Number: 341 Created: 10/6/2009
[11/16/10] If this information is included, please explain where it is located. Diameter
and thickness is needed for each steel casing to be installed.
[10/6/09] Specify diameter and thickness of each steel casing.
The diameter and thickness were added.
Number: 360 Created: 10/9/2009
[11 /16/10]
[10/9/09] See redlined plans for other comments.
Your redlined comments were addressed.
Number: 361 Created: 10/9/2009
[11/16/101
[10/9/09] Prior to the re -submittal of this project, more effort is needed on checking,
cross checking and quality control.
Noted
Number: 383 Created: 11 /16/2010
[11/16/10] Show the existing sanitary sewer at the south end of Irish Drive.
The existing manhole has been added.
Number: 384 Created: 11 /16/2010
[11/16/10] On Sht 56, at connection to existing water main in LaPorte, call out existing
main as 27" concrete waterline.
Noted
Thank you for your time spent in reviewing these plans. If you have any further
questions, please feel free to contact any of the team members.
Yours Truly
Terence C. He
ASLA, LEED
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
7VIGNETTE
s t u d i o s
This easement is being provided. A copy has already been submitted to the city for review
Number: 272 Created: 9/29/2008
[11/19/10] There are two (2) more storm sewers that were labeled public, but should be
private. See sheet 57.
[10/13/09] Please see redlines for storm sewers that should be private, but were labeled
as public.
[9/29/081 Please label all storm sewers public or private on the Utility Plan sheets. Also,
please add a note on the storm sewer plan and profile sheets that all public storm
sewers are to be inspected by the City.
The labels have been changed.
Number: 393 Created: 11 /19/2010
[11/19/10] The City has decided the small east retention ponds may cause more
concerns than a benefit. These small ponds can be removed which will also allow the
removal of the retaining wall. The ditch company must also approve the free release of
these flows. The City can help justify this if needed. Please update the drainage report
that these flows are no longer to be detained and show in the table that is provided in the
text of the report. The proposed flows entering the irrigation ditch will still be much lower
than the existing flows into the ditch.
The East Pond has been removed and the Drainage Study has been revised accordingly.
Number: 395 Created: 11 /19/2010
[11/19/101 Please provide an erosion control escrow calculation in the drainage report.
An Erosion Control Escrow calculation has been prepared and submitted separately.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Water/Wastewater
Number: 339 Created: 10/6/2009
[11/16/10] Lengths are missing on Sht 35.
[10/6/09] Add the lengths of water main between valves, fittings, etc., etc.
Lengths were added.
Number: 340 Created: 10/6/2009
[11/16/10] Add steel casings where storm drains cross sanitary adjacent to MH 16,
between MH's 13 and 13A, adjacent to MH 6D and between MH's 3D and 3D1. On
water mains, add PVC casing below 24" storm drain at intersection of Kruse and
Eyestone.
[10/6/09] Add steel casings whenever water or sewer mains cross under a storm drain
that is greater than or equal to 24-inch.
Steel casings were added
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNETTE
s t u d i o s
This has been corrected.
Number: 389 Created: 11 /17/2010
[11/17/10] Please correct the street name on sheet 18 of the Utility Plans.
The Street Name has been fixed
Number: 390
Created: 11 /17/2010
[11/17/101 Please correct the Key Maps on sheets 36-41, 56, 59, 61, & 62 of the Utility
Plans. These maps are confusing. They should show the sheet orientation as it is in the
view.
They have been revised.
Number: 391 Created: 11 /17/2010
[11/17/101 Sheet 51 of the Utility Plans has an incorrect matchline sheet reference.
The match line has been changed.
Number: 392
Created: 11 /17/2010
[11/17/10] Sheets 56A & 56C of the Utility Plans have a station reference that does not
match between sheets.
The stationing has been revised.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Floodplain
Number: 394 Created: 11 /19/2010
[11/19/10] The identifiable base flood elevation rise of 0.4 ft upstream of the new
Briarwood alignment must be mitigated or approved by all affected property owners.
