Loading...
HomeMy WebLinkAboutSINCLAIR REDEVELOPMENT, COLLEGE & DRAKE, THE DRAKE SHOPS - PDP - 25-03B - CORRESPONDENCE - (3)', • M Department: Stormwater-Water-Wastewaterlssue Contact: Wes Lamarque Topic: Stormwater Number: 13 Created: 12/20/2005 [2/3/06] [12/20/05] At final, additional comments may be presented. Department: Stormwater-Water-Wastewaterlssue Contact: Roger Buffington Topic: Water/WW Number: 16 Created: 12/21/2005 [2/1/06] Revise notes on abandonment as shown on Sheet 5. [12/21/05] Are the water/sewer services being replaced/renewed at the same location as the existing services? If not, show location of existing services and add appropriate notes regarding abandonment at the mains. Comments from Current Planning The Lighting Plan indicates that the wall -mounted fixtures are further described as +10-0" A.F.F. Please indicate what this means on the plans. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sinnccerely- /-a Ted She Chief Planner Page 2 STAFF PROJECT REVIEW City of Fort Collins DESIGN EDGE Date: 02/13/2006 ANDREW LEMMER 1820 15TH AVE. #B DENVER, CO 80202 Staff has reviewed your submittal for SINCLAIR REDEVELOPMENT, COLLEGE & DRAKE, THE DRAKE SHOPS PDP - TYPE I, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Marc Virata Topic: Construction Plans Number: 25 Created: 12/27/2005 [1/31/06] The variance request to reduce the curb return radii will need to be stamped but is otherwise acceptable. [12/27/05] The horizontal control plan species curb return radii of 13' for the driveway out to Drake Road. Per LCUASS standards, 20' is required. We may entertain a smaller radius than standards, but further follow up is needed. Number: 30 Created: 12/27/2005 [1/31/06] Carried over for reference: [12/27/05] We will need a legal description of the emergency access easement shown on site after hearing for evaluation prior to obtaining a deed of dedication for the easement. Topic: General Number: 23 Created: 12/27/2005 [1/31/06) The applicant provided a variance request which is required to be stamped. The justification included the pertinent utility providers except Qwest, which will need to be verified prior to sign off on the variance request. [12/27/05] The development is not providing for a 15' utility easement behind the right-of-way on both Drake and College as is typically required per City standards. The applicant will need to provide information from all the utilities indicating that they have no objection to not providing the utility easement corridors. Number: 24 Created: 12/27/2005 [1/31/06] Carried over for reference pending ok from Qwest in not providing the full 15' utility easement: [12/27/05] Should a utility easement be required [related to the previous ID23] private lines such as the roof drain shown on the north side of the building cannot be located within the easement. Page 1