Number: 187 Created: 5/6/2008
[9/26/08]
[6/3/08] Repeat comment. It is critical to have these large mains shown correctly at the two
proposed connection locations.
[5/6/08] Check existing utilities in LaPorte Avenue. There are two 27-inch mains in a
portion of the street.
Number: 227 Created: 6/6/2008
[9/26/08] Move this connection to Irish Drive - - - and include the cross-section detail across
the channel.
[6/6/08] Add a detail (profile) of the of the water main connecting to the existing main on
the north side of the existing channel near Webb Avenue.
Number: 228 Created: 6/6/2008
[9/26/08]
[6/6/08] The water service for 2216 LaPorte (actually fronts on Briarwood) currently
connects to the 27-inch main to the west which will be abandoned. This service will need to
be reconnected to the new main in Briarwood. How will service to this property be provided
throughout construction?
Number: 268 Created: 9/26/2008
[9/26/08] During the internal meetings at Water Utilities regarding the existing 27-inch
water main, a new option was identified that will take a few days to check out. More
information will follow soon.
Number: 329 Created: 10/30/2008
[10/30/08] See red -lined plans for other comments.
This completes staff (and outside reviewing agencies) review and comments at this time.
Red -lined plan from City departments are included with this comment letter. Additional
comments and red -lined plans may be forthcoming. Another round of staff review is
necessary. Be sure and return all red -lined plans when you re -submit. The number of copies
of each document to re -submit is shown on the attached REVISION ROUTING SHEET.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at 221-6341.
Yours Truly,
* edk'*�
Steve Olt
City Planner
Page 15
4
Number: 270 Created: 9/29/2008
[9/29/08] Please revise grading on sheet 25 per red -lines. Drainage from the back of lots
needs to be directed towards the inlets. This needs to be clearly shown on the plans with
detailed grading.
Number: 271 Created: 9/29/2008
[9/29/08] Please add proposed contours to the legend. Line types were not included.
Number: 272 Created: 9/29/2008
[9/29/08] Please label all storm sewers public or private on the Utility Plan sheets. Also,
please add a note on the storm sewer plan and profile sheets that all public storm sewers are
to be inspected by the City.
Number: 273 Created: 9/29/2008
[9/29/08] Pease differentiate between outfall, infall, vertical, and flush curb and gutter on the
grading plans and provide a legend.
Number: 274 Created: 9/29/2008
[9/29/08] What does storm water profile 20 reference.
Number: 275 Created: 9/29/2008
[9/29/08] Please add all of the storm water details in the plan set that are being proposed
with this project. See redlined sheet 67.
Number: 276 Created: 9/30/2008
[9/30/08] The north -south retention pond does not have a positive slope to the outfall pipe.
A slope is needed so this pond can drain after the gate valve is opened. The bottom could
have as little slope as .5% with a pan.
Number: 277 Created: 9/30/2008
[9/30/08] Please provide 10 feet of separation between storm sewers, inlets and canopy trees.
See red -lines for specific locations.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Water/Wastewater
Number: 185 Created: 5/6/2008
[9/26/08]
[6/3/08]
[5/6/08] At final there is a great, great amount of detail to be added such as: Profile of 16-
inch water main; Details on connections to and abandonment of the 27-inch water main;
Labels on all valves, fittings, hydrants, etc; Lengths on all pipes between valves, fittings,
manholes, etc; Show/label all crossings on pipeline profiles; Etc; Etc.
Page 14
I. a
5. Please revise the Ultimate Conditions hydraulic model to incorporate the bend between
Section 0 and Section 100. Also, please define the channel bends and culvert skew at
the Barton Street crossing in the model. This will be necessary to determine if super
elevation and/or bank stabilization will be required when the channel is constructed.
6. Section 4.4 of the Major Drainage Report states Ponds 901 and 902 are not connected to
the rest of the system due to the fact they are retention ponds. However, Pond 901 is
show draining to Node 875 and eventually into the Southern Flow Path in Figure 4.2.
In addition, Table 4.6 shows a peak discharge of 539 cfs that is reportedly being
released into the ditch. Please verify the routing of Pond 901 and revise the report as
necessary.
7. With this submittal, there is a pipe shown under Briarwood Road in the Utility Plans.
This pipe is not incorporated into the hydraulic modeling. If the pipe is needed, please
revise the hydraulic model to incorporate the standard bridge and weir approach.
