Loading...
HomeMy WebLinkAboutSINCLAIR REDEVELOPMENT, COLLEGE & DRAKE, THE DRAKE SHOPS - PDP - 25-03B - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTI TABLE OF CONTENTS PACE ITABLE OF CONTENTS ..................................... ........................................................................... i 1. INTRODUCTION................................................................................................................ I 1.1 Project Description.....................................................................................................1 1.2 Purpose and Scope of Report......................................................................................1 1.3 Design Criteria & Methods.........................................................................................2 2. LOCAL HYDRAULIC ANALYSIS FOR DEVELOPED CONDITIONS ..........................2 2.1 Proposed Sub -basin Descriptions...............................................................................2 2.2 Hydrologic Analysis of the Proposed Drainage Conditions.......................................3 i 3. STORM WATER FACILITY DESIGN...............................................................................5 3.1 Pond Description........................................................................................................5 3.2 Water Quality..............................................................................................................5 4. EROSION CONTROL.........................................................................................................6 4.1 Erosion and Sediment Control Measures...................................................................6 4.2 Dust Abatement..........................................................................................................6 4.3 Tracking Mud on City Streets.....................................................................................6 4.4 Maintenance ............... :................................................................................................ 6 4.5 Permanent Stabilization..............................................................................................6 5. CONCLUSION.....................................................................................................................7 6. REFERENCES..................................................................................................................... 8 APPENDIX A MAPS AND FIGURES APPENDIX B HYDROLOGIC CALCULATIONS APPENDIX C WATER QUALITY APPENDIX D EROSION CONTROL CALCULATIONS Ii �. Final Drainage and Erosion Control Report Page i Drake Shops November 2005 1J I I November 29, 2005 Mr. Basil Hamdan CITY OF FORT COLLINS Stormwater Utility 700 Wood Street Fort Collins, CO 80521 RE: Final Drainage and Erosion Control Report for Drake Shops at Thunderbird Estates Sixth Subdivision Dear Basil, We are pleased to submit to you for your approval the Final Drainage and Erosion Control Report for the proposed retail building on Lot I of the Thunderbird Estates Sixth Subdivision. All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria dated May 1984, revised April 1997. We greatly appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, JR ENGINEERING, LLC Prepared by, Reviewed by, Joseph C. Sparone Lee Watkins, P.E. Project Engineer Project Manager /attachments I I 11 FINAL DRAINAGE AND EROSION CONTROL REPORT FOR DRAKE SHOPS THUNDERBIRD ESTATES SIXTH SUBDIVISION Prepared by JR ENGINEERING 2620 East Prospect Road, Suite 190 Fort Collins, Colorado 80525 (970) 491-9888 Prepared for Drake Real Estate Services 600 17"' Street, Suite 700 South Denver, Colorado 80202 November 29, 2005 Job Number 3e480.00 11