade Grade (ft) (ft) P-1 24.00ft-24inch Concrete 0.012500 25.29 12.30 12.99 3.92 23.00 22.70 27.83 27.76 28.07 27.99 3.50 2.20 27.76 27.20 P-2 100.00ft-24inch Concreti 0.009700 22.28 12.30 9.98 3.92 22.70 21.73 27.57 27.27 27.80 27.51 5.87 3.50 27.27 27.57 P-3 350.00ft-42inch Concret 0.001714 41.65 79.16 -37.51 8.23 21.73 21.13 26.43 23.91 27.48 25.36 1.37 4.37 21.13 26.43 P-4 90.00ft-18inch Concrete 0.011111 11.07 8.30 2.77 4.70 24.93 23.93 29.64 29.08 29.98 29.42 4.07 1.07 29.08 27.50 P-5 144.00ft-18inch Concreti 0.010972 11.00 8.30 2.70 4.70 23.93 22.35 28.81 27.91 29.15 2825 5.85 4.07 27.91 28.81 P-6 55.00ft-24inch Concrete 0.011273 24.02 16.50 7.52 5.25 22.35 21.73 27.56 2727 27.99 27.70 5.87 5.35 27.27 27.56 P-7 24.00ft-18inch Concrete 0.0125001 11.74 8.201 3.541 4.641 22.65 22-351 28.05 27.911 28.391 28.241 5.851 4.551 27.911 28.05 Title: The Center at Rigden Project Engineer. Interwest Consulting Group x:l..Wesign%storm sewer design 12.14.06.stm Interest Consulting Group Storm CAD v5.5 [5.5005] 12/19/06 09:25-43 AM ®Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 2 Scenario: Base J-1 P-1 1-1 N r l 0 r a 0-1 Title: The Center at Rigden Project Engineer: Interwest Consulting Group x:\...\drainage\design\storm sewer design 12.14.06 Interwest Consulting Group Storm CAD v5.5 [5.50051 12/14/06 12:52:27 PM ®Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 1 Inleiwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado RUNOFF COEFFICIENTS & % IMPERVIOUS LOCATION: The Center at Rigden Faun PROJECT NO: I049-034-00 COMPUTATIONS BY: JH DATE: 12/20/2006 Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Streets, parking lots (asphalt): Concrete: Roofs: Gravel: Lawns (flat <2%, heavy soil): Runoff coefficient C % Impervious 0.95 100 0.95 96 0.95 90 0.50 40 0.20 0 SUBBASIN DESIGNATION TOTAL AREA (ac.) TOTAL AREA (sq.it) PAVED AREA (sq.ft) CONCRETE AREA (sq.ft) ROOF AREA (sq.ft) GRAVEL AREA (sq.ft) LANDSCAPE AREA (sq.fl) RUNOFF COEFF. (C) % Impervious REMARKS Al 1.24 54,031 32,563 5,715 9,323 0 6,430 0.86 86 A2 0.83 35,979 24,130 2,174 3,885 0 5,790 0.83 83 A3 0.84 36,568 26,092 5,085 1,561 0 3,830 0.87 89 A4 0.85 37,026 294 2,802 21,067 0 12,863 0.69 59 A5 0.14 6,147 0 1,106 4,875 0 166 0.93 89 A6 0.08 3,454 0 491 2,963 0 0 0.95 91 A7 0.10 4,456 0 609 3,161 1 686 0.83 77 Equations Calculated C coefficients & % Impervious are area weighted C=£(CiAi)/At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci In = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai's Flow.xls Cval quality outlet structures and sedimentation forebays. The outlet for Pond 216 will be an inverted siphon under the Boxelder Ditch, the Fossil Creek Reservoir Inlet Ditch (FCRID) and the existing Ziegler Road. Pond 216 replaces two temporary detention ponds (Ponds 221 & 222) constructed with Rigden Filing One. The outlet for Pond 269 will be a 8-foot by 4- foot box culvert under the proposed Ziegler Road into FCRID. Water Quality Ponds 1, 2, and 3 will store Rigden II runoff for water quality purposes before releasing it to the Foothills Regional Channel. Pond 1 will be located just west of Rigden Parkway and Pond 2 will be located just east of Rigden Parkway. Pond 3 will be located just east of Chase Drive. Detention Pond 212 was sized in the O.D.P. and will be constructed with Rigden Farm — Filing Eight. The pond has been designed to match the stage -storage -discharge from the O.D.P. Detention Pond 212 is located west of Kansas Drive and north of Waukee Drive. Table 5.2 summarizes the operating parameters for the proposed water quality ponds for Rigden 11. Appendix G provides the pond sizing calculations. Table 5.2 Water Qualitv Pond Summary MAJOR BASIN Trib. area (acres) Impervious Ratio, la % Impervious i = la/100 WQCV (watershed inches) Design Volume, Vol. (ac-ft) WO Pond 1 5.56 59 0.59 0.23 0.13 WO Pond 2 3.52 1 55 1 0.55 0.22 1 0.08 WO Pond 3 25.25 1 51 1 0.51 0.21 1 0.53 5.4 Detention Pond Outfall Analyses Major outfall structures are proposed for the two on -site detention ponds. Detention Pond 216 in the northeast comer of the site will have an inverted siphon outlet as specified in the "Overall Drainage