Number: 264 Created: 9/26/2008
[9/26/08] The south water quality pond is proposed within a wetland and will have problems
with ground water. The pond will fill full of water and flow down to the retention pond
where there is no outfall. This will cause both the water quality pond and the north -south
retention pond to fill with 3 feet or more of water. The pond can not hold water for more
than 72 hours, so this is a problem and needs to be resolved.
Number: 265 Created: 9/26/2008
[9/26/08] The north -south retention pond will not be able to drain out the outfall pipe with
the invert at the ditch bottom. There will be a normal water surface elevation during
irrigation season and the depth of this flow will also not be able to drain out of the pond. In
looking at the proposed grades, it seems the only solution would be a pumping system at this
location. Further coordination needs to take place with the City to determine a solution. If
the outlet invert is at the normal water surface elevation, and this is not the ditch bottom, than
this is no longer an issue.
Number: 266 Created: 9/26/2008
[9/26/08] Please revise the final grading plans by removing the overlot grading contours that
will be changed with the final grading. Please darken the overlot grading contours that will
remain unchanged. This will make these plans easier to read. Also please lighten the
existing contour labeling, they are black when the contours are grey.
Number: 267 Created: 9/26/2008
[9/26/08] Some of the drainage plan sheets are missing basin boundaries. Please revise.
Number: 269 Created: 9/29/2008
[9/29/08] Please revise contours and spot elevations on sheet 22 per redlines. Drainage can
not flow as arrows indicate.
Page 13
Number: 116 Created: 11 / 15/2007
[ 10/21 /08]
[11/15/07] Based on possible conditions near the east project site access, please provide an
accident analysis/forecast for the short term period.
Number: 181 Created: 3/24/2008
[10/21/08]
[3/24/08] The WBL turn striping on approach to Impala Dr seems to be made of multiple
dual yellow lines. Please revise.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Floodplain
Number: 262 Created: 9/24/2008
[9/24/08]
1. The Sanctuary West Floodplain Modeling Report must be signed, stamped, and dated
by a registered Professional Engineer (P.E.) licensed to practice in the state of Colorado.
2. Some WSELs from the floodway analyses indicate a 0.6-ft rise, which exceeds the 0.5-
ft floodway requirement. Please revise the floodway analysis to reflect 0.5 ft of rise,
and modify all documents as necessary.
3. All proposed modifications within the floodway must be accompanied by a No -Rise
Certification that is signed, stamped, and dated by a registered P.E. licensed to practice
in the State of Colorado (repeat comment).
4. Please combine all simulations into 1 single Project file in HEC-RAS. This will allow
all simulations to be compared against each other within the same project.
5. Please add the overall floodplain map from Sheet 70 of 70 in the construction plans to
the map pocket of the drainage report.
6. Please add the off-line calculations for the discharge from the existing hexagonal
culvert to the Floodplain Modeling Report.
Topic: Stormwater
Number: 261 Created: 9/24/2008
[9/24/08] Stormwater Master Planning Comments:
1. The detail provided for the riser at the existing hexagonal culvert does not show the
manually operated gate. Also, with all openings in the front of the riser section blocked
by plates in the interim condition, it is unclear how the pond will be drained when the
gate is opened. Please revise the detail to include the manually operated gate and show
how the pond will drain.
2. The Major Drainage Report prepared by URS indicates the riser section will be 5.1'
high. However, the detail provided in the Utility Plans shows a height of 4.9'. Please
verify and revise as necessary.
3. Please provide design and details for the ultimate condition water quality ponds and
outlet structures (repeat comment).
4. On the Utility Plans, the ultimate drainage channel is shown to terminate at the northern
property boundary. Please show this swale with a bend to the east to match the
hydraulic modeling submitted by URS so the location and size of the ultimate water
quality pond can be verified.
Page 12
Topic: Utility Plans - Utility Sheet
Number: 285 Created: 10/8/2008
[10/8/08] Please provide utilities from Barton Drive through Webb Ave to the property line
or at least past the ultimate road improvements so that the property to the south can tie in
without cutting into the street. If the utilities are not provided to the property line, an
estimate for their construction is required for our review and approval.
Number: 302 Created: 10/8/2008
[10/8/08] Sheet 32 -see red -lines.
Number: 303 Created: 10/8/2008
[10/8/08] Sheet 34 - Kruse Drive utilities (sanitary, water, electric, gas, etc) needs to be
stubbed to the property line.
