Loading...
HomeMy WebLinkAboutTEFFT ACRES, LOT 9 REPLAT - PDP - 12-03 - DECISION - FINDINGS, CONCLUSIONS & DECISIONi e ri .ZD P/�%�r Z Z.G, iZ - %rd ifir low It. e7f - 171 --------------------- a Replat of Lot 9, Tefft Acres Subdivision Administrative Hearing Findings, Conclusions, and Decision May 8, 2003 Page 4 of 4 The proposed lots comply with the design standards in that each lot has vehicular access to a public street, and the side lot lines are at substantially right angles or radial to the street. The design of the adjacent platted roads is unaffected. B. Section 3.3.1 [C] (1) - Public Sites, Reservations, and Dedications The plat will indicate proper dedication for utility easements as needed to serve both lots. SUMMARY OF CONCLUSIONS A. The Replat of Lot 9, Tefft Acres Subdivision Project Development Plan subject to administrative review and the requirements of the Land Use Code (LUC). B. The Replat of Lot 9, Tefft Acres Subdivision Project Development Plan satisfies the development standards of the UE zoning district. C. The Replat of Lot 9, Tefft Acres Subdivision Project Development Plan complies with all applicable General Development Standards, including the Plat Standards, contained in Article 3 of the Land Use Code. DECISION The Replat of Lot 9, Tefft Acres Subdivision Project Development Plan, #12-03, is hereby approved by the Hearing Officer subject to the following conditions: 1. This PDP approval is subject to final approval of the Taft Hill Seventh Annexation. 2. The Applicant shall ensure that the subdivision plat is modified prior to execution and recordation to include an eight (8) foot -wide utility easement at the front of both lots abutting Moore Lane. Dated this 9th day of May 2003, per authority granted by Sections 1.4.9(E) and 2.1 of the Land Use Code. Cameron Gloss 17 Current Plan ningD irector Replat of Lot 9, Tefft Acres Subdivision Administrative Hearing Findings, Conclusions, and Decision May 8, 2003 Page 3 of 4 FACTS AND FINDINGS 1. Site Context The surrounding zoning and land uses are as follows: N: UE; existing single family residential (Tefft Acres Subdivision) S: UE; existing single family residiential (Tefft Acres Subdivision) E: UE; existing single family residential (Tefft Acres Subdivision) W: RL; UE; existing single family residential (Tefft Acres Subdivision) The parcel will be annexed into the City as part of the South Taft Hill Seventh Annexation on May 20, 2003. The property was subdivided as Lot 9 of the Tefft Acres Subdivision in Larimer County (date unknown). 2. Compliance with Article 4 and the UE Zoning District Standards: The plat complies with the standards found under Article Four of the Land Use Code. The applicant's request to plat the 7.08 acre parcel, in order to create two new lots of 2.37 and 4.71 acres, complies with the following standards: A. Section 4.1(B) — Land Use Standards The proposed lots greatly exceed the minimum 1/2 acre lot size required in the UE zone district. Further, the minimum lot width of one hundred feet will be exceeded for both lots. There was no evidence introduced at the hearing to contradict the Staff Report; therefore, the Hearing Officer finds that the Subdivision is in conformance with the applicable requirements found in Article 4 of the Land Use Code. 3. Compliance with Article 3 of the Land Use Code — General Development Standards A. Section 3.3.1 [B] — Lots Replat of Lot 9, Tefft Acres Subdivision Administrative Hearing Findings, Conclusions, and Decision May 8, 2003 Page 2 of 4 properly posted, legal notices mailed and notice published. PUBLIC HEARING The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the hearing at approximately 4:00 on April 24, 2003 in Conference Rooms C and D at 281 N. College Avenue. At the request of the Hearing Officer, the Hearing was continued to May 8, 2003 at 4:00 p.m. in Conference Room A at 281 North College Avenue, Fort Collins, Colorado. HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE: The Hearing Officer accepted during the hearing the following evidence: (1) Planning Department Staff Report; (2) application, plans, maps and other supporting documents submitted by the applicant and the applicant's representatives to the City of Fort Collins; and (3) a tape recording of testimony provided during the hearing. The LUC, the City's Comprehensive Plan (City Plan), and the formally promulgated policies of the City are all considered part of the evidence considered by the Hearing Officer. The following is a list of those who attended the meeting: From the City: Steve Olt, City Planner From the Applicant: Richard Pitner Jeff Couch, Team Engineering From the Public: None Written Comments: None Community Planning and Environmental . ervices Current Planning Citv of Fort Collins CITY OF FORT COLLINS ADMINISTRATIVE HEARING OFFICER TYPE I ADMINISTRATIVE HEARING FINDINGS, CONCLUSIONS AND DECISION ADMINISTRATIVE HEARING DATE: May 8, 2003 (continued from September April 24, 2003) PROJECT NAME: CASE NUMBER: OWNER: APPLICANT: HEARING OFFICER: PROJECT DESCRIPTION: Replat of Lot 9, Tefft Acres Subdivision Project Development Plan #12-03 Richard Pitner 3209 Moore Lane Fort Collins, CO 80526 Team Engineering c/o Jeff Couch 3468 Shallow Pond Drive Fort Collins, CO 80528-7002 Cameron Gloss Current Planning Director The Applicant has submitted a request to replat one lot of 7.08 acres into two lots. Proposed Lot 9A would be 2.37 acres and Lot 96 would be 4.71 acres. There is one single family house existing on the property, which is addressed as 3209 Moore Lane. SUMMARY OF HEARING OFFICER DECISION: Approval, with conditions ZONING DISTRICT: UE-Urban Estate STAFF RECOMMENDATION: Approval NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established no controversy or facts to refute that the hearing was 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020