Easements shall be obtained as documentation prior to the approval of the development
agreement. As an alternative, the applicant's design team may continue to work with
staff to explore project modifications that will eliminate BFE rises. It is recommended a
meeting be scheduled as soon as possible to explore all options and discuss creative
solutions as soon as possible.
Topic: Stormwater
Number: 264 Created: 9/26/2008
[11/19/101 A drainage easement is required for the area of the swale that is to be graded
on off -site property.
[10/13/091 On the overlot grading plan, notes and some spot grading needs to be
included to show how the low flows entering the property from the private pond to the
west will not flow into this proposed water quality detention pond. A constant low flow
will cause problems to the proposed detention ponds.
[9/26/08] The south water quality pond is proposed within a wetland and will have
problems with ground water. The pond will fill full of water and flow down to the retention
pond where there is no outfall. This will cause both the water quality pond and the north -
south retention pond to fill with 3 feet or more of water. The pond can not hold water for
more than 72 hours, so this is a problem and needs to be resolved.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNETTE
s t u d i o s
All comments completed.
Department: PFA� �Zr� r Issue Contact: Carle Dann
Topic: Fire - - --U — �----'
Number: 330 Created: 10/6/2009
[11/18/101 I'm available to discuss FIRE LANE signs and locations.
Good general notes regarding the Emergency Access Easements. Let's get together
soon to hammer out a Fire Lane Plan for signs and/or red curb paint.
This has been completed.
Department: Technical Services Issue Contact: Jeff County
Topic: Plat
Number: 345 Created: 10/7/2009
[11/17/10] These will need to be added before the Plat is filed.
[10/7/09] The right of way & easements along Barton Drive and Briarwood Road that
are to being dedicated by separate document, must have reception numbers shown on
the plat prior to filing.
Noted
Number: 385 Created: 11 /17/2010
[11/17/10] The boundary & legal close.
Thanks!
Number: 386 Created: 11 /17/2010
[11/17/10] There are line over text issues on the Subdivision Plat.
This has been corrected.
Topic: Site Plan
Number: 387 Created: 11/17/2010
[11/17/10] The legal description on sheet 1 of the Site Plans is incorrect.
This has been corrected.
Topic: Utility Plans
Number: 350 Created: 10/7/2009
[11/17/10] This information is still incorrect. Please call Technical Services @ 221-6588
or Surveying @ 221-6605, for a current copy of the City of Fort Collins Vertical Control
Network.
[10/7/091 The benchmark descriptions & the "City's benchmark system name" are
incorrect. See sheet 3.
The benchmark note was revised.
Number: 388 Created: 11 /17/2010
[11/17/10] There is missing linework on sheets 14-16 of the Utility Plans.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNEi
TE
s t i o s
Noted, these are due at mylar stage
Number: 414 Created: 12/2/2010
[12/2/10] Sheet 33 - matchlines are not right.
They were revised.
Number: 415 Created: 12/2/2010
[12/2/10] Sheet 34 - see redlines
The appropriate redlined comments have been addressed.
Topic: Utility Plans - Water Profiles
Number: 427 Created: 12/2/2010
[12/2/10] The plan view needs to go to 23+00 like the profile view does.
Comment deleted per Susan
Number: 428 Created: 12/2/2010
[12/2/10] Sheet 56A, 5613, 56D, 56E, 57 and the rest of the storm profiles are missing
the cover depth over a structure or stormline shown in the profiles. Must meet minimum
requirements.
Cover depth was added for the shallow storm pipes.
Department: Forestry Issue Contact: Tim Buchanan
Topic: Landscape Plans
Number: 396 Created: 11 /24/2010
[11/24/10] The applicant needs to schedule a site visit with the City Forester to
determine which trees on the site are significant. Significant trees need to be shown on
the plans with intent to save or remove. Significant trees to be removed need to be
mitigated.
Add tree protection notes found in 3.2.1 G 1-7
English Oak needs to be specified as Skymaster English Oak on the plant list.
Add these Planting notes:
• A permit must be obtained from the City forester before any trees or shrubs as
noted on this plan are planted, pruned or removed on the public right-of-way. This
includes zones between the sidewalk and curb, medians and other city property.