Number: 304 Created: 10/8/2008
[10/8/08] Sheet 35 - the existing 27" waterline shown to be abandoned in the street must be
abandoned outside of the public row and utility easement.
Topic: Utility Plans - Water Profiles
Number: 313 Created: 10/10/2008
[10/10/08] See comment 312.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 278 Created: 10/2/2008
[10/2/08] PFA has no additional comments or concerns at this time.
Department: Traffic Operations Issue Contact: Ward Stanford
Topic: General
Number: 327 Created: 10/21 /2008
[10/21/08] No Utility Plans received. Please provide with next submittal.
Number: 328 Created: 10/21 /2008
[10/21/08] A TIS is indicated as being submitted with this round of review (9/24). I did not
receive the TIS. Please provide with next submittal.
Topic: Traffic
Number: 114 Created: 11 / 15/2007
[10/21/08]
[5/12/08] The East bound left turn lane on LaPorte is a LCUASS policy that all arterials will
provide left turn pockets at accesses. You will need to request a variance to this standard with
justification as to why this development should not need to meet this policy.
[11/15/07] Per Figure 8-1 of the LCUASS, this project will need to provide an east bound
left turn lane at its west access. It may be negotiable to forego the left turn lane in favor of a
reversible lane east of your west access to provide a 2 stage left turn capability from the west
access for your residents trying to turn onto east bound LaPorte during the AM rush hour.
Page 11
Number: 287 Created: 10/8/2008
[10/8/08] Please provide intersection spot details in accordance with Figure 7-27 and 7-28.
Number: 296 Created: 10/8/2008
[10/8/08] There were several items not shown on the plan and profile sheets. Page 5 of the
checklist, section IV, paragraph R is missing:
Water lines and appurtenances
Electric lines and appurtenances
SS lines appurtenances
Telephone lines and appurtenances
CATV lines and appurtenances
Gas lines and appurtenances
Number: 305 Created: 10/10/2008
[10/10/08] All concrete sections of the street must be constructed by block, from PC to PC.
In other words, all of Briarwood must be constructed in concrete and Barton from Tavelli to
the east side of Briarwood must be constructed in concrete (to the PC, see redlines).
Number: 306 Created: 10/10/2008
[10/10/08] Station all driveway intersections in both plan and profile views. If you don't
want to station both sides of the driveways, you station one side only and put a typical
driveway intersection detail on each sheet of the P&Ps showing the one side stationed and
dimension out the typical width of the driveway. That way you would only have to station
both sides of atypical driveways.
Number: 307 Created: 10/10/2008
[10/10/08] I'm not calc'ing out a 2% cross slope from the lip of gutter to the CL. Please
check them and call out the cross slopes at each of the cross sections called out with spots.
Please call them out to at least one decimal place.
Number: 309 Created: 10/10/2008
[10/10/08] Please provide an ultimate design for Kruse Drive to the end of the property line.
Please provide an estimate for the removal of the temporary turnaround and landscaping and
construction of the ultimate Kruse Drive to the property line for our review and approval.
See comment 51 for the history of this comment.
Number: 320 Created: 10/10/2008
[10/10/08] Kruse Drive interim temp turnaround - please station/define the limits of the full
street improvements and where the limits of the temp turnaround construction are.
Topic: Utility Plans - Storm Profiles
Number: 312 Created: 10/10/2008
[10/10/08] Please provide a detail (label if where its shown if on another sheet) for all
encasements, lowerings, etc on the water and sewer plan and profile sheets.
Page 10
Number: 299 Created: 10/8/2008
[10/8/08] Sheet 23 is showing a duplicated line for the property that juts into the detention
pond. See red -lines.
Number: 300 Created: 10/8/2008
[10/8/08] Sheet 23 - spot elevations for the lot corners are "off' just a little bit ... not on the
corner itself.
Number: 301 Created: 10/8/2008
[10/8/08] Sheet 24 - see red -lines.
Topic: Utility Plans - Plan & Profiles
Number: 72 Created: 10/30/2007
[10/8/08] Please provide a concrete joint detail for all streets constructed out with concrete.
[6/6/08] Just carrying this item through until FC. Street standards require that the concrete
section be done from PC to PC by street block.