Report for the Rigden Farm O.D.P." Pond 216 has an temporary outlet that will be utilized until the downstream conveyance facilities are constructed. Detention Pond 269 in the southern portion of the site will have an 8' by 4' reinforced box culvert outlet. Both ponds will have inlet boxes with water quality control plates and weirs sized to control outflows. Trash racks have been designed for both inlet boxes. Drainage and Erosion Control Report Page 19 Rigden Farm —Filing Six February 8, 2002 7ti The values recommended by the City of Fort Collins were used for the percent imperviousness. These values were also close to the estimated values for the Rigden Farm development. For commercial areas, a percent impervious value of 90% was used and for multifamily areas, 70% of the area was assumed impervious. For single family residential sub -basins, 45% of the area was assumed impervious. Basin widths were calculated based on an average overland flow path length that varies.according to land use. For undeveloped basins, the overland flow path is estimated to be between 100 ft and 500 ft depending on the topography. For developed basins, the overland flow path is estimated to be between 50 to 300 ft. The following table summarizes the basin parameters for the Rigden II model.. Table 5.1 - SWMM Subbasin Parameters for Ultimate Development SWMM Subbasin Basin Width W (ft) Area ac. Overland flow Path, L ft % Impervious Slope Basin Description 58 6000 41.1 298 90% 1.0% Commercial 581 3450 22.4 283 90% 0.8% Commercial 582 1700 11.5 295 80% 2.0% Multi -family & Commercial 583 1 400 2.5 267 70% 2.0% Multi -family 584 2900 19.7 296 90% 1.5% Dense multi -family & commercial 65 1200 4.0 145 10% 3.0% Adjacent to Regional Channel 66 4900 15.1 134 12% 2.0% Adjacent to Regional Channel 67 10400 99.2 415 45% 2.0% Single Family 671 2300 8.3 157 19% 10.0% Adjacent to FCRID 68 2400 25.2 457 45% 2.0% Single Family 681 640 6.0 408 45% 1.5% Single Family 682 500 3.5 305 45% 1.5% Single Family 69 5800 53.5 402 45% 1.9% le Family 691 1700 3.9 100 31% 10.0% AdSin jacent to FCRID total area= 315.9 ac 5.3 Pond Description Six ponds will be provided for Rigden II. Two primary water quality/detention ponds will be located in the northeast and southeast corners of the site. Three water quality ponds will be located south of the Foothills Regional Channel. A detention pond will be located in the Northwest Roads area. Water quality/detention Pond 216 will be north and east of the improved Drake and Ziegler Roads and water quality/detention Pond 269 will be south of Rigden Parkway and west of Ziegler Road. Both Ponds 216 and 269 will be large wet ponds with detention volume available above the permanent water surface elevation. The detention ponds will have water Drainage and Erosion Control Report IPage 18 Rigden Farm - Filing Six February 8, 2002 Fgc)m" FINAL DRAkWP,GE AND EROSION CONTROL REPORT RIDDEN FARM — FILI SIG 51X" K = headloss coefficient V = average velocity (ft/s) g = gravitational constant (32.2 ft/s2) The storm pipe design was performed for the ultimate build -out of Rigden II in all three parcels and is included in Appendix E of this report. .11 5. REGIONAL HYDROLOGY 5.1 Methods and Approach The hydrology for Rigden II, as in the O.D.P., was evaluated using an integrated UDSWMM2PC, MODSWMM. The original Master Plan SWMM model was developed by Resource Consultants Inc. in 1981. An updated Master Plan model was completed by Faucett Engineering in 1997 using the then -current 100-year rainfall depth (2.89" of rain for the 100-year, 2-hour storm). An update to the Master Plan SWMM model was completed by Anderson Consulting Engineers, Inc. (ACE) in July 1999. The "Overall Drainage Report for the Rigden Farm O.D.P." (Feb. 1999) was developed concurently with the ACE model and includes Rigden Farms ultimate conditions. The Rigden O.D.P. model was used as a basis for the SWMM model for this study because it incorporates the most up to date information for the Foothills Basin and Rigden Farm. 5.2 'Development of SWMM Model The SWMM model for Rigden II revises the basin parameters to match the proposed improvements. Minor changes