This permit shall approve the location and species to be planted. Failure to obtain
this permit may result in replacing or relocating trees and a hold on certificate of
occupancy.
The project manager shall contact the City Forester to inspect all street tree
plantings at the completion of each phase of the development. All trees need to
have been installed as shown on the landscape plan. Approval of street tree
planting is required before final approval of each phase.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNETTE
s t u d i o s
Number: 422 Created: 12/2/2010
[12/2/101 Sheet 43, 44 - same comment as with Barton. Need to show the profiles on
out to the CL of LaPorte and the interim patch condition.
The interim was added.
Number: 424 Created: 12/2/2010
[12/2/10] None of your private drive profiles tie proposed grades into existing.
These have been corrected.
Number: 425 Created: 12/2/2010
[12/2/10] Sheet 47 - same comment as with Kruse. What is the interim design so that
the proposed ties into existing? Make sure the estimates include removing and
reconstructing the interim to your property line. Also need to include the utilities to the
property line. May need some grading and/or slope easements depending on how this
turns out. I believe I've mentioned this several rounds ago in another comment so you
might be seeing this twice.
The interim was added.
Number: 432 Created: 12/2/2010
[12/2/10] ALL profiles must be carried out to the centerline of the street they intersect.
See Number 420
Topic: Utility Plans - Striping Plan
Number: 426 Created: 12/2/2010
[12/2/10] Sheet 48 - need a barricade across the end of Kruse in addition to the one
shown at the sidewalk.
Added
Topic: Utility Plans - Utility Sheet
Number: 285 Created: 10/8/2008
[12/l/10] Repeat. Still need to provide Sewer.
[10/15/091 Repeat.
[10/8/08] Please provide utilities from Barton Drive through Webb Ave to the property
line or at least past the ultimate road improvements so that the property to the south can
tie in without cutting into the street. If the utilities are not provided to the property line, an
estimate for their construction is required for our review and approval.
Since our site is higher, Roger does not want this sewer stub, the sewer for this property
will come from Laporte Ave.
Number: 303 Created: 10/8/2008
[12/l/10] See other comments regarding the estimate for cash in lieu.
[10/15/091 Repeat - the utilities must be constructed to the eastern PL.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNETTE
s t u d i o s
sheet. Most sheets show a continuous sidewalk with out any kind of labeling or
lineweight showing that something is happening.
Comment deleted per Susan
Number: 380 Created: 10/21 /2009
[12/1/10] [10/21/09] Please add "and sidewalks" to the label stationing the end of temp
asphalt roadways on the profiles, each street this comment applies.
Added
Number: 416 Created: 12/2/2010
[12/2/10] All typical street sections must be labeled with "station X to station X, all plan
and profile sheets.
Stationing was added where appropriate.
Number: 417 Created: 12/2/2010
[12/2/10] Sheet 37 - flowlines need to tie into existing. Currently shown with a 2.5' bust.
Need to show the interim too.
This has been corrected.
Number: 418 Created: 12/2/2010
[12/2/10] Sheet 38 - still calling out concrete pavement. The stationing shown on the
typical street sections are wrong.
The pavement is concrete and the sections were revised.
Number: 419 Created: 12/2/2010
[12/2/10] Sheet 39 -correct the stationing. Can NOT change curb type mid block.
Please correct.
Comment deleted per Susan
Number: 420 Created: 12/2/2010
[12/2/10] All profiles need to be carried through to the centerline of the street they
intersect.
A profile was revised. \
Number: 421 Created: 12/2/2010
[12/2/10] Sheet 40 and 41 - need to show the interim for Kruse in addition to the
ultimate design - how are you tying in the grades? Make sure the estimate contains the
costs for removing and regrading whatever you do so (including the temp turnaround)
when the future developer ties in, he has the money for the true costs.
The interim was added.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNETTE
s t u d i o s
Transition lengths were added.
Number: 305 Created: 10/10/2008
[12/1/10] Repeat -please keep the curb types the same along the south side for the
entire block. We will not approve a change from VC to rollover midblock at the ramp as
it is a maintenance issue for us and will cost the city extra money to deal with this in the
future.