[5/5/08] [3/19/08] Most of the cover issues have been taken care of with the exception of
two places. You may construct a 30' concrete section over Storm 5 per Rick Richter in
Pavement Management. A joint detail will be required in FC for that section. Storm 5A is
acceptable provided that a note is placed on the plan and profile sheet stating that Storm 5A
is to be placed behind the curb.
[10/30/07] Minimum cover requirements are not being met. See LCUASS 12.2.2 for
minimum depth requirements (2' below subgrade or 3' to finish). This applies to all utilities
and any structure (box culvert or otherwise).
Number: 214 Created: 5/14/2008
[9/25/08] Please label the curb and gutter type on the plan view.
[6/6/08] FC
[5/14/08] Please label the curb and gutter type on the plan view as well so that it is very clear
which type of curb is being installed and where.
Number: 221 Created: 5/ 14/2008
[10/8/08] [6/6/08] [5/14/08] Webb Ave - please station the end of construction in both the
plan and profile views.
Number: 246 Created: 6/6/2008
[10/8/08] Please design and construct Webb Ave in accordance with Figure 16-2 and 1606a.
[6/6/08] Design and build the Webb Avenue stub -out to standard (sidewalks must be
constructed to the PCs and add barricades).
Number: 248 Created: 6/6/2008
[10/8/08] Please add in the future 9' UE and show, label in both the plan view and the typical
section.
[9/25/08] [6/6/08] This development is responsible for designing the full street section for
Briarwood. Please show sidewalks on the east side but label as "future".
Page 9
Number: 292 Created: 10/8/2008
[10/8/08] The match lines do not match up, each sheet. There is a space missing between
the two from sheet to sheet.
Number: 310 Created: 10/10/2008
[10/10/08] Need to station the end of the ultimate sidewalks and beginning of asphalt paths
at Barton and Briarwood and clearly show that is happening on each sheet. Most sheets
show a continuous sidewalk with out any kind of labeling or line weight showing that
something is happening.
Number: 311 Created: 10/ 10/2008
[10/10/08] Please make sure that street names are called out on each sheet.
Topic: Utility Plans -Grading
Number: 64 Created: 10/30/2007
[10/8/08] Missing a few.
[6/6/08] [5/5/08] [3/19/08] [10/30/07] Label all slope ratios.
Number: 243 Created: 6/6/2008
[9/25/08] Please provide a detail for all walls greater than 3' from the bottom of the footer.
[6/6/08] Label all retaining walls with tow, bow.
Number: 244 Created: 6/6/2008
[10/8/08] The horizontal control sheet shows what appears to be a retaining wall in the
southeast corner of Briar -wood and Barton Drive but it doesn't show up on the Final Grading
Sheet. It's hard to tell because the match lines are off and there is missing information. This
area is a little convoluted... not sure what information is being shown here. There seems to
be a section of sidewalk proposed with this project extending to the south - please remove.
[6/6/08] The retaining wall needs to be a minimum of T behind the sidewalk and cannot be
in public row. This will push the wall on the neighboring property and requires a letter of
intent prior to scheduling the public hearing.
Number: 295 Created: 10/8/2008
[10/8/08] Please provide finish grade elevations for all lot corners. I marked a few but did
not get them all.
Number: 297 Created: 10/8/2008
[10/8/08] Please provide spot elevations and slope info on the sidewalk connecting to Webb
Avenue.
Number: 298 Created: 10/8/2008
[10/8/08] Sheet 22 seems to have a layer turned off. The existing telephone pads are labeled
but not shown.
Page 8
change at the end of blocks but may not occur in the middle of a block. Missing a typical
section for Webb Avenue.
Number: 294 Created: 10/8/2008
[10/8/08] Please reference the updated or current soils investigation report and the
subsurface report.
Topic: Utility Plans - Detail Sheets
Number: 314 Created: 10/ 10/2008
[10/10/08] Please provide details 706, 707, 710, 1601, and 1602. Please remove 1606a and
1607a and replace them with our current 1606a and 1607.
Number: 315 Created: 10/ 10/2008
[10/10/08] Sheet 63 -Please add a label that the concrete trickle pan detail is to be "For
private improvements only. This detail is not to be used in public right-of-way."
Topic: Utility Plans - Erosion Control
Number: 293 Created: 10/8/2008
[10/8/08] Erosion control may be required at the end of the temp turnaround on Kruse Drive.
It appears that there will be a point discharge at the end of the curb and gutters.
