Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SINCLAIR REDEVELOPMENT, COLLEGE & DRAKE, THE DRAKE SHOPS - FDP - 25-03C - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET
G,i�ti ,`b 2. /Z2lioo 4� 24�5-FINAL PLAN ROUTING SHEET Item: DIV et &!/OC 9-E'A6✓4C2 /r/74-0,✓7' — D/c,. $c e- This projec ent to has been scheduled for Public Hearing on J-AN. J 6 , 07 0 0 6 c;evor The following table lists final plan submittal requirements for this project. cuaanrr rtwxIm+c A final fee of $1 000.00 is required at the time of submittal unless otherwise waived or reduced. Fee Waiver eductio Approval: LA/'1EXiN GG a xx Amount: 10. 0 Date: /G - e G Planner: %fD S. Engineer: /7.4•ac Y . oil Engineering Pavement Light & Power Natural Resources Poudre Fire Authority Post Office Street Oversizing Technical Services Traffic Operations Transportation lanning Water & Wastewater Water District: Water Conservation Xcel Energy County Assessor Thompson -----------■.-. TOTAL' ©■E©E©■■-U■■■■■ 1 ✓ v