HomeMy WebLinkAboutSINCLAIR REDEVELOPMENT, COLLEGE & DRAKE, THE DRAKE SHOPS - PDP - 25-03B - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWo Contact has been established with Gary Schroeder, Energy
Services Engineer, Fort Collins Utilities.
22. The contact at Public Service Company/Xcel Energy is Mr. Len
Hildebrand, 225-7848.
o Excel Energy has been contacted and we are in the process
of coordinating utility services with same.
23. The contact at US West/Qwest is Mr. Bob Rulli, 377-6401.
o Qwest has been contacted and we are in the process of
coordinating utility services with same.
24. As we have discussed in a previous meeting, using materials and colors
that complement the Walgreen's building is highly recommended.
o We are incorporating similar building materials as
Walgreen's. A color rendering and material board will follow.
25. The trash enclosure must be sized to accommodate containers for
recyclable materials. The Department of Natural Resources has provided
a design guideline document that is available on line at
hftp://www.fcgov.com/recycling/enclosures.php. For further information,
please contact Doug Moore at 221-6750.
o Acknowledged
26. A Demolition Permit will be required for the existing Sinclair gas station.
o Acknowledged
and Planning documents (site plan, landscape plan, architectural
elevations and lighting plan) are all signed and recorded, the project is
entitled to proceed with construction, subject to the Development
Construction Permit.
o Acknowledged
19. Be sure that parking stalls are a minimum of 9 x 19. Stalls may be
reduced to 9 x 17 but only if there is a minimum of two foot overhang. If
such overhang is a sidewalk, it must be a minimum of six feet in width.
o Acknowledged and incorporated into the site plan.
20. In addition to the access off Drake Road, ingress and egress to the site
may be gained via two-way (northbound and southbound) travel on the
Frontage Road as per the Agreement between the City and Walgreen's.
This will allow traffic to gain access to South College Avenue at the
Thunderbird Drive intersection. Please note that the Walgreen's plans
indicate a curb bulge -out in the northbound lane of the Frontage Road.
This would have to be removed which means work in the public right-of-
way. There is a question, at this point, as to whether or not the Frontage
Road is CDOT right-of-way, thus requiring a CDOT permit. Engineering
staff will contact CDOT regarding this issue.
o A second point of access has been provided through the
adjacent Walgreen's property to the public Frontage Road
located south of the subject site. It is our understanding that
the Frontage Road is not within the CDOT Right -of -Way and
that this access will not require a CDOT permit. (Civil
Response)
21. For further information on energy conservation, electrical demand
reduction programs and daylighting techniques, please contact Doug
Swartz, Energy Service Engineer, City of Fort Collins Utilities, 221-6700.
There are several recent high -profile buildings that have been constructed
using innovative energy conserving design in collaboration with this
program. These include New Belgium Brewery, Fossil Ridge High School,
Kinard Junior High School, United Way and Value Plastics. You are
encouraged to take advantage of this service. The formal name of the
program is "Integrated Design Assistance Program." The program will
result in a building that is more energy efficient, environmentally
responsible, comfortable and durable than a traditional building. At a
highly visible intersection such as College and Drake, such a building
would no doubt attract additional interest and business for the tenant, as
well as provide significant operational savings on an ongoing basis.
standard utility easements are needed behind the right-of-way along both
streets.
o Per our discussions with Susan Joy of the City Engineering
Department, no additional ROW dedications are required.
14. The closest parking stalls to Drake will have to meet the setback
requirement. This setback is based on the volume of both the street and
the parking lot. At the low end, the setback would be required to be 50-
feet from the flowline. At the high end, the setback would be 100-feet.
This distance is designed to provide sufficient maneuvering area internally
so that cars traveling on Drake Road are not impeded.
o Variance granted to all 50'-0" parking lot set back.
15. Closing the curb cut on College Avenue will require a permit from CDOT.
o The existing access will be closed as depicted on the
accompanying plans. We are in the process of submitting
an application to CDOT for the appropriate permit. (Civil
Response)
16. Please contact Matt Baker, 221-6605, to determine whether or not a repay
is due from the developer to the City for the "local street portion" of the public
improvements along both streets. The local street portion is 4.5 feet of sidewalk
width, curb and gutter and a portion of the travel lane along the frontage of the
property. The City pays for the "oversized portion" of the improvements. The
oversized portion is the balance of the sidewalk width, turn lane, and a portion of
the travel lane.
o Determination if "Repay is due from the developer, to the
City of fort Collins", has yet to be confirmed. Clarification of
this matter is in the process of being resolved.
17. Any existing sidewalk, curb, or gutter that is damaged or in disrepair must
be repaired prior to issuance of Certificate of Occupancy.
o Acknowledged
18. A Development Agreement will be required prior to recording of the plans.
For further information, please contact Susan Joy, Development Review
Engineer, 221-6605. When the Development Agreement, Utility Plans,
volume. A drainage and erosion control summary report has
been provided. (Civil Response)
9. The existing mains are as follows: 8-inch water in College, 8-inch water
and 18-inch sanitary sewer in Drake. Any service line extended to the site
must be used or abandoned at the main. The water conservation
standards for landscape and irrigation will apply. Development fees and
water rights will be due at building permit. Credit will be given for services
in use on the site. For further information, please contact Roger
Buffington, 221-6700.
o The proposed utility services will connect to the existing
mains within Drake Avenue. (Civil Response)
10. Be sure to provide a direct walkway that connects the main entrance of
the building to the public sidewalk.
o Acknowledged
11. A Transportation Impact Study will be required. To determine the scope of
this study and which intersections to analyze, please contact Eric Bracke
or Ward Stanford, 221-6630. Keep in mind that if the T.I.S. is reduced in
scope for vehicles, it must still address other modes of travel such as
pedestrians, bicycles and transit. For further information regarding non -
vehicular modes of travel, please contact Kurt Ravenschlag at 416-2643.
o T.I.S is included with submittal.