Topic: Utility Plans - General
Number: 56 Created: 10/30/2007
[10/8/08] The existing ditch line weight needs to be added to the Legend.
[5/5/08] [3/19/08] Please label existing ditches as "to be removed" where ever applicable.
[10/30/07] There are a couple of small existing irrigation ditches shown but what are you
doing with them? Are you removing? Relocating? Something needs to be done as they
cross individual lots. Each and every affected ditch owner will require a signature block on
each sheet where their ditch is shown to be impacted.
Number: 93 Created: 11 /2/2007
[9/25/08] [6/6/08] [5/5/08] [3/19/08] [11/2/07] See red -lines for other comments.
Number: 251 Created: 6/6/2008
[10/8/08] [6/6/08] See red -lines for other comments.
Number: 286 Created: 10/8/2008
[10/8/08] The newly added culvert in Briarwood Drive needs to be extended to the east so
that it works for the ultimate. The flared end section needs to be placed outside of the future
V UE. Also, if the minimum T of cover over the pipe to subgrade is not met, that section of
the street will need to be in concrete, from PC to the end of the ultimate improvements.
Please provide all of the necessary design details as discussed in comment 72. This addition
to the plans will trigger the need for another off -site drainage easement.
Page 7
The exhibit for Alumbaugh is missing the Book and Page.
The dedication statement for Alumbaugh was not submitted with the City's standard
dedication language. Also, there are two properties on the west side of Briarwood..
This easement does not make it clear that both properties are dedicating this easement.
Perhaps a legal description is in order?
Topic: Plat
Number: 319 Created: 10/10/2008
[10/10/08] From Technical Services:
1. Boundary and legal close.
2. Missing Reception Numbers for easement along Briarwood Rd on plat, site and
landscape plans.
3. Minor scanning issues (line over text) on site plans.
4. See incorrect north arrows on utility plans.
Number: 322 Created: 10/10/2008
[10/10/08] The entire corner of Lot 1 at the end of Kruse Drive needs to be in an access
easement, not just the 5'. Also, please call out an access easement and not a temporary
construction easement.
Topic: Site Plan
Number: 318 Created: 10/10/2008
[10/10/08] See red -lines and coordinate with comments under other topics.
Number: 324 Created: 10/10/2008
[10/10/08] Please clearly label and identify concrete & interim asphalt improvements
(sidewalk, street) and all Type III barricades.
Topic: Technical Services
Number: 263 Created: 9/25/2008
1. Plat - Boundary and legal close.
2. Missing reception numbers for easement along Briarwood Rd on Plat, Site and
Landscape plans.
3. Minor scanning issues (line over text) on site plans).
4. See incorrect north arrows on utility plans.
Topic: Utility Plans - Cover Sheet
Number: 162 Created: 3/20/2008
[10/8/08] Please list the names of the streets under each typical section on the cover sheet.
Please remove "and drainage" in the easement labels so that it matches the plat. Please
correct this throughout the plan set.
[5/5/08] [3/20/08] Typical street sections need to be identified by street name as the sections
are not typical and change from street to street with the different curb types. Curb types can
Page 6
Number: 316 Created: 10/10/2008
[10/10/08] Please provide an estimate for the design and construction of Barton and
Briarwood to LaPorte from the point you are ending the ultimate improvements to the new
row for our review and approval.
Number: 326 Created: 10/16/2008
[10/16/08] Please provide an estimate for the design and construction of the future LaPorte
Street improvements along your frontage for our review and approval.
Topic: Landscape Plans
Number: 317 Created: 10/10/2008
[10/10/08] See red -lines and coordinate with comments under other topics.
Number: 323 Created: 10/10/2008
[10/10/08] Please clearly label and identify concrete & interim asphalt (sidewalk, street) and
all Type III barricades.
Topic: Offsite Easements
Number: 160 Created: 3/20/2008
[9/25/08] Keeping this open until the property is transferred from the school.
[6/6/08] This is still an issue and needs to be resolved prior to hearing.
[5/5/08] Barton row needs to be dedicated all the way to the existing property line so that a
separate tract of land isn't dividing the row and Sanctuary West. Conversations with
Vignette indicated that the school district was going to dedicate this area to the development
to be owned and maintained by this development. Either solution is fine, the plans just need
to reflect the option you are going with and all appropriate letters of intent received prior to
scheduling the hearing.