[10/15/09] Repeat - the curb can not change type in the middle of the block. Barton
Drive, south flowline, must stay the same from PC to PC.
[10/10/08] All concrete sections of the street must be constructed by block, from PC to
PC. In other words, all of Briarwood must be constructed in concrete and Barton from
Tavelli to the east side of Briarwood must be constructed in concrete (to the PC, see
redlines).
Comment deleted per Susan
Number: 306 Created: 10/10/2008
[12/1/10] Repeat. Please show and station all driveways.
[10/15/09] Repeat. These are narrow lots and the driveways must be placed exactly
where they are shown to make sure they aren't placed over the water line. Can do either
a typical lot detail with dimensioning for the rollovers and place a note on the plans that
states that all driveways must be constructed per the detail OR you can individually
station them.
[10/10/081 Station all driveway intersections in both plan and profile views. If you don't
want to station both sides of the driveways, you station one side only and put a typical
driveway intersection detail on each sheet of the P&Ps showing the one side stationed
and dimension out the typical width of the driveway. That way you would only have to
station both sides of atypical driveways.
A typical detail was added per your previous comment for the front load single family
lots. Stationing for the duplex driveways has been added.
Number: 309
Created: 10/10/2008
[12/1/10] Seecomment#43.
[10/15/09] The ultimate section of the roadway must be carried through, both sides of
the street to the PL. Only the extra half circle within the temp turnaround can be
constructed in the interim.
[10/10/08] Please provide an ultimate design for Kruse Drive to the end of the property
line. Please provide an estimate for the removal of the temporary turnaround and
landscaping and construction of the ultimate Kruse Drive to the property line for our
review and approval. See comment 51 for the history of this comment.
Noted, these are due at mylar stage
Number: 310 Created: 10/10/2008
[12/1/10] Please station as stated below.
[10/16/091 [10/10/08] Need to station the end of the ultimate sidewalks and beginning of
asphalt paths at Barton and Briarwood and clearly show that is happening on each
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNETTE
s t u d i o s
Number: 430 Created: 12/2/2010
[12/2/10] Please see figure 7-28 and 7-27 for all spot elevation requirements.
Noted
Topic: Utility Plans - Plan & Profiles
Number: 70 Created: 10/30/2007
[12/1/10] This still needs to be done.
[6/6/08] [5/5/08] [3/19/081 [10/30/07] Heads up for FC - CL stationing is required and
would require station equations on all horizontal curves. However, you may provide
separate FL stationing as long as you do one of two things: either provide a cross
section at all PCs and VCs (beginning, middle and end) or spot elevations on the plan
view in the same location. Label the cross slopes to at least one decimal point in those
areas. That is the only way we can see that the min/max cross slope requirements are
being met.
L
Pdfs with the cross slope information will be emailed to Susan Joy.
Number: 72 Created: 10/30/2007
[12/1/10] Now that the street is no longer proposed in concrete, please remove all
concrete details shown on 636.
[10/8/081 Please provide a concrete joint detail for all streets constructed out with
concrete.
[6/6/08] Just carrying this item through until FC. Street standards require that the
concrete section be done from PC to PC by street block.
[5/5/08] [3/19/08] Most of the cover issues have been taken care of with the exception
of two places. You may construct a 30' concrete section over Storm 5 per Rick Richter in
Pavement Management. Ajoint detail will be required in FC for that section. Storm 5A is
acceptable provided that a note is placed on the plan and profile sheet stating that Storm
5A is to be placed behind the curb.
[10/30/071 Minimum cover requirements are not being met. See LCUASS 12.2.2 for
minimum depth requirements (2' below subgrade or S to finish). This applies to all
utilities and any structure (box culvert or otherwise).
The street is concrete - the details were not removed.
Number: 214 Created: 5/14/2008
[12/l/10] Some are missing again.
[9/25/081 Please label the curb and gutter type on the plan view.
[6/6/08] FC
[5/14/081 Please label the curb and gutter type on the plan view as well so that it is very
clear which type of curb is being installed and where.
Comment deleted per Susan
Number: 287 Created: 10/8/2008
[12/1/10] Please show/dimension all transition lengths in each intersection detail.
