constructions?
Number: 229 Created: 6/6/2008
[6/6/08] Is MH 1 an existing manhole? There is an existing MH near that location. The sewer
service for 2216 Laporte connects to that existing MH.
Number: 230 Created: 6/6/2008
[6/6/08] The property at 2213/2215 Laporte is connected to the existing 27-inch water main in
Laporte which will likely be abandoned. This property must be reconnected to the other 27-inch
main on the north side of Laporte.
Number: 231 Created: 6/6/2008
[6/6/08] Pothole ALL utilities in the intersection of Laporte and Briarwood and at the connection
location to the west. This information will be needed in design to identify any conflicts and do a
complete design for these connections. The connection on the west will be to the 27-inch
concrete line in the north half of Laporte, and the connection on the east will be to the 27-inch
steel line in the south half of Laporte.
Number: 232 Created: 6/6/2008
[6/6/08] See redlined plans for other comments.
Due to numerous outstanding comments and concerns, the administrative hearing
cannot be scheduled until they are adequately addressed with City staff. The item has
tentatively been scheduled for a June 26, 2008 hearing; however, the applicant must
satisfy several departments' concerns before the letters of notification can be mailed.
Wednesday afternoon, June 11`", is basically the "drop -dead" date because the letters
have to go out no later than June 12`h for the item to stay on the June 26'" agenda date.
Be sure and return all red -lined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6341.
Yours Truly,
Steve Olt
City Planner
cc: Susan Joy
Bill Veio, Solitaire Homes, LLC
Loonan & Associates, Inc.
LSC Transportation Consultants, Inc.
URS Corporation
Terracon Consulting Engineers & Scientists
Cedar Creek Associates, Inc.
Current Planning file #33-07
Page 10
Steve Olt - SanctuaryWestPDP.Revisions^' •onimentLetter.doc Page 9
Topic: Utility Plans - Storm Profiles
Number: 72 Created: 10/30/2007
[6/6108] Just carrying this item through until FC. Street standards require that the concrete
section be done from PC to PC by street block.
[5/5/08] [3/19/08] Most of the cover issues have been taken care of with the exception of two
places. You may construct a 30' concrete section over Storm 5 per Rick Richter in Pavement
Management. A joint detail will be required in FC for that section. Storm 5A is acceptable
provided that a note is placed on the plan and profile sheet stating that Storm 5A is to be placed
behind the curb.
[10/30/07] Minimum cover requirements are not being met. See LCUASS 12.2.2 for minimum
depth requirements (2' below subgrade or 3' to finish). This applies to all utilities and any
structure (box culvert or otherwise).
Number: 249 Created: 6/6/2008
[6/6/08] There is a storm profile missing on sheet 31. See redlines.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 233 Created: 6/6/2008
[6/6/08] Stormwater is ready for a hearing. There are still lots of details that will need to be
finalized during final compliance. Good coordination needs to take place between all parties to
minimize the number of rounds during this stage of approvals.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: WaterMastewater
Number: 182 Created: 5/6/2008
[6/3/08]
[5/6/08] Okay to go to hearing.
Number: 185 Created: 5/6/2008
[6/3/08]
[5/6/08] At final there is a great, great amount of detail to be added such as: Profile of 16-inch
water main; Details on connections to and abandonment of the 27-inch water main; Labels on
all valves, fittings, hydrants, etc; Lengths on all pipes between valves, fittings, manholes, etc;
Show/label all crossings on pipeline profiles; Etc; Etc.
Number: 187 Created: 5/6/2008
[6/3/08] Repeat comment. It is critical to have these large mains shown correctly at the two
proposed connection locations.
[5/6/08] Check existing utilities in Laporte Avenue. There are two 27-inch mains in a portion of
the street.
Number: 227 Created: 6/6/2008
[6/6/08] Add a detail (profile) of the of the water main connecting to the existing main on the
north side of the existing channel near Webb Avenue.
