HomeMy WebLinkAboutSANCTUARY WEST - FDP - FDP110004 (FORMERLY 30-07A) - CORRESPONDENCE - LEGAL DOCUMENTScomputer modeling and so on. So we said "NO! Approve what we have now." Then
Stormwater offered a "Plan B" where 4 to 5 lots would become part of the channel. Again, the
answer was "No! Get us approved and we'll consider it later!" Then Plan C was introduced ---
Build the Ultimate Channel NOW! Solitaire said emphatically "No! If you want us to make
changes at this late date to our engineering & site plans, we just aren't interested. We need to
get approved as is. In order to interest others or Solitaire in building the Ultimate Plan, you
will need to provide some incentives. The easiest is to rebate fees or credit the extra costs
against City fees." Other suggestions were offered also.
Those suggestions are still on the table for discussion. It seems that Section 26-545. Credit for
Construction of Major Basin Improvements, would apply here. Solitaire will supply the City
with Bids from 3 Contractors showing the incremental cost differential for building the
Ultimate Plan now versus building the Interim Plan now. This paragraph could be added to
the DA, Solitaire could sign it, and the Final approvals could be recorded.
If this seems like a logical direction then all the back-up correspondence & arguments can be
held in abeyance ... and hopefully forgotten.
Thanks for you consideration, Lori. If you decide you want more detailed correspondence, I
will be more than willing to get the documents to you.
William B. Veio, Manager
SOLITAIRE HOMES, LLC
0:303-721-9054 C:303-548-4540
E: isolitaire@comcast.net
I?MRI 1?L_/ V
4 A Rocky Mountain Research Institute subsidiary
" The channel was designed to convey the Ultimate Condition 100-year flood flows, and maintain the
required water quality ponds with minimal modifications to the Interim condition ponds. It should be
noted that all future channel improvements will be made by others, not by Solitaire Homes,
LLC. The future channel shown in Figure 4.1 would include: .
• A trapezoidal channel with a 30 foot wide base and 4H:1V side slopes, extending
approximately 310 feet from Laporte Avenue north through the Southern pond 0901) to
Barton Drive.
• Three loft wide by 4 ft high box culverts under Barton Drive
• A trapezoidal channel with a 25 to 35 foot wide base and 4H:1V side slopes extending 750
feet from Barton Drive north through to the intersection of Cherry Street and the NMD.
• Water quality ponds for Sanctuary West would still need to be constructed, as shown on the
reference drawings."
The Stormwater staff asked Solitaire & URS on numerous Comment Reviews and in meetings
to change many aspects, calculations, add wording & notices, computer modeling to both the
Interim and Ultimate channel design. But NEVER did Staff question the above statements or
ask us to correct the paragraph or to eliminate it. It was because we were all working to the
same goal: prove the Interim and Ultimate channel conditions can work safely and efficiently.
Had there been a misunderstanding about who would be doing the Ultimate channel
improvements, this would have been the place to say something to us. Nothing was said that
Solitaire would be making the Box Culvert improvements which are obviously only required
when the Ultimate channel condition is built.
History of Stormwater's Comments about Developing the Property
Since we first became involved in the Property in 2003 there have been many different
positions and statements made by the Stormwater Division about developing and even NOT
developing the Property. Statements range from the Division buying the channel or an
easement, to purchasing easements from Solitaire to expand the width of the Hollywood -Irish
channels (East-West, and North -South). There were times when we were told the property is
not right to be developed now AFTER we had invested a year and a half in time and money
doing engineering for the Property AFTER being told it was developable in Concept Review.
More recently in 2011, the Interim channel design had completed all engineering and was
ready for mylars, when Stormwater asked us to alter our design,& omit the two detention
pond retaining walls. Solitaire did not want more delays with changes & revisions, new
RMR1 FEALTY
3 A Rocky Mountain Research Institute subsidiary
of the pipe penetration and the use of rip -rap. A draft of the Agreement approved at the next
Ditch Company Board meeting will be sent to Solitaire. The Agreement will meet the
conditions the City has requested in the DA.
Why we were surprised to see the DA contained a clause requiring Solitaire to escrow
$341,000 to $500,000 for a future stormwater improvement that we were not responsible for
building.