[10/15/09] We still need the intersection spot details.
[10/8/08] Please provide intersection spot details in accordance with Figure 7-27 and
7-28.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vipneftestudios.com
VIGNETTE
s t u d i o s
Number: 410 Created: 12/1 /2010
[12/1/10] Sheet 21 - correct the reference to the chase. Remove the partial word or
spell it out.
Detail D10 has been added, however, detail 709 is more appropriate for Briarwood Road
because of its reverse drainage.
Number: 411 Created: 12/1/2010
[12/1 /10] Sheet 22 - please label the tow, bow in section A or min/max.
The top of foundation was added.
Number: 412 Created: 12/1 /2010
[12/1 /10] Sheet 24 -Add Type III to the proposed barricade label.
Added
Number: 413 Created: 12/2/2010
[12/2/10] Sheet 27 - need to label/dimension all easements and call them out as
existing, proposed, by sep doc, etc. Need a swale at LaPorte intersection, both sides on
Briarwood.
Easements are shown.
Number: 423 Created: 12/2/2010
[12/2/101 The new drainage easement on the east side of Briarwood does not appear
large enough to construct what you are proposing within it. Need to make it larger or pull
the culvert back.
You previously requested the culvert to be extended. The culvert length has not been
revised.
Topic: Utility Plans - Horizontal Control
Number: 402 Created: 12/1 /2010
[12/1/10] The horizontal control sheets are missing easements and dedications. Need
to label the min as well as the max on all retaining walls. If there is no variance in
height, then just label the height and remove the "max". The 8' temp sw is mislabeled as
4.5' in one location. PleaseFeta;;e a'� labeling to the FeadeF. e ` �-r'— Thrncocrrcrn�rtirv'i ai �e
(Sentence deleted per Susan).
The horizontal control sheets have been revised. The height of the retaining walls have
been removed.
Topic: Utility Plans - Intersection Details
Number: 429 Created: 12/2/2010
[12/2/10] Need to show/label/dimension the transition lengths.
Transition lengths were added.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNETTE
s t u d i o s
Per meeting with Susan, the plans are OK, with exception of a few missing corner spots
that are now shown.
Number: 378 Created: 10/21 /2009
[12/1/10] Now that the min/max heights are shown, the 5' retaining walls in Outlot C
present a safety concern. That's a pretty good fall off the side of that wall - either place
handrails to prevent that or create a series of walls that step down instead. Please work
with Lindsey Ex, the environmental planner and Steve Olt, your current planner on the
best design options.
[10/21/09] There appears to be another retaining wall(s) in Outlot C? If so, please label
and provide the bow, tow information. If over T, then we'll need a typical section on the
utility plans with the final structural design provided to Building and Zoning at permit.
Please coordinate the Site and Landscape plans as well.
Per Building and Zoning, a hand rail is not required since there are no paths adjacent to
the walls.
Number: 406 Created: 12/1 /2010
[12/l/10] Please refer to the correct sidewalk chase detail on all appropriate sheets.
Detail 709 must be removed and replaced with D10, 11, 12 or 13 per an earlier comment
that has been repeated under the Detail Sheets section.
Detail DIO has been added, however, detail 709 is more appropriate for Briarwood Road
because of its reverse drainage.
Number: 407 Created: 12/1 /2010
[12/1/10] Sheet 15 - Show/label/dimension offsite LIE and slope easement so I can
determine that all construction is occurring within it. Offsite grading shown at the corner
of Bacon Ln - see redlines and provide an offsite slope easement OR pull the grading off
the other property. Grades are not shown tying into existing on several sheets.
Easements were added and grading was revised where appropriate.
Number: 408 Created: 12/l /2010
[12/1/10] Sheet 16 - offsite grading shown onto private property at Irish and Impala.
Either correct this or provide offsite slope easements. Grades do not tie into existing
see redlines.
Grading was revised.
Number: 409 Created: 12/1 /2010
[12/1/10] Sheet 20 - Label all slope ratios. Offsite grading shown. Please provide a
slope easement from the effected property owner.