Number: 228 Created: 6/6/2008
[6/6/08] The water service for 2216 Laporte (actually fronts on Briarwood) currently connects to
the 27-inch main to the west which will be abandoned. This service will need to be reconnected
to the new main -in Briarwood. How will service to this property be provided throughout
Page 9
Steve Olt - SanctuaryWestPDP.Revisions-"ommentLetter.doc Page 8
[6/6/08] Still missing the actual dimensions - will need this resolved prior to hearing.
[5/5/08] [3/19/08] Missing some dimensions plus some not meeting standard. Please see
figure 7-24.
[10/30/07] Please call out all the dimensions shown on figure 24 for all street widenings so that
I can determine whether or not they meet standard. Will verify when the information is provided
with the next round of review. The one under most question is the one located at the east end
of Barton.
Number: 69 Created: 10/30/2007
[6/6/08] [5/5/08] [3/19/08] Just carrying this comment through til FC.
[10/30107] Suggest placing the typical street sections on the cover sheet so that there is more
room on the P&P sheets. These are going to get pretty busy in Final Compliance when the FLs
are added.
Number: 70 Created: 10/30/2007
[6/6/08] [5/5108] [3/19/08] [10/30/07] Heads up for FC - CL stationing is required and would
require station equations on all horizontal curves. However, you may provide separate FL
stationing as long as you do one of two things: either provide a cross section at all PCs and
VCs (beginning, middle and end) or spot elevations on the plan view in the same location.
Label the cross slopes to at least one decimal point in those areas. That is the only way we can
see that the min/max cross slope requirements are being met.
Number: 163 Created: 3/20/2008
[6/6/08] FC - Crosspans have been dimensioned on the horizontal control plan but not the
P&Ps.
[5/5/08] [3/20/08] Please dimension all crosspans.
Number: 214 Created: 5/14/2008
[6/6/08] FC
[5/14/08] Please label the curb and gutter type on the plan view as well so that it is very clear
which type of curb is being installed and where.
Number: 215
Created: 5/14/2008
[6/6/08] Missing the "actual' PT to PC dimensions... the standard was called out on
Tavelli/Kruse and missing one completely on the Barton/Eyestone detail.
[5/14108] The street widening detail at the corner of Barton and Eyestone does not match what
is shown in the street profile or what is shown on other sheets.
Number: 246 Created: 6/6/2008
[6/6/08] Design and build the Webb Avenue stub out to standard (sidewalks must be
constructed to the PCs and add barricades).
Number: 247 Created: 6/6/2008
[6/6/08] See sheet 15 and 16 for comments on the street widening details. This needs to be
addressed prior to hearing.
Number: 248 Created: 6/6/2008
[6/6/08] This development is responsible for designing the full street section for Briarwood.
Please show sidewalks on the east side but label as "future".
Page 8
Steve Olt - SanctuaryWestPDP.Revision F-"bmmentLetter.doc Page 7
variance being requested
Number: 220 Created: 5/14/2008
[6/6/08] Please label all private drives as "Private Drives".
[5/14/08] The typical private drive sections are labeled as row. This is not row, it is private.
Number: 251 Created: 6/6/2008
[6/6/08] See redlines for other comments.
Topic: Utility Plans - Grading
Number: 64 Created: 10/30/2007
[6/6/08] [5/5/08] [3/19/08] [10/30/07] Label all slope ratios.
Number: 242 Created: 6/6/2008
[6/6/08] Call out detail D10, 11, 12 or 13 and refer to sheet # for all sidewalk chases in public
row.
Number: 243 Created: 6/6/2008
[6/6/08] Label all retaining walls with tow, bow.
Number: 244 Created: 6/6/2008
[6/6/08] The retaining wall needs to be a minimum of 2' behind the sidewalk and cannot be in
public row. This will push the wall on the neighboring property and requires a letter of intent
prior to scheduling the public hearing.