Throughout the engineering drawings, drainage and flood control reports were the words
'Built by Others' and "Future Box Culvert" to identify that such improvements were part of
the Ultimate Channel and not a part of the Interim plan as indicated in the drawings and
drainage studies. As a condition of developing the site, the Stormwater Division asked us to
design the Ultimate Channel and improvements which would be 'Built by Others" at some
future time period, and prove that such a design would work. The design and proof was
conducted by URS-civil engineers, the same consultants who authored the West Vine Basin
Stormwater Plan and 3 other Basin studies for the City.. In fact, the Final Plans, Utility Plans,
Site Plans, engineering & floodway modelings demonstate, that the Interim Plan for the
Subdivision can contain TWICE the 100-Year storm event without the future stormwater
improvements. Everyone working on the study acknowledged that the design and
engineering tasks were two -fold:
* The Interim Plan. Design the Sanctuary West Subdivision and prove that it will be
able to contain TWICE the 100-Year storm flows, and meet all the City requirements for a Final
Plat, including releasing water at or below historic rates into the New Mercer Canal.
* The Ultimate Plan. Design the future stormwater channel through the Sanctuary
West Subdivision, so that it will be able to connect the Southern Flow path with the Central
Flow.path, and release water at or below historic rates into the New Mercer Canal. (In order to
accomplish this Solitaire Homes must deed, allow, sell, or convey a wide enough parcel of land
through its Subdivision to accommodate a channel that will extend from Laporte Avenue north
across Barton Drive and north to connect with the east -west Hollywood -Irish channel and then
extend north into the north -south channel to meet the Central Flow path. It may take decades
before this Ultimate Plan will be constructed. Therefore, this is the explanation why the
Ultimate Channel is "to be built by Others" and not by Solitaire Homes.
The Sanctuary West Floodplain Modeling Report prepared by URS (August 2008 & in subsequent
revisions) states clearly in Section 4.1 Ultimate Condition Conceptual Design that
RMRl 1?L_/ k
2 A Rocky Mountain Research Institute subsidiary
`RMRI►
REALTY BUS: 303-721-9054
6645 E. Heritage Ploce S., Englewood Co. 80111 FAX: 303-727-0245
A Rocky Mountoin Research Institute subsidiary CELL: 303-548-4540
February 29, 2012
Lori Kadrich E: lkadrich@fcgov.com
Director of Planning & Environmental Services Pages: 4
City of Ft. Collins
281 N. College Avenue
P.O. Box 580
Ft. Collins, CO 80522-0580
RE: SANCTUARY WEST DEVELOPMENT AGREEMENT ---REQUEST FOR
CONSIDERATION TO MODIFY AGREEMENT & EXECUTE IT
Solitaire Homes was informed by your office on January 12, 2012 that the Preliminary
Development Plan(PDP) had expired for the proposed Sanctuary West Subdivision, due to
failure to submit a signed Development Agreement (DA), despite having submitted signed
mylars for the Utility Plans, Plat, Site and Landscape Plans to the City and having met all the
design and engineering criteria for Final Plat approval. Solitaire Homes (Solitaire) found two
paragraphs in question: one with the New Mercer Ditch Company and the other with the
requirement to escrow $341,000 to $500,000 for a Box Culvert that was not necessary to meet
the handling of future flood flows on the Property. These exceptions were pointed out in an
email response to Sherrie Langenberger on the eve of January 10, 2012. The first draft of the
DA was received by Solitaire around noon on January 10, 2012 with three subsequent revisions
being sent until 4:50 pm that day, making it impossible to review the document, amend it, or to
sign it that day.
Solitaire requested draft copies of the Development Agreement in April 2011 when we were
ready to submit for mylars, and had filled out the City form for the Development Agreement.
Inquires were made throughout the summer and fall and as late as December 2011 for a draft.
The City had months to at least get a draft to us. The City couldn't meet our reasonable
request, yet has allowed the development PDP to expire because we couldn't get the DA back
to them, reviewed, approved, and executed on the same day within a few minutes of receiving
the last revision.
Resolution of the New Mercer Ditch Company DA Paragraph
Since then Solitaire has met with Ditch Company officers and representatives on three
occasions to clarify the Ditch Company paragraph in the DA. The meeting on February 20
included a review of the Final Plans, access easement clarification, suggestions on installation
Land Development • Product Feasibility • On-Sitq Marketing • Investments