Easements were added and grading was revised where appropriate.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNETTE
s t u d i o s
Number: 434 Created: 12/2/2010
[12/2/10] Please add Traffic Engineer and Environmental Planner to the signature block
along with an extra blank line.
The signature block was revised on all sheets.
Topic: Utility Plans - Grading
Number: 159 Created: 3/20/2008
[12/1/10] [5/5/08] [3/20/081 Offsite grading may be required to construct the Webb and
Kruse street stub. The plan and profiles indicate that you'll need an interim grading
design to tie into existing from the end of the proposed construction. As previously
stated, an estimate for the completion of your street stub to the property line including fill,
sidewalks, c&g, landscaping, irrigation and road will be required for our review and
approval.
Noted, these are due at mylar stage-offsite easements for these streets are not needed.
Number: 242 Created: 6/6/2008
[1211 /10] [9/25/08] [6/6/08] Call out detail D10, 11, 12 or 13 and refer to sheet # for all
sidewalk chases in public row.
Detail D10 has been added, however, detail 709 is more appropriate for Briarwood Road
because of its reverse drainage.
Number: 295
[12/1/10] Still missing a few.
[10/15/09] Still missing some.
[10/8/081 Please provide finish
did not get them all.
A few were added.
Created: 10/8/2008
grade elevations for all lot corners. I marked a few but
Number: 297 Created: 10/8/2008
[12/1/10] Still need to provide the slope ratios on some of the sidewalks and then
provide the slopes where it changes on each sidewalk. The slopes are not consistent
out there and the design doesn't currently reflect that.
[10/15/09] Information was provided for two out of four sidewalks. Please label the path
through the detention pond with the material, ie, Crusher Fines, and place a note or
typical section off to the side calling out how you want it constructed.
[10/8/081 Please provide spot elevations and slope info on the sidewalk connecting to
Webb Avenue.
Slope ratios were added
Number: 300 Created: 10/8/2008
[12/1/10] Repeat. Now large X's are shown. See redlines.
[10/15/091 Some still "off', others missing. Other grading sheets have the same issue.
[10/8/08] Sheet 23 - spot elevations for the lot corners are "off' just a little bit ... not on
the corner itself.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNETTE
sr�dios
Topic: Utility Plans - Detail Sheets
Number: 377 Created: 10/21 /2009
[12/1/10] Still need the appropriate sidewalk chase detail - see below.
[10121/09] Please replace detail 709 with detail D10, 11, 12 or 13 which ever applies
and correct the labeling on the various grading sheets.
Detail DIO has been added, however, detail 709 is more appropriate for Briarwood Road
because of its reverse drainage.
Topic: Utility Plans - Erosion Control
Number: 405 Created: 12/1 /2010
[12/1/10] Please show how the drainage is being channeled in the interim from LaPorte
to Barton and Briarwood. Will you use a swale to the C&G?
Temporary asphalt curb were added to channel flow to the low point.
Topic: Utility Plans - Estimates
Number: 433 Created: 12/2/2010
[12/2/10] Please break the estimate out by area.
Noted, these are due at mylar stage
Topic: Utility Plans - General
Number: 93 Created: 11 /2/2007
[12/1/10] Please be sure to return the redlines with the submittal for the next round of
review.
[10/15/091 [9/25/081 [6/6/08] [5/5/08] [3/19/08] [11/2/07] See redlines for other
comments.
The appropriate redlined comments have been addressed.
Number: 207 Created: 5/12/2008
[12/1/10] Variance #1 needs to be corrected as you are no longer doing a concrete
section. Please correct "allow" to "allowed" in #7.
[6/6/08] I'll send you an example of how to write this so that it requires only one
sentence yet hits all the points listed below. We can work this out in FC.
[5/12/08] All variances must be listed under line 48 of the general notes stating the
section of LCLIASS, what it requires and the variance granted. Formal variance
requests prepared by a licensed engineer in accordance with 1.9.4 may or may not be
required depending on the variance being requested.
Concrete pavement section is still being used — Variance #1 remains - # 7 was corrected.
Number: 401 Created: 12/1 /2010
[12/1/10] Please remove the note on the top of page 3. The notes shown on page 3
ARE the City's standard notes and are required.