Number: 245 Created: 6/6/2008
[6/6/08] The inlets cannot be placed within a curve or radius. The inlets shown on Tavelli need
to be moved further south or a formal variance request is required. We will consider allowing
the inlet to stay on the outer curve (it appears that the radius is big enough to construct the box
within it) if there is a good engineering reason why the entire stormline can't be moved south.
The inlet within the inner flowline can't be constructed in that location - the radius is just too
tight. We'll need to address this issue prior to scheduling the public hearing.
Topic: Utility Plans - Horizontal Control
Number: 238 Created: 6/6/2008
[6/6/08] Please label the radius on the interim asphalt curb returns as 25' (as required per
LCLIASS). Please show on the P&P sheets too.
Number: 239 Created: 6/6/2008
[6/6/08] Please label the existing buildings as "to be removed" in the Briarwood LIE and row.
Number: 240 Created: 6/6/2008
[6/6/08] Dimension all row widths.
Number: 241 Created: 6/6/2008
[6/6/08] The private drive in Outlot O needs to be 20' wide in order for the lots to be legal.
Topic: Utility Plans - Plan & Profiles
Number: 68 Created: 10/30/2007
Page 7
Steve Olt - SanctuaryWestPDP.Revisions',ommentl-etter.doc Page 6
[6/6/08] From Technical Services:
1. Boundary and legal closes.
2. Plat looks ok.
3. Off -site easements and row need reception numbers before filing.
Number: 236 Created: 6/6/2008
[6/6/08] Webb Avenue is shown as 53' on the utility plans?
Topic: Traffic Study
Number: 22
Created: 10/30/2007
[6/6/08] [5/5/08] [3/19/08] Please see Denise Weston in Transportation Planning regarding
this comment.
[10/30/07] The Traffic Study needs to address the Pedestrian Level of Service requirements to
and from the site. Please refer to Chapter 4 of the Larimer County Urban Area Street
Standards for this and other requirements. More than likely some sort of sidewalk along
Laporte will be necessary to get the kids back and forth to school. This could be either in
concrete at the ultimate location if you want reimbursement for the oversized portion OR it can
be in asphalt with no reimbursement. The sidewalk along this development's frontage along
Laporte must be constructed at the ultimate with an escrow for the curb, gutter and possibly the
parkway landscaping. It is not known at this time whether or not the trees along Laporte will be
planted now or later. We'll determine that in Final Compliance.
Topic: Utility Plans - Cover Sheet
Number: 237 Created: 6/6/2008
[6/6/08] The index shows that a plat has been included for reference only but was not. Please
remove from the index or add the plat (preferred). Thanks.
Topic: Utility Plans - General
Number: 20 Created: 10/30/2007
[6/6/08] Repeat, the utility plans are still labeling the row as 30'.
[5/5108] Repeat comment. There is an existing 60' row and the plat is only showing 30'. The
utility plans are still showing the row dedication incorrectly.
[3/17/08] The plat is showing the dedication incorrectly. Need to label how the existing row
was dedicated (book, page) and then label the additional 12' to be dedicated by this plat. The
utility plans are still showing a 20' dedication.
[10/30/07] Laporte is a 2 lane arterial according to the Master Street Plan. A total of 84' of row
plus a 15' UE is required. There is an existing 60' so this development is responsible for
dedicating an additional 12' of row plus the 15' UE. Currently the plat is showing an additional
20' of row dedicated on your side of the centerline.
Number: 93 Created: 11 /2/2007
[6/6/08] [5/5/08] [3/19/08] [11/2/07] See redlines for other comments.
Number: 207 Created: 5/12/2008
[6/6/08] I'll send you an example of how to write this so that it requires only one sentence yet
hits all the points listed below. We can work this out in FC.
[5/12/08] All variances must be listed under line 48 of the general notes stating the section of
LCUASS, what it requires and the variance granted. Formal variance requests prepared by a
licensed engineer in accordance with 1.9.4 may or may not be required depending on the
Page 6
Steve Olt - San ctuaryWestPDP.RevisionF"ommentLetter.doc Page 5
6. Out O, Private Drive - 20' minimum width required in order for these to be legal lots.
7. Laporte's row is still shown incorrectly on the utility plans (just a labeling issue at this
point).
