HomeMy WebLinkAboutSINCLAIR REDEVELOPMENT, COLLEGE & DRAKE, THE DRAKE SHOPS - PDP - 25-03B - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTI
TABLE OF CONTENTS
PACE
ITABLE OF CONTENTS ..................................... ........................................................................... i
1. INTRODUCTION................................................................................................................ I
1.1 Project Description.....................................................................................................1
1.2 Purpose and Scope of Report......................................................................................1
1.3 Design Criteria & Methods.........................................................................................2
2. LOCAL HYDRAULIC ANALYSIS FOR DEVELOPED CONDITIONS ..........................2
2.1 Proposed Sub -basin Descriptions...............................................................................2
2.2 Hydrologic Analysis of the Proposed Drainage Conditions.......................................3
i
3. STORM WATER FACILITY DESIGN...............................................................................5
3.1 Pond Description........................................................................................................5
3.2 Water Quality..............................................................................................................5
4. EROSION CONTROL.........................................................................................................6
4.1 Erosion and Sediment Control Measures...................................................................6
4.2 Dust Abatement..........................................................................................................6
4.3 Tracking Mud on City Streets.....................................................................................6
4.4 Maintenance ............... :................................................................................................ 6
4.5 Permanent Stabilization..............................................................................................6
5. CONCLUSION.....................................................................................................................7
6. REFERENCES..................................................................................................................... 8
APPENDIX A MAPS AND FIGURES
APPENDIX B HYDROLOGIC CALCULATIONS
APPENDIX C WATER QUALITY
APPENDIX D EROSION CONTROL CALCULATIONS
Ii
�. Final Drainage and Erosion Control Report Page i
Drake Shops November 2005
1J
I
I
November 29, 2005
Mr. Basil Hamdan
CITY OF FORT COLLINS
Stormwater Utility
700 Wood Street
Fort Collins, CO 80521
RE: Final Drainage and Erosion Control Report for Drake Shops at Thunderbird
Estates Sixth Subdivision
Dear Basil,
We are pleased to submit to you for your approval the Final Drainage and Erosion Control
Report for the proposed retail building on Lot I of the Thunderbird Estates Sixth Subdivision.
All computations within this report have been completed in compliance with the City of Fort
Collins Storm Drainage Design Criteria dated May 1984, revised April 1997.
We greatly appreciate your time and consideration in reviewing this submittal. Please call if
you have any questions.
Sincerely,
JR ENGINEERING, LLC
Prepared by, Reviewed by,
Joseph C. Sparone Lee Watkins, P.E.
Project Engineer Project Manager
/attachments
I
I
11
FINAL
DRAINAGE AND EROSION CONTROL
REPORT FOR
DRAKE SHOPS
THUNDERBIRD ESTATES
SIXTH SUBDIVISION
Prepared by
JR ENGINEERING
2620 East Prospect Road, Suite 190
Fort Collins, Colorado 80525
(970) 491-9888
Prepared for
Drake Real Estate Services
600 17"' Street, Suite 700 South
Denver, Colorado 80202
November 29, 2005
Job Number 3e480.00
11