were made to sub -basins 58, 65, 66, 67, 68, 69, 581, 582, 584, and 681 of the Rigden O.D.P. model. Sub -basins 671, 691, and 682 were added. The conceptual storage -discharge rating curve for Detention Pond 216 was modified to reflect proposed grading and Detention Pond 269 was added in Basin 69. The total basin area for Rigden Farm in the Rigden II model is 315.9 acres, 0.7 acres less than the Filing One model. This difference is due to changes in basin boundaries along Drake Road and Timberline Road. A copy of the SWMM Model Sub -basin Delineation is included in Appendix F of this report. Drainage and Erosion Control Report Page 17 Rigden Farm — Filing Six February 8, 2002 150:2 5.1 1.0 1 12. 152:5 78.2 3.S 0 37. 153:5 6.8 1.4 4 32. 154:5 5.5 1.4 4 19. 156:5 S7.7 1.8 0 44. 157:2 28.0 .1 3.3:D 3 35. 159:2 8.4 .1 2.7:D 2 2. 162:3 82.6 (D1REC1' FL04) 0 36. 163:4 09.8 1.0 0 51. 172:2 58.8 .1 6.6:D 1 16. 173:5 53.2 4.1 1 29. 178:9 37.0 4.1 0 51. 184:5 73.3 4.9 0 40. 185:1 84.6 2.0 2 30. 188:1 70.3 3.0 0 46. 193:2 73.3 .1 12.6:D 1 32. 194:1 22.8 7.1 0 55. 201:2 22.9 .1 1.1:D 0 44. 207:2 20.0 .1 9.7:D 2 14. 208:2 20.0 .1 9.5:D 2 6. 209:2 9.0 .1 S.S:D 2 15. 210:2 25.4 .1 1.2:D 0 50. 911.2 9.9 .1 3.1:D 2 3. 214:2 23.3 .1 11.5:D 2 10. 215:2 85.1 �08.3 .1 33.2:D 2 19. 216:2 .1 33.0:D 3 32. 217:2 19.7 .1 2.2:D 1 16. 218:2 09.5 .1 1.6:D 0 39. 244:2 6.0 .8 2 18. 251:2 5.4 .1 .6:D 1 27. 257:1 463.1 3.7 3 33. 269:2 129.7 .1 4.4:D 0 47. 273:3 88.8 (D= FLLW) 0 51. 288:3 22.9 (D= FLOW) 0 41. 303:2 5.6 .1 1.4:D 1 55. 306:2 35.2 .1 .2:D 0 36. 307:5 31.5 2.0 0 39. 313:2 1.7 .1 .6:D 1 37. 338:2 64.1 .1 5.6:D 1 16. 351:3 315.3 (DD2F)✓I' FLOW) 0 36. 361:4 815.3 1.0 0 36. 400:4 60.5 .6 0 40. 401:4 32.5 .8 0 41. 410:2 2.8 .1 2.9:D 2 15. 413:2 1.5 .1 1.9:D 2 7. 444:3 127.1 (D= FLLW) 0 55. 466:3 (DIRWr FLA4) 0 40. 471:3 LL17.2 48.0 (DST FLOE) 0 38. 500:3 10.18.2 (DIPB7r F1LW) 0 S9. 544:3 6.0 (DD= FLOW) 2 14. 562:3 30.0 (D= FLOW) 0 29. 600:4 27.0 1.3 0 36. 644:3 21.1 (DII2FSP FLOW) 0 55. 662:3 52.6 (D= FLOW) 0 36. 849:3 �14.2 (D)RE= FLON) 0 16. 916:3 28.3 (D)72EErP FLLW) 0 41. au� e:.aa; cu Rigden Farm- Alternate Outlet -106 YR SWMM output File: Alt-100.out, 12/05/01 Page 12of12 APPENDIX PREVIOUS REPORT EXCERPTS DRAINAGE CALCULATIONS Mr. Basil Hamdan December 20, 2006 Page 4 of 4 nuisance that has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings, or causing naissance to.persons. The Contractor will be held liable for any damage resulting from dust originating from his operations under these specifications on right- of-way or elsewhere. It is unlawful to track or cause to be tracked mud or other debris onto city streets or rights -of - way. Wherever construction vehicles access routes or intersect paved public roads, previsions must be made to minimize the transport of sediment by runoff or vehicles tracking onto the paved surface. Stabilized construction entrances are required with base material consisting of 6" coarse aggregate. The contractor will be responsible for clearing mud tracked onto city streets on a daily basis. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Silt fence will require periodic replacement. Maintenance is the responsibility of the contractor. The Contractor shall obtain and comply with a CDPHE Stormwater Discharge Permit. All disturbed areas must be seeded and mulched within 30 days of project start. Vegetation shall not be considered established until a ground cover is achieved which is demonstrated to be mature enough to control soil erosion to the satisfaction of the City Inspector, the Permit and to survive severe weather condition. If you have any questions or comments please contact me at (970) 674-3300. Sincerely, Robert Almirall, P.E. Colorado Professional Engineer 33441 Attachments Mr. Basil Hamdan December 20, 2006 Page 3 of 4 side of the basin will enter the flowline on Custer Drive via sidewalk chase drains and sheet flow across the sidewalk and landscape areas. From the flowline, water will be transported via curb and gutter into the existing stonn drain system on Custer Drive. The east side of the basin will also include sidewalk chase drains and sidewalk sheet flow to channel