HomeMy WebLinkAboutSINCLAIR REDEVELOPMENT, COLLEGE & DRAKE, THE DRAKE SHOPS - PDP - 25-03B - CORRESPONDENCE -[12/21/05] Is there a utility easement along the Drake R.O.W.? Curb stop must be within an
easement.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 1 Created: 12/1 /2005
[12/1/05] The parking counts on the modification and the actual site plan need to be
corrected. There is a total of 29 spaces being shown, not 27.
Number: 2 Created: 12/1 /2005
[12/1/05] On the site plan under the Parking Requirements section "Restaurant" should also
include the wording "future" or "potential"
Number: 3 Created: 12/1 /2005
[12/1/05] Handicap stall #2 needs to signed as "Van Accessible" as well as "Handicap."
Number: 4 Created: 12/1 /2005
[12/1/05] It looks to me like there could be several more street trees in grates added
without encroaching in the site distance easement.
Number: 5 Created: 12/1 /2005
[12/1/05] Add a note to the landscape plan regarding installation of landscaping prior to
issuance of a CO. 3.2.1(1)(4)
Comments from Current Planning:
1. As mentioned at our project review meeting on December 21, 2005, please add more
glazing to the west elevation.
2. Enclosed please find the approved architectural elevations for the Minor Amendment
that approved the conversion of Eckerd's to Walgreen's. This was approved on
October 21, 2004. Please match the Walgreen's exterior materials and colors to the
maximum extent feasible. Note that the awning color is "Forest Green." Also, note the
cornice detail. The detailed cornice is how this building complies with having to provide
a distinctive top.
3. There are five trees along the perimeter of the parking lot that are only three feet from
the curb. Suggest adding wheel stops to prevent larger vehicles from damaging these
trees.
4. Please add the enclosed General Notes to the Site Plan.
5. The parking lot light fixtures do not match Walgreen's. Enclosed please find the
approved Lighting Plan for Walgreen's so you can match the specification, and
mounting height, for the parking lot lights.
6. There is excessive illumination around the immediate building perimeter. Foot-candle
measurements ranging from five to eight are unnecessarily bright for any practical
purpose. Further, such levels are in sharp contrast to the roadway lighting which may
contribute to driver distraction. As a remedy, either the eight "BB" fixtures must be
reduced to four, or each lamp must be reduced from 100 watts to 50 watts.
Page 4
Number: 32 Created: 12/27/2005
[12/27/05] Water supply appears to be available; however, the existing hydrant shall deliver
1500 g.p.m. @ 20 psi. Schedule a flow test with the water and fire departments.
Number: 33 Created: 12/27/2005
[12/27/05] The building address shall be visible from the street fronting the property, and
shall also be visible from the fire lane.
Number: 34 Created: 12/28/2005
[12/28/05] Corrosives, flammable liquids, or reactive or toxic materials (as defined by the
Uniform Fire Code), if used, stored or handled on site, must have a Hazardous Materials
Impact Analysis (HMIA) completed and supplied to the Fire Department and Planning
Department.
Number: 35 Created: 12/28/2005
[12/28/05] Proper width of the fire lane shall be maintained adjacent to the trash area.
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 14 Created: 12/20/2005
[12/20/05] Landscape: The salix (willow) on the north side has a 4'x6' - 4'-6' mature foot
print - the sumac will have a sidewalk encroachment problem - SF (@ north drive entrance)
not listed on plant schedule.
Would recommend revising plant materials on north to lower, smaller foot prints to avoid site
distance problems and conflicts with pedestrians.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 11 Created: 12/20/2005
[12/20/05] Stormwater is ready for a hearing.
Number: 12 Created: 12/20/2005
[12/20/05] At final, a discussion is needed to determine the best water quality treatment for
this site. The existing off -site water quality pond is in a drainage easement and can be
allowed to be utilized for this site even without owner approval. Every attempt should be
made to notify and work with the property owner, but due to existing drainage patterns
already flowing onto this property and a drainage easement granted to the City for the pond,
this site can modify the pond to include the required water quality volume.
Number: 13 Created: 12/20/2005
[12/20/05] At final, additional comments may be presented.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: WatedWW
Number: 16 Created: 12/21 /2005
[12/21/05] Are the water/sewer services being replaced/renewed at the same location as
the existing services? If not, show location of existing services and add appropriate notes
regarding abandonment at the mains.