8. Inlets are shown within the radii on Tavelli. I've discussed this with Tracy Dyer, the
inspector, and he would prefer that no inlets be set in a curve as it's very difficult to
construct. Please take a look at it and see what you can do to move both. A variance
may be considered for the exterior curbline if there are no other options but the inside radii
is just too tight and the inlet will have to be moved.
9. The variance to minimum cover requirements was granted for the one section of pipe
across Barton with the condition that the street be concrete for that one block, PC to PC.
10. There is a shed(?) shown within the proposed 9' LIE on the west side of Briarwood. This
will need to be removed along with the two other structures shown within the Briarwood
row. Is the property owner aware that all 3 structures must be removed? Please label the
utility plan sheets as "existing shed (building, etc) to be removed".
11. Missing the "actual" PT to PC dimensions on the street widening details... the standard
was called out on Tavelli/Kruse and missing one completely on the Barton/Eyestone detail.
Topic: Offsite Easements
Number: 160 Created: 3/20/2008
[6/6108] This is still an issue and needs to be resolved prior to hearing.
[5/5/08] Barton row needs to be dedicated all the way to the existing property line so that a
separate tract of land isn't dividing the row and Sanctuary West. Conversations with Vignette
indicated that the school district was going to dedicate this area to the development to be
owned and maintained by this development. Either solution is fine, the plans just need to reflect
the option you are going with and all appropriate letters of intent received prior to scheduling the
hearing.
[3/20/08] Offsite row, slope & utility easements are required for Barton through the school
property. Offsite slope easements may be required for the Webb Ave street stub depending on
where the 4:1 slope ends. Offsite slope and utility easements are required to complete the
Briarwood connection to Laporte. An offsite access easement will be required for the sidewalk
through the small lot on the north side of the large detention pond. In order to go to hearing,
only letters of intent from the affected property owner is required. The actual easement itself
will be required during FC and prior to plan approval.
Topic: Plat
Number: 29 Created: 10/30/2007
[6/6/08] My fault here...I think we were getting our lines crossed. The tracts are owned and
maintained by the HOA, while the easements are dedicated to the city.
[5/5/08] Repeat. The tract table is still incorrect.
[3/17/08] Drainage, utility, access, pedestrian access and emergency access easements are
dedicated to the city, not the HOA. Tract D needs an access easement. Need to define what
a public park easement is.
[10/30/07] Provide a tract table which states who owns and maintains each tract.
Number: 235
Page 5
Created: 6/6/2008
If -Steve -Olt - SanctuaryWestPDP.Revisions- ' ommentl-etter.doc Page 4
Number: 85 Created: 10/31 /2007
[6/6/08] [5/5/08] [3/19/08] [10/31/07] Site/Landscape/Utility/Plat - Please review comments
under all topics and coordinate the plan sets so that all plan sets present the same information.
Number: 208
Created: 5/12/2008
[6/6/08] Need a letter of intent from the property owner to the east of Briarwood where the
retaining wall is going in.
[5/12/08] All letters of intents from affected property owners offsite are required in order to
schedule a hearing.
Number: 213 Created: 5/14/2008
[6/6/08] Just carrying this through until FC.
[5/14/08] The sidewalk in Outlot E is terminated prior to the property line. This development
will be responsible for escrowing the remaining dollars needed to complete the sidewalk to the
property line so that when the neighboring property develops, they will have the money to tie
into it. An estimate will be required in Final Compliance for our review and approval. The
agreed upon figure will be put into the DA and paid prior to the issuance of the first building
permit.
Number: 234 Created: 6/6/2008
[6/6/08] Is the park land being dedicated to the city or is this a neighborhood park?