12. The Street Oversizing Fee will be based on square footage and trip
generation rate of the proposed use. The City also collects the Larimer
County Road Impact Fee. Please contact Matt Baker, 970-221-6605, for
an estimate of these fees which are payable at the time of building permit
issuance. Please note that fees are adjusted annually based on the
Denver -Boulder consumer price index and that there may be increases in
2006 independent of the C.P.I. (There is information on the Street
Oversizing Fee on the City's web site at www.fcgov.com.)
o Acknowledged.
13. It may be necessary to dedicate any additional public right-of-way for the
two public streets. College Avenue requires 70.5 feet of half -width and
Drake Road requires 57.5 feet of half -width. In addition, 15-foot wide
Current Planning so that they are not located along the roadway, but,
rather, in a less visible location yet within ten feet of hard surface for
emergency change -out. Electrical meters should be on the opposite side
of the building as the gas meters. A utility coordination meeting is
recommended to ensure the proper separation from other utilities. For
further information, please contact Rob Irish, 221-6700.
o C-1 form Attached.
7. This site is in the Spring Creek drainage basin where the new
development fee is $2175.00/acre which is it is subject to the runoff
coefficient reduction. This fee is to be paid at the time a building permit is
issued. If the site is already all impervious then no water quantity
detention would be required. However, water quality will need to be done
to bring the site up to current standards. Typically, an extended detention
water quality pond is required, however since this site is already existing
we will work with you to find alternative BMP measures that can work on
this site.
o An infiltration unit composed of a perforated tank surrounded
with gravel has been proposed at the northeast corner of the
subject site. As discussed with Basil Hamdan on November
14, 2005, this unit has been sized to accommodate a brim-
full water quality capture volume of 40-hours. Smaller
storms will infiltrate into the ground and larger storms will
cause the unit to surcharge. Excess stormwater runoff will
travel to Drake Avenue via overland flow. (Civil Response)
8. If there is an increase in imperviousness greater than 1000 square feet a
drainage and erosion control report and construction plans are required
and they must be prepared by a Professional Engineer registered in
Colorado. A grading plan is required when there is between 1000 and 350
square feet of new imperviousness, but no drainage study. There are no
requirements for less than 350 square feet. A drainage and erosion
control report and construction plans are required and they must be
prepared by a Professional Engineer registered in Colorado. For further
information, please contact Basil Harridan, 221-6700.
o Impervious coverage has been reduced on the subject site
when compared to existing conditions. Therefore,
stormwater runoff detention is not required and has not been
provided for anything larger then the water quality capture
3. A Modification of Standard may be submitted in advance of the Project
Development Plan (P.D.P.) so as to determine the feasibility of the project
prior to a formal submittal. This may be a prudent and cost-effective
method that precedes the formal submittal which would otherwise be
required to meet all the requirements for a P.D.P., including Utility Plans.
Please review Section 2.8 of the Land Use Code which describes the
process and review criteria for a Modification of Standard.
o Modification of standard has been submitted November 10,
2005 hearing date: December 1, 2005 City of Fort Collins.
See Attachment, (Copy of submittal).
4. The site will be served by the Poudre Fire Authority. The building's
address must be clearly visible from either College or Drake. A fire
hydrant capable of delivering a minimum of 1,500 gallons per minute at 20
p.s.i. residual pressure and must be located within 300 feet of the building.
The fire lane through the parking lot must be dedicated as an emergency
fire access easement with minimum turning radii of 25 feet inside and 50
feet outside and must be a minimum of 20 feet wide. The Poudre Fire
Authority also reviews and grants the permit for removal of the
underground gasoline storage tanks. For further information, please
contact Mike Chavez, 221-6570.
o An existing fire hydrant is located at the southeast corner of
the intersection of College Avenue and Drake Avenue and is
within 300-ft of the proposed building. An emergency
access easement has been depicted within the parking lot.
(Civil Response)
5. The site will be served electricity by the City of Fort Collins Light and
Power Department. There are two 4-inch conduits stubbed to the site.
Normal electrical charges will apply. There would be a credit for any
development charges that have already been paid. Any system
modification, such as moving vaults or streetlights will be at the
developer's expense. For an estimate of the 2005 charges, please refer
to the handout.
o Acknowledged.
6. A Commercial One ("C-1 ") Form must be completed by an electrical
contractor to determine entrance capacity for the building. The location of
the electrical transformer must be coordinated with Light and Power and
CONCEPT LETTER RESPONSE:
ITEM: Demolition of the Existing Sinclair Gas Station and
Construction of a New Retail Building at the
Southeast Corner of South College Avenue and
Drake Road.
MEETING DATE: September 12, 2005
APPLICANT: Mr. John Hardy and Mr. John Hauser, Drake Real
Estate Services, 600 17th Street Suite 700 South,
Denver, CO 80202.
LAND USE DATA: Request to demolish the existing Sinclair gas station at the
southeast corner of South College Avenue and Drake Road and build a new
3,600 square foot retail store.
COMMENTS:
The site is zoned C, Commercial. A retail store is permitted subject to
review by the Hearing Officer (Type One Review).
o Acknowledged.
2. The maximum amount of parking is 4 spaces per 1,000 square feet of
gross floor area. At the proposed 3,600 square feet, the project would be
allowed only 14 spaces. The concept plan indicates a total of 30 spaces.
A Modification of Standard would be required to be granted by the Hearing
Officer to allow the proposed number of spaces.
o Modification of standard has been submitted November 10,
2005 hearing date: December 1, 2005 City of Fort Collins.