Number: 17
Created: 12/21 /2005
Page 3
Number: 29 Created: 12/27/2005
[12/27/05] Provide a second City of Fort Collins vertical control benchmark on the
construction drawings.
Number: 30 Created: 12/27/2005
[12/27/05] We will need a legal description of the emergency access easement shown on
site after hearing for evaluation prior to obtaining a deed of dedication for the easement.
Topic: General
Number: 23 Created: 12/27/2005
[12/27/05] The development is not providing for a 15' utility easement behind the right-of-
way on both Drake and College as is typically required per City standards. The applicant
will need to provide information from all the utilities indicating that they have no objection to
not providing the utility easement corridors.
Number: 24 Created: 12/27/2005
[12/27/05] Should a utility easement be required [related to the previous ID23] private lines
such as the roof drain shown on the north side of the building cannot be located within the
easement.
Department: Light & Power Issue Contact: Rob Irish
Topic: Light & Power
Number: 6 Created: 12/9/2005
[12/9/05) Any modification or relocation of existing electric facilities will be at the owner's
expense.
Number: 7 Created: 12/9/2005
[12/9/05] Transformer on utility plan shows an oval vault. This will need to be a pad -mount
transformer for 3-phase power.
Number: 8 Created: 12/9/2005
[12/9/05] There may be clearance problems for the pad -mount transformer between the
trash enclosure and the underground roof drain. Coordinate this with Light & Power.
Number: 9 Created: 12/9/2005
[12/9/05] Conduit is stubbed somewhere along the northeast corner of the property.
Electrical service from the transformer to the building will be the responsibility of the owner.
Number: 10 Created: 12/9/2005
[12/9/05] Normal development charges will apply. Will need completed C-1 form and One -
line diagram submitted to Light & Power Engineering.
Department: PFA Issue Contact: Ron Gonzales
Topic: fire
Number: 31 Created: 12/27/2005
[12/27/05] Access is appropriate; however, this fire lane must be extended south to join the
frontage road in front of the Walgreen's drug store with the frontage road becoming an
extension of the emergency access easement.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
DESIGN EDGE Date: 01/10/2006
ANDREW LEMMER
1820 15TH AVE. #13
DENVER, CO 80202
Staff has reviewed your submittal for SINCLAIR REDEVELOPMENT, COLLEGE & DRAKE,
THE DRAKE SHOPS PDP - TYPE I, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Marc Virata
Topic: Construction Plans
Number: 19 Created: 12/23/2005
[12/23/05] The demo plan specifies a private light to be removed which is east of a traffic
control box, this is not the case and needs to remain as it's part of the photo radar system.
Number: 20 Created: 12/23/2005
[12/23/05] The demo plan does not indicate the existing photo radar light/camera south of
the previously mentioned light.
Number: 21 Created: 12/23/2005
[12/23/05] The demo plan does not accurately show the location of the overhead electric
tower along Drake Road. It appears on the drawing to be situated in the middle of the
sidewalk but is located further north. This should be revised on all the drawings to make it
more evident that the pedestrian sidewalk path along Drake Road is not as compromised as
it appears.
Number: 25 Created: 12/27/2005
[12/27/05] The horizontal control plan species curb return radii of 13' for the driveway out to
Drake Road. Per LCUASS standards, 20' is required. We may entertain a smaller radii then
standards, but further follow-up is needed.
Number: 26 Created: 12/27/2005
[12/27/05] In checking with the City's Pavement Management Engineer, a mill and inlay will
need to be specified for the entire south side of Drake Road from the patch shown for the
utilities to the east edge of the driveway approach. If the curb can be removed for the
driveway approach without disturbing the pavement, the mill and inlay section can limited to
the utility connections, however the entire street width on the south side of Drake needs to
be shown.
Number: 27 Created: 12/27/2005
[12/27/05] For the north side of Drake Road, the mill and inlay needs to be shown as one
rectangle without the jog currently shown per our street repair standards.
Number: 28 Created: 12/27/2005
[12/27/05] The street repair on College Avenue should be expanded to half the lane width.