the water into the flowline on Iowa Drive. Once in the flowline on Iowa Drive, water will be transported via curb and gutter and street sheet flow to the existing storm drain system on Custer Drive. Basin A5 and A6 includes half of the roof drainage from Lots 2 and 3 respectively, on -site sidewalks and landscape areas. Water from the roof drains will enter the flowline on Illinois Drive via sidewalk chase drains. Water from the sidewalk and landscape areas will sheet now in to the flowline. Once in the flowline on Illinois Drive, water will be transported via curb and gutter into existing storm drain inlets included in the storm drain system near the center of the property. Basin A7 is comprised of a portion of roof drainage from Lot 10, half of the roof drainage from Lot 11 and on -site sidewalks. Water from the roof drains will enter the flowline on Iowa Drive via sidewalk chase drains. Water from the sidewalk will sheet flow in to the flowline. Once entering the flowline on Iowa Drive, water will be transported via curb and gutter to the existing storm drain system on Limon Drive. Filing Six similarly utilized an "Ultimate Development' condition for the basins that make up the proposed site. All area contained within the site were assumed to be Commercial or Multi - Family with an imperviousness of 80% used for the middle basin (SWMM Sub basin 582) and 90% for both the north and south basins (SWMM Sub basins 581 and 58). The north and middle basins flow into the existing storm drain system near the center of the property. The weighted average site imperviousness for the combined basins is 86%. The combined basin corresponds to Basins Al, A2, A3, A5 and A6 on the proposed drainage plan. The weighted average site imperviousness for the five basins on the plan is also 86%. The south basin corresponds to Basin A4 on the proposed drainage plan. Basin A4 has a 59% impervious, which is well below the 90% impervious called out in the SWMM model. Therefore, it is requested that the site be deemed in substantial conformance with the previously approved Final Drainage Reports. EROSION CONTROL (Final Erosion Control Design will be completed at Final Compliance) Erosion and sedimentation will be controlled on -site by use of silt fences, area inlet protection, a gravel construction entrance, and seeding and mulch. The measures are designed to limit the overall sediment yield increase due to construction as required by the City of Fort Collins. During overlot and final grading the soil will be roughened and furrowed perpendicular to the prevailing winds. During the performance of the work required by these specifications or any operations appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall furnish all labor, equipment, materials, and means required. The Contractor shall carry out proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust Mr. Basil Hamdan December 20, 2006 Page 2 of 4 PROPOSED DEVELOPMENT The proposed development will include the construction of eleven commercial buildings, a large on -site parking area, on -site sidewalks and landscape areas. BASIN DESCRIPTIONS The site is divided into seven basins: Al, A2, A3, A4, A5, A6 and AT Basin Al is comprised of drainage from half of the roofs of Lots 1, 2, 10 and 11, over a third of the drainage from the parking lot, on -site sidewalks and landscape areas. Water will flow from the roof drains into sidewalk chase drains and sheet flow over the proposed parking lot into the proposed drainage inlet. Water from the on -site sidewalks and landscape areas will flow via sheet flow into the proposed parking lot and into the proposed inlet. From the inlet, water will be transported via storm drain pipe to the existing storm drain system near the center of the property. Basin A2 is comprised of a portion of roof drainage from Lot 3, half of the roof drainage from Lot 9, about a third of the drainage from the parking lot, on -site sidewalks and landscape areas. Water will flow from the roof drains into sidewalk chase drains and sheet flow over the proposed parking lot into the proposed drainage inlet. Water from the on -site sidewalks and landscape