[3/20/08] Off -site row, slope & utility easements are required for Barton through the school
property. Off -site slope easements may be required for the Webb Ave street stub depending
on where the 4:1 slope ends. Off -site slope and utility easements are required to complete
the Briarwood connection to LaPorte. An off -site access easement will be required for the
sidewalk through the small lot on the north side of the large detention pond. In order to go to
hearing, only letters of intent from the affected property owner is required. The actual
easement itself will be required during FC and prior to plan approval.
Number: 308 Created: 10/10/2008
[10/10/08] The necessity for anew off -site easement has been generated by the addition of a
culvert in Briarwood Drive.
Number: 321 Created: 10/10/2008
[10/10/08] Easements 1, 2 and 3 were received (those surrounding Briarwood), however
there are some outstanding issues.
The exhibit for Vattano is missing the Book and Page.
The exhibit for Phillips is missing the Book and Page.
Page 5
[6/6/08] Lot 1 may now have a building permit provided that an additional 5' access
easement is provided behind the interim sidewalk, ramp, c&g so that it can be removed in the
ultimate. An estimate for the removal and reconstruction of the ultimate will be required at
Final prior to signing mylars.
[5/5/08] Just carrying this through to final so that I don't forget.
[3/19/08] Building permits can now be issued for the lots on the north side of the street
because the street frontage will be complete. Lot 1 on the south side does not have a
complete street frontage so no building permit can be issued for that one.
[10/30/07] No building permit for Lots 1, 2 and 1 at the east end of Kruse will be issued
until the street frontage along those lots are complete. A note on the Site and Utility Plans
indicating this is required and it will also be stated in the Development Agreement. (Could
adjust the turnaround to get 2 more lots and just restrict Lot 1, Blockl).
Number: 213 Created: 5/ 14/2008
[9/25/08] The utility plans do not match the site and landscape plans for this comment.
Please terminate the sidewalk perpendicular to the property line (you can't construct a
diagonal piece and add on to it successfully later).
[6/6/08] Just carrying this through until FC.
[5/14/08] The sidewalk in Outlot E is terminated prior to the property line. This
development will be responsible for escrowing the remaining dollars needed to complete the
sidewalk to the property line so that when the neighboring property develops, they will have
the money to tie into it. An estimate will be required in Final Compliance for our review and
approval. The agreed upon figure will be put into the DA and paid prior to the issuance of
the first building permit.
Number: 288 Created: 10/8/2008
[10/8/08] One mailbox along LaPorte is not being relocated like the others and you're
proposing an attached walk in that location. Is there a reason this mailbox can not be moved
back like the rest so that the sidewalk can remain detached?
Number: 289 Created: 10/8/2008
[10/8/08] The existing street stubs for Webb, Irish and Impala on the site and landscape
plans do not match the improvements shown on the utility plans. Please label what the
improvements are and provide construction information on the utility plans.
Number: 290 Created: 10/8/2008
[10/8/08] Please provide ramps for all T-Intersections in accordance with figure 16-2. A few
of the intersections show ramps that are not aligning with the ones across the street.
Number: 291 Created: 10/8/2008
[10/8/08] The future sidewalk connection from Tavelli to the west into the detention area is
in conflict with proposed culvert. Please design the placement of the culvert so that it
accommodates the future sidewalk connection.
Page 4
bins, or which has the effect of requiring that a portion of any individual lot be planted
in turf grass.
Number: 260 Created: 9/23/2008
[9/23/08] Change Canal Buffer to "Natural Area Buffer" in all locations on plat.
Topic: Site Plan
Number: 254 Created: 9/23/2008
[9/23/08] Proposed 20' maintenance easement for Mercer Ditch may be in conflict with
natural area buffer. Landscape plantings should have been added to the buffer to mitigate for
a much smaller buffer. A meeting to resolve conflict between uses is required with Dana
Leavitt.
Number: 255 Created: 9/23/2008
[9/23/08] Add 50' buffer line in Outlot B to reflect buffer for existing wetland.
Number: 256 Created: 9/23/2008
[9/23/08] Add note to Site Plan:
Refer to Section 3.2.1(E) of the Land Use Code for allowable uses within a buffer area.
Department: Current Planning Issue Contact: Steve Olt
Topic: Utilities
Number: 281 Created: 10/7/2008
[10/7/08] Don Kapperman of Comcast Cable TV indicated that they have no problems with
this development request.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 43 Created: 10/30/2007
[10/8/08] Please provide an estimate for the design and construction of Webb Avenue to the
property line for our review and approval. I will email you a template to use.