The note was removed.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vigneftestudios.com
VIGNETTE
studios
Number: 400 Created: 12/1 /2010
[12/1/10] Please provide all missing reception numbers.
Topic: Site and Landscape Plans
Number: 431 Created: 12/2/2010
[12/2/101 Just missing some easements, label whether the existing shed is staying or
going and retaining label wall heights :)
Complete
Topic: Site Plan
Number: 318 Created: 10/10/2008
[12/1/10] [10/16/091 [10/10/08] See redlines and coordinate with comments under other
topics.
Complete
Topic: Utility Plans
Number: 398 Created: 12/1 /2010
[12/1/10] The revision block has been removed from the title block, all sheets. Please
put it back so that you have it in place to handle future revisions to the approved mylars.
It has been placed on the sheets again.
Topic: Utility Plans - Cover Sheet
Number: 162 Created: 3/20/2008
[12/1/10] Repeat. Must station them as well. Please provide the interim sections too.
[10/15/091 The typical street sections have been corrected, however, the changes were
not carried throughout the rest of the sheets and curb types can not change in the
middle of the block as shown on the south side of Barton. Please carry the curb type all
the way to the PC at Briarwood.
[10/8/08] Please list the names of the streets under each typical section on the cover
sheet. Please remove "and drainage" in the easement labels so that it matches the plat.
Please correct this throughout the plan set.
[515/08] [3/20/08] Typical street sections need to be identified by street name as the
sections are not typical and change from street to street with the different curb types.
Curb types can change at the end of blocks but may not occur in the middle of a block.
Missing a typical section for Webb Avenue.
Stationing has been added.
Number: 397 Created: 12/1 /2010
[12/1/10] Please provide typical sections for the interim Barton and Briarwood showing
the temp asphalt sidewalks and swales. Please station from x to x.
Interim sections have been added.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNETTE
s t u d i o s
[5/5/08] Barton row needs to be dedicated all the way to the existing property line so
that a separate tract of land isn't dividing the row and Sanctuary West. Conversations
with Vignette indicated that the school district was going to dedicate this area to the
development to be owned and maintained by this development. Either solution is fine,
the plans just need to reflect the option you are going with and all appropriate letters of
intent received prior to scheduling the hearing.
[3/20/08] Offsite row, slope & utility easements are required for Barton through the
school property. Offsite slope easements may be required for the Webb Ave street stub
depending on where the 4:1 slope ends. Offsite slope and utility easements are required
to complete the Briarwood connection to LaPorte. An offsite access easement will be
required for the sidewalk through the small lot on the north side of the large detention
pond. In order to go to hearing, only letters of intent from the affected property owner is
required. The actual easement itself will be required during FC and prior to plan
approval.
A copy of the parcel dedication has been submitted to the city previously and is included
with this submittal.
Number: 308 Created: 10/10/2008
[12/1/101 [10/15/091 [10/10/08] The necessity for a new offsite easement has been
generated by the addition of a culvert in Briarwood Drive. The one shown does not
appear big enough to construct the proposed culvert.
The easements near Briarwood Road have been increased to accommodate the culvert
and grading.
Number: 321 Created: 10/10/2008
[11/26/10] Still need the dedications.
[10/16/09] Repeat comment. Please resubmit the corrected documents on the city's
standard dedication template.
[10/10/08] Easements 1, 2 and 3 were received (those surrounding Briarwood),
however there are some outstanding issues.
The exhibit for Vattano is missing the Book and Page.
The exhibit for Phillips is missing the Book and Page.
The exhibit for Alumbaugh is missing the Book and Page.
The dedication statement for Alumbaugh was not submitted with the City's standard
dedication language. Also, there are two properties on the west side of Briarwood. This
easement does not make it clear that both properties are dedicating this easement.
Perhaps a legal description is in order?
These have been submitted to the city for review. We have attached a copy to this
submittal.
Topic: Plat
Number: 399 Created: 12/1 /2010
[12/1/10] Please remove all revisions from the Plat prior to printing mylars.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNEi
TE
s t i o s
[10/16/09] Under review. Will finalize as we get closer to mylars.
