Loading...
HomeMy WebLinkAboutTEFFT ACRES, LOT 9 REPLAT - PDP - 12-03 - CORRESPONDENCE -PFA hs no comments on the division of lot 9, but reserves the right to comment on any future building on the two new lots. Department: Police Issue Contact: Joseph Gerdom Topic: Plat Number: 10 Created: 3/31 /2003 No comments. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, Alt,e� Steve Olt City Planner Page 2 STAFF PROJECT REVIEW Citv of Fort Collins TEAM ENGINEERING Date: 4/11/2003 JEFF COUCH 3468 SHALLOW POND DR. FT. COLLINS, CO 80528 Staff has reviewed your submittal for TEFFT ACRES, LOT 9 REPLAT - TYPE I (LUC), and we offer the following comments: ISSUES: Department: Engineering Topic: Plat Number: 3 What are street names other then Moore Lane Issue Contact: Dave Stringer Created: 3/17/2003 Number: 4 Created: 3/17/2003 Is all of cul-de-sac existing? Appears some may be new. Needs to meet Poudre Fire Authority requirements for radii Number: 5 Created: 3/17/2003 Need to submit a variance request for not completing street improvements at this time to the City Engineer. Refer to LCUASS 1.9.4 Number: 6 Created: 3/17/2003 Developer is required to enter into a Development Agreement with the City for his obligation towards future street improvements to Moore Lane and Moffet Drive. Number: 7 Created: 3/17/2003 Need to dedicate easements as needed along all lot lines Number: 8 Created: 3/17/2003 Add note to plat that no access to lot 9A shall be taken from Moffet Drive Department: Light & Power Issue Contact: Doug Martine Topic: Electric Service Number: 1 Created: 3/7/2003 This area is currently receiving electric service from Excel Energy (Public Service Co.). If this development occurs after the electric service provider has been transferred to Ft. Collins Light and Power, it will be subject to Light & Power requirements and charges. If development occurs before the transfer, it will be subject to Excel Energy requirements requriements and charges. The transfer has not been scheduled. Topic: Plat Number: 2 an 8 ft. easement is required along Moore lane. Department: Natural Resources Topic: Plat Number: 9 No issues related to replat. Department: PFA Topic: Plat Number: 11 Created: 3/7/2003 Issue Contact: Doug Moore Created: 3/25/2003 Issue Contact: Michael Chavez Created: 4/4/2003 Page I