acceptance of the variance request. A stamped request is attached.
Number: 24. Created: 12/27/2005
[1/31/06] Carried over for reference pending ok from Qwest in not providing the full 15'
utility easement:
[12/27/05] Should a utility easement be required [related to the previous ID23] private
lines such as the roof drain shown on the north side of the building cannot be located
within the easement.
No private lines are located within the proposed utility easement.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 13 Created: 12/20/2005
[2/3/06]
[12/20/05] At final, additional comments may be presented.
Acknowledged.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: WatedWW
Number: 16 Created: 12/21 /2005
[2/1/06] Revise notes on abandonment as shown on Sheet 5.
[12/21/05] Are the water/sewer services being replaced/renewed at the same location
as the existing services? If not, show location of existing services and add appropriate
notes regarding abandonment at the mains.
The notes on Sheet 5 have been revised as requested.
Comments from Current Planning
The Lighting Plan indicates that the wall -mounted fixtures are further described as +10-
0" A.F.F. Please indicate what this means on the plans.
Above Finish Floor (A.F.F.) has been indicated on the plans.
If you have any questions, please do not hesitate to call.
Sincerely:
/�0�
oseph C Sparone, P.E.
Project Engineer
February 22, 2006
Mr. Ted Shepard
Fort Collins Planning Department
281 North College Avenue
Fort Collins, CO 80524
Drake Shops -TYPE H
Response to staff Project Review comments
Dear Mr. Shepard,
J R ENGINEERING
A Westrian Company
We have reviewed the staff letter dated February 13, 2006 and have the following
responses:
ISSUES
Department: Engineering Issue Contact: Marc Virata
Topic: Construction Plans
Number: 25 Created: 12/27/2005
[1/31/06] The variance request to reduce the curb return radii will need to be stamped
but is otherwise acceptable.
[12/27/05] The horizontal control plan species curb return radii of 13' for the driveway
out to Drake Road. Per LCUASS standards, 20' is required. We may entertain a
smaller radius than standards, but further follow up is needed.
A stamped request is attached.
Number: 30 Created: 12/27/2005
[1/31/06] Carried over for reference:
[12/27/05] We will need a legal description of the emergency access easement shown
on site after hearing for evaluation prior to obtaining a deed of dedication for the
easement.
A legal description for the emergency access easement and utility easement will
be provided under separate cover.
Topic: General
Number: 23 Created: 12/27/2005
[1/31/06] The applicant provided a variance request which is required to be stamped.
The justification included the pertinent utility providers except Qwest, which will need to
be verified prior to sign off on the variance request.
[12/27/05] The development is not providing for a 15' utility easement behind the right-
of-way on both Drake and College as is typically required per City standards. The
applicant will need to provide information from all the utilities indicating that they have
no objection to not providing the utility easement corridors.
2620 East Prospect Road, Suite 190, Fort Collins, CO 80525