areas will flow via sheet flow into the proposed parking lot and into the proposed inlet. In addition, water will flow from the proposed driveway entrance on Iowa Drive via curb and gutter to a transition point in the parking area, then sheet flow into the proposed inlet. From the inlet, water will be transported via storm drain pipe to the existing storm drain system near the center of the property. Basin A3 is comprised of half of the roof drainage from Lot 8, about a third of the parking lot drainage, on -site sidewalks and landscape areas. Water will flow from the roof drains into sidewalk chase drains and sheet flow over the proposed parking lot into the proposed drainage inlet. Water from the on -site sidewalks and landscape areas will flow via sheet flow into the proposed parking lot and into the proposed inlet. From the inlet, water will be transported via storm drain pipe to the existing storm drain system near the center of the property. Hydraulic calculations for sizing the proposed stormwater inlets and pipe discussed in Basins Al, A2, and A3 were completed using StormCAD hydraulic modeling software. The 100-year storm was analyzed to insure that the parking lot functions with minimal flooding. Basin A4 is comprised of roof drainage from Lots 4, 5, 6, 7, a portion of roof drainage from Lots 8, 9, 10; on -site sidewalks, two large landscape areas and a small portion of the access drive off Iowa Drive. On the west side of the basin, water from the roof drains will enter the flowline on the Illinois Drive via sidewalk chase drains. Water from the sidewalk will sheet flow into the flowline. Once entering the flowline on Illinois Drive, water will be transported to existing inlets via curb and gutter and into the storm drain system along Custer Drive. Drainage from the south December 20, 2006 INTERWEST - CONSULTING G R O U P Mr. Basil Hamdan City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80522 Re: The Center at Rigden Farm — Preliminary Drainage Report Dear Basil, Please accept the following letter report on behalf of The Center at Rigden Farm to demonstrate the site's compliance with the previously approved Final Drainage Report for Rigden Farm Filing Six, as prepared by JR Engineering. INTRODUCTION The site, unplatted, but commonly referred to as Tract P, contains 4.08 acres and is bounded on all four sides by existing city streets, namely Custer Drive, Illinois Drive, Iowa Drive and Limon Drive. The site is bisected by a previously constructed storm drainage pipe which outlets in an existing detention pond which is referred to as Pond 212. The design for this pond was referenced in the Filing Six report stating that "Pond 212 was sized in the O.D.P. and will be constructed with Filing Eight". All detention and water quality requirements for this site have been met by the overall Ridgen Farm development. Rigden Farm Filing Six updated the basins in the vicinity of this pond based upon anticipated ultimate development; however, the original pond sizing (stage -storage) was not altered. Filing Six did update the SWMM model using the updated basin information; however, the EXTRAN model was not re -run with that Filing. Excerpts from the Filing Six report are attached for reference. The Filing Six updated SWMM model shows that the peak storage of Pond 212 during a 100-year storm event is 0.8 acre-feet. EXISTING CONDITIONS The site is currently vacant and contains dirt, and dry shrubs. The existing site also includes two existing storm drain pipes. A 36" RCP storm pipe enters the site from the west and connects to the 42" RCP at an existing manhole near the proposed driveway entrance off Illinois Drive. An existing 18" RCP with an area inlet entering the manhole from the north will be removed with the proposed development. The site drains in three distinct directions and the general basin lines, as proposed in the SWMM model, have been maintained with the proposed development and in conformance with the Ultimate Development basin delineations as shown in the Rigden Farm Filing Six Final Drainage Report. 1218 W. ASH, STE. C • WINDSOR, COLORADO 80550 TEL. 970.67A. 3300 • EAx.970.674.3303