[10/30/07] This project is responsible for the design and construction of Webb Ave to the
property line plus 500' of offsite preliminary design. At minimum, Webb Ave must be
constructed to the PC's (including the ped ramps) and type III barricades must be provided.
If any portion of the road is not constructed (from the PCs to the PL), then this development
is required to escrow the cash necessary to complete the street. An estimate for our review
and approval will be required in FC and that number will go into the development agreement
to be paid prior to the first building permit. Also, need to watch whether the street is tipping
up or down because the drainage has to either stay on site or a drainage easement from the
offsite property owner will be required.
Number: 51 Created: 10/30/2007
[10/8/08] A temporary construction easement was dedicated in lieu of the access easement
requested below. Also, the utility plans do not match the plat. Lot 1 is shown in the utility
plans as terminating at the back of the turnaround while the plat shows it dedicated out into
the street.
Page 3
[3/19/08] A Limit of Development line shall be determined and shown on the following plan
drawings:
Site
Landscape
Erosion Control
Grading
Topic: Landscape Plans
Number: 146 Created: 3/19/2008
[9/23/08]
[6/4/08] Dryland seed mix as shown by graphic hatching, is not to be used in wetland
mitigation are.
[5/9/08] Will be addressed during final review.
[3/19/08] Water tolerant plants are needed in the drainage basins. A meeting with Dana
Leavitt will be beneficial to determine the extent of additional plantings.
Number: 257 Created: 9/23/2008
[9/23/08] Additional tree species are needed in areas next to wetland mitigation area. One
species is insufficient. Refer to red -lines on plan.
Number: 258 Created: 9/23/2008
[9/23/08] Refer to minor red -line comments on plans.
Number: 259 Created: 9/23/2008
[9/23/08] Wetland mitigation plan notes are to be added to the landscape plan per red -line
comments (sheet 9 of 11). Any questions contact Dana Leavitt.
Topic: Plat
Number: 170 Created: 3/21 /2008
[9/23/08] Add wording per red -line to plat and site plan to note on energy conservation.
Previous reviewer's comment was not specific enough.
[6/4/08]
[5/9/08] Show on plat by final review.
[3/21/08] In order to promote compliance with Sections 12-120, 12-121 and 12-122 of the
City Code related to Resource Conservation, a note must be placed on the Project
Development Plan (PDP) site plan and the Plat alerting future Homeowner's Associations of
private property owner rights to use resource saving devices or techniques under certain
conditions. The note shall read:
Private Conditions, Covenants, and Restrictions (CC&R's), or any other private
restrictive covenant imposed on landowners within the development, may not be
created or enforced which has the effect of prohibiting or limiting the installation of
xeriscape landscaping, solar/photo-voltaic collectors (if mounted flush upon any
established roof line), clothes lines (if located in back yards), odor -controlled compost
Page 2
LI
4
City of Fort Collins
Vignette Studios
c/o Terence Hoaglund
144 North Mason Street, #2
Fort Collins, CO 80524
STAFF PROJECT REVIEW
Date: 10/30/2008
Staff has reviewed your submittal for SANCTUARY WEST - FINAL PLANS, and we
offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Environmental
Number: 283 Created: 10/7/2008
[10/7/08] Dana Leavitt, the City's Environmental Planner, has comments in this letter as
well as on red -lined plans that are being forwarded to the applicant.
Topic: Fire
Number: 282 Created: 10/7/2008
[10/7/08] Carie Dann of the Poudre Fire Authority indicated that they have no problems
with this development request.
Topic: General
Number: 279 Created: 10/7/2008
[10/7/08] A copy of the letter received from Ed Holder of the Poudre School District is
attached to this comment letter.
Number: 280 Created: 10/7/2008
[10/7/08] Gene Fischer, the attorney for the New Mercer Ditch Company, indicated that
they have no problems with this development request.
Number: 284 Created: 10/7/2008
[10/7/08] Please see red -lined Site & Building Elevations Plans, containing minor
comments, from the Current Planning Department that are being forwarded to the
applicant.
Department: Current Planning Issue Contact: Dana Leavitt
Topic: General
Number: 147 Created: 3/19/2008
[9/23/08] A short meeting is required to finalize location of LOD.
[6/4/08]
[5/9/08] Will be determined during final plan review.