[10/16/081 Please provide an estimate for the design and construction of the future
LaPorte Street improvements along your frontage for our review and approval.
Noted, these are date at mylar stage
Number: 372
Created: 10/21 /2009
[11/26/10] Please provide the row and slope/ue dedications for review and approval.
Please use the CORRECT City templates as we will not accept or record a document
that has had the dedication statement altered. Additional TDRF and county filing fees
apply.
[10/21/09] All Plan Sets will need to be adjusted if the school's property is being
transferred to this Development instead of remaining the school's property with them
signing the plat and plan sets.
These have been submitted to the cityfor review. We have attached a copy to this
submittal.
Number: 403 Created: 12/1 /2010
[12/l/10] Is the frame shed on skids at the end of Impala Drive on your property going
to be removed or will it stay?
This will be removed, it has been determined that this belongs to the adjacent neighbor
on Impala
Number: 404 Created: 12/1 /2010
[12/1/10] The temp turnaround as shown does not provide a total of 100' turnaround. It
is permitted to offset the circular turnaround as long as the 50' turning radius is met all
the way around. In other words, you are short on the north side of the street and need to
increase the turnaround on the south side to account for it.
This has been revised as agreed upon with Poudre Fire Authority and Engineering.
Topic: Landscape Plans
Number: 317 Created: 10/10/2008
[12/1/10] [10/16/09] [10/10/081 See redlines and coordinate with comments under other
topics.
The redline comments have been completed.
Topic: Mite Easements
Number: 160 Created: 3/20/2008
[11/26/10] See comment 372 regarding Barton dedications. Webb St will need offsite
slope easements. Offsite slope and drainage easements required on Briarwood.
Dedications will only be accepted using the City's template language with no alterations.
TDRF and county filing fees apply.
[10/15/09] [9/25/08] Keeping this open until the property is transferred from the school.
[6/6/08] This is still an issue and needs to be resolved prior to hearing.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNETTE
s t u d i o s
April 6, 2011
Steve Olt
City Planner
Community Planning and Development
281 North College Avenue
Fort Collins Colorado 80524
Dear Steve,
The following is the applicant's response to the Sanctuary West FCP staff comments dated
December 3, 2010. Please find attached copies of the revised FCP plans for your review.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 43 Created: 10/30/2007
[12/1/10] Updated estimates will be required and they will need to include the unbuilt
portion of the utilities on Kruse St, street cuts, street repairs, and street cut fees. Make
sure you are including the removal of the temp turnaround, landscape, sw, irrigation
systems and street trees as well.
[10/15/09] Thank you for the estimates however they are a little early. There will be the
need to update them with the next round of review. Hang on to them for now until we're
ready for mylars and then we can review them once we're sure nothing is changing.
[10/8/08] Please provide an estimate for the design and construction of Webb Avenue to
the property line for our review and approval. I will email you a template to use.
[10/30/07] This project is responsible for the design and construction of Webb Ave to the
property line plus 500' of offsite preliminary design. At minimum, Webb Ave must be
constructed to the PC's (including the ped ramps) and type III barricades must be
provided. If any portion of the road is not constructed (from the PCs to the PL), then this
development is required to escrow the cash necessary to complete the street. An
estimate for our review and approval will be required in FC and that number will go into
the development agreement to be paid prior to the first building permit. Also, need to
watch whether the street is tipping up or down because the drainage has to either stay
on site or a drainage easement from the offsite property owner will be required.
Noted, these are dare at mylar stage
Number: 316 Created: 10/10/2008
[12/1/10] We will need updated estimates closer to mylars.
[10/16/09] Thank you for submitting the estimates. I will hang onto them until the plans
are ready for mylars and review them at that time. Please adjust your estimates as we
continue to adjust the plans but don't submit the updated estimates until we call for
mylars.
[10/10/081 Please provide an estimate for the design and construction of Barton and
Briarwood to LaPorte from the point you are ending the ultimate improvements to the
new row for our review and approval.
Noted, these are due at mylar stage
Number: 326 Created: 10/16/2008
[12/1/10] Will need updated estimates closer to mylars.
PO Box 1889