Topic: Hearing
Number: 250 Created: 6/6/2008
[616/08] In order to schedule the public hearing, the following comments must be addressed
and a paper round provided to both Transportation Planning and Engineering for their review:
1. The strip of land on the east side of Barton owned by the school district will be difficult for
them to maintain. Have they considered this? Would they prefer to sell this property to
this development?
2. Webb Avenue is platted as a 51' row but the utility plan typical street section is showing
53' cross section. The utility plans have designed it as a 51' road - please correct and
make all the sheets in all plan sets match. Must build to standard to the south PCs
including the sidewalks (this part, and this part only can wait til Final Compliance).
3. Offsite grading shown on the northwest side of the property. If there is an existing
drainage easement, then this is ok (please show and label as such). If there is not, than a
letter of intent from the effected property owner is required prior to scheduling the hearing.
An actual grading or slope easement will be required in FC.
4. A retaining wall is shown on the southeast corner of Briarwood and Barton. Our standards
require that the wall be set back a minimum of 2' behind the row and it can not be placed
in public row. This would push the wall back into another property and we would require a
letter of intent prior to hearing and a slope easement in FC.
5. Lot 1, east end of Kruse needs a 5' access easement behind the interim curb, gutter and
sidewalk to allow for the future removal and reconstruction for the ultimate design.
Page 4
f Steve Olt - SanctuaryWestPDP.Revisionf-'ommentLettecdoc Page 3
Private Conditions, Covenants, and Restrictions (CC&R's), or any other private restrictive
covenant imposed on landowners within the development, may not be created or enforced
which has the effect of prohibiting or limiting the installation of xeriscape landscaping,
solar/photo-voltaic collectors (if mounted flush upon any established roof line), clothes lines (if
located in back yards), odor -controlled compost bins, or which has the effect of requiring that a
portion of any individual lot be planted in turf grass.
Topic: Utility Plans - Grading
Number: 138 Created: 3/19/2008
[6/4/08]
[5/9/08] Not shown on Grading Plan drawings.
[3/19/08] The wetlands have to be shown in their entirety in each location. Additional fieldwork
is needed to inspect the wetlands boundary. Please contact Dana Leavitt after the wetlands
has been delineated in the field to coordinate the field visit. See the redline notes on the Site
Plan and the Grading Plan.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 21 Created: 10/30/2007
[6/6/08] Thank you for sending the PDF.
[515/08] 1 did not receive the County's design with this submittal.
[3/17/08] Repeat comment and update. The county is doing some widening improvements to
Laporte that you may be able to coordinate your project with. Please contact Kyle Arnt(sp?)
with the County to see where his project is starting to the east of you. You will need to tie into
his plans (please submit a copy of his design so that we can see that yours ties in) and you
might even be able to give him the money to build your portion of the improvements if it's not
too late. If you can still do that, we will need some sort of letter from Kyle indicating that you
have done so. If the county can't include your frontage with their project, then you will need to
construct the improvements with this development. We (the city) will be taking cash in lieu of
constructing the ultimate street connections for Barton and Briarwood where this development
leaves off in the interim.
[10/30/07] Per Conceptual Review, this development is responsible for improving Laporte to 36'
(2-12' travel lanes and 2-6' bike lanes) in the interim to Taft Hill. A preliminary design (including
500' of offsite design) is due prior to going to hearing. Keep in mind minimum cover
requirements over any structure. The final design will be due in Final Compliance.
Number: 51 Created: 10/30/2007
[6/6/08] Lot 1 may now have a building permit provided that an additional 5' access easement
is provided behind the interim sidewalk, ramp, c&g so that it can be removed in the ultimate. An
estimate for the removal and reconstruction of the ultimate will be required at Final prior to
signing mylars.
[5/5/08] Just carrying this through to final so that I don't forget.
[3/19/08] Building permits can now be issued for the lots on the north side of the street
because the street frontage will be complete. Lot 1 on the south side does not have a complete
street frontage so no building permit can be issued for that one.
[10/30/07] No building permit for Lots 1, 2 and 1 at the east end of Kruse will be issued until the
street frontage along those lots are complete. A note on the Site and Utility Plans indicating
this is required and it will also be stated in the Development Agreement. (Could adjust the
turnaround to get 2 more lots and just restrict Lot 1, Blockl ).
Page 3
"Steve Olt - SanctuaryWestPDP.Revision s""ommentLetter.doc Page 2
Stormwater / Shane Boyle:
a. His outstanding concerns can be addressed at Final Plan review. The project is ready for
public hearing.
Environmental Planner / Dana Leavitt:
His outstanding concerns can be addressed at Final Plan review. The project is ready for
public hearing.
Poudre Fire Authority / Carie Dann:
PFA and GIS are OK with the street names. The project is ready for public hearing.
Transportation Planning / Denise Weston:
a. The potential for a 2nd crosswalk on LaPorte Avenue is still being worked on. It would be
in front of the Calvary Baptist Temple. The project is ready for public hearing and the
crosswalk issue can be resolved at Final Plan review.
Department: Current Planning
Topic: General
Number: 147
Issue Contact: Dana Leavitt
Created: 3/19/2008
[6/4/08]
[5/9/08] Will be determined during final plan review.
[3/19/08] A Limit of Development line shall be determined and shown on the following plan
drawings:
Site
Landscape
Erosion Control
Grading
Topic: Landscape Plans
Number: 146
[6/4/08]
Created: 3/19/2008
[5/9/08] Will be addressed during final review.
[3/19/08] Water tolerant plants are needed in the drainage basins. A meeting with Dana
Leavitt will be beneficial to determine the extent of additional plantings.
Topic: Plat
Number: 170 Created: 3/21 /2008
[6/4/08]
[5/9/08] Show on plat by final review.
[3/21/08] In order to promote compliance with Sections 12-120, 12-121 and 12-122 of the City
Code related to Resource Conservation, a note must be placed on the Project Development
Plan (PDP) site plan and the Plat alerting future Homeowner's Associations of private
property owner rights to use resource saving devices or techniques under certain conditions.
The note shall read:
Page 2
Steve Olt - Sanctuar VW6EtPDP.Revisions'"'ommentLetter.doc Page 1
gal STAFF PROJECT REVIEW
City of Fort Collins
Vignette Studios Date: 6/9/2008
Go Terence Hoaglund
144 N. Mason St, #2
Fort Collins, CO 80524
Staff has reviewed your submittal for SANCTUARY WEST, PDP - TYPE 1, and we offer the
following comments:
ISSUES:
Department: Current Planning
Topic: General
Issue Contact: Steve Olt
Number: 17 Created: 10/30/2007
[6/3/08] Just as reminder, this has been verified. Street names OK.
[5/12/08] Current Planning will be checking with Tim to verify that the school street names are
OK and that no conflicts exist.
(10/30/07] Tim Varrone of the Geographical Information Systems Department indicated that all
of the proposed new street names have been verified and reserved in the Larimer County
Street database.
Number: 189
Created: 5/7/2008
[6/3/08] Just want to discuss on 6/4.
[5/7/08] Why is Outlot C, the narrow 11' wide strip along the south side of Barton Drive at
Briarwood Road, being included as part of the public park? Can it not just be a utility easement?
Number: 225 Created: 6/5/2008
[6/5/08] Bonnie Ham of the U.S. Postal Service has indicated that a mailbox location and
purchase has been agreed upon.
Number: 226 Created: 6/5/2008
[6/5/08] The following comments and concerns were expressed at staff review on June 4,
2008:
Light & Power / Rob Irish:
a. No further comments. The project is ready for public hearing.
Water & Wastewater / Roger Buffington:
a. No further comments. There are a few clean-up items that can be addressed at Final Plan
review. The project is ready for public hearing.
Stormwater / Wes Lamarque:
a. There is a question about the retention / detention ponds that can be addressed at Final
Plan review. The project is ready for public hearing.