HomeMy WebLinkAboutCAMPUS WEST THEATRE REDEVELOPMENT - FDP - 23-04C - CORRESPONDENCE - (5)[1/17/06] Water quality mitigation is required per conceptual review comments. No water
quality treatment was proposed. The oil separator at the inlet is not mentioned as to what
the purpose is.
Topic: Stormwater-Erosion Control
Number: 182 Created: 9/14/2006
[9/14/06] 1. The plan and the report don't match in the placement of BMP's.
2. It appears some of the drainage is toward City Park Ave, what will protect that street?
3. The plan/report show straw wattles on concrete pans at the pond outlet, this doesn't work
(they float on hard surfaces). Please consider a different BMP here or a combination of
wattle and gravel, etc.
4. There are no calc's, and no surety indication.
Department: Zoning Issue Contact: Gary Lopez
Topic: zoning
Number: 174 Created: 9/7/2006
[9/7/06] No Comments
Once you have addressed the above issues to 'everyone's satisfaction, you will be ready to
proceed with mylars. No additional formal review will be required.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6206.
Sincerely,
JAn H. Aspen
City Planner
Page 5
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: Utility Plans
Number: 31 Created: 1 /18/2006
[9/12/06] Please add another variance: A T encroachment into the ROW for the stairways
off Elizabeth was granted. (Please correct the other variance as redlined).
[6/27/06] Need to be a little more specific in line 48 and list the required setback of 100' and
the granted variance of 50'.
[2/28/061 The variance request has been granted. Please state the variance on line 48 of
the General Notes, cover sheet.
[1/18/06] The parking setback distance from Elizabeth is not being met. Per the volumes in
the parking lot and volumes on Elizabeth the setback is 100 feet.
Department: Engineering Issue Contact: Susan Joy
Topic: Utility Plans
Number: 177 Created: 9/12/2006
[9/12/06] Sheet 9 - Please add the street cut note:
Limits of street cut are approximate. Final limits are to be determined in the field by the City
Engineering Inspector. All repairs to be in accordance with City street repair standards.
Number: 180
[9/12/06] Detail sheet - remove 1606.
Created: 9/12/2006
Number: 181 Created: 9/12/2006
[9/12/06] Sheet 13 - label onsite detail as "onsite" (see redline).
Department: Light S Power Issue Contact: Doug Martine
Topic: Electric Utility
Number: 173 Created: 8/29/2006
[8/29/06] No Comments
Department: PFA
Issue Contact: Carle Dann
Topic: fire
Number: 183
Created: 9/14/2006
[9/14/06] PFA has no additional comments or
concerns at this time.
Department: Transportation Planning
Issue Contact: David Averill
Topic: zoning
Number: 175
Created: 9/12/2006
[9/12/06] No further comments.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 6 Created: 1/17/2006
[9/14/06] Maintenance seems to be an issue, especially for the 4-inch underdrain. A
discussion is needed between the City Stormwater staff and the engineer to develop a
maintenance plan including access and method.
[6/27/06] Reminder comment for final compliance.
[2/28/06] The concept of the underground storm water quality system is approved. At final
design, the best design can be discussed and how maintenance will be achieved.
Page 4
[2/28/06] The variance request for an attached sidewalk along City Park has been granted
PROVIDED THAT the sidewalk width is increased to 8' or the walk must be detached. The
portion of the sidewalk outside of public row must be dedicated either as row or as an
access easement. Pleaserevise all plan sets (including the plat) accordingly.
[1/18/06] Sidewalk on City Park Ave doesn't meet minimum attached width requirement
Attached sidewalks are to be a minimum of 6 feet in width = The minimum width that can be
added to a sidewalk is 4 feet or the sidewalk will need to be rebuilt. With the elimination of
driveways, the new driveway and any curb, gutter and/or sidewalk that maybe damaged it
may make more sense to replace the walk rather than add to it.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 179 Created: 9/12/2006
[9/12/06] Plan sets do not match.
Topic: Pavement Management
Number: 184 Created: 9/15/2006
[9/15/06] From Pavement Management: West Elizabeth was paved in 2005. Triple street
cut fees apply if applicable.
Topic: Plat
Number: 100 Created: 2/28/2006
[9/15/06]
[6/27/06] (Before Hearing) Plat shows the easement but the rest of the plan sets do not.
[2/28/06] (Before Hearing) A drainage easement must be provided where the underground
water quality structure is located and where the storm sewer/manhole is located in the north
east corner of the property. Must be shown on all plan sets.
Number: 146 Created: 6/27/2006
[9/15/06]
[6/27/06] From Technical Services: Boundary and legal close, total area = 2.06 acre, legal
says 2.03.
Number: 147 Created: 6/27/2006
[9/15/06]
[6/27/06] From Technical Services: Note #1 on the plat says "Right of Way' is vacated with
this plat - that CANNOT be done by plat and can only be done by City Council.
From Engineering: If you wish to vacate row, please submit a TDRF application along with
$800 plus a legal description and exhibit. (Is this new?)
Number: 148 Created: 6/27/2006
[9/15/06]
[6/27/06] From Technical Services: How was City Park and West Elizabeth dedicated?
Number: 178 Created: 9/12/2006
[9/12/06] Please update the plat language to current. I can email that to you if you email
me at sjoy@fcgov.com
Page 3
Topic: Landscape Plan
Number: 193 Created: 9/15/2006
[9/15/06] Darken the ghosted existing trees that are to be protected. They hardly read at
all.
Number: 194 Created: 9/15/2006
[9/15/06] On the entry -facing sides of the trash enclosure, please choose a taller shrub or
vine to screen the enclosure better.
Number: 195 Created: 9/15/2006
[9/15/06] There are a couple of places noted on,the landscape plan where you have called
out several Spireas or Russian Sages where one or two will do the trick nicely. See
redlines.
Topic: Architecture Plans
Number: 196 Created: 9/15/2006
[9/15/06] Please provide sample boards or accurate color renderings of all
materials/elevations proposed.
Number: 197 Created: 9/15/2006
[9/15/06] Please add a scale to the elevations.
Number: 198 Created: 9/15/2006
[9/15/06] Please show all elevations of the buildings.
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: General
Number: 29 Created: 1 /18/2006
[9/12/06] Please dimension the 28' width for both driveways and dimension the taper length
to the 26' width (must be 28' wide for at least 25' before tapering to 26').
[6/27/06] (Before Hearing) Now that the building has gone from 3 stories to 2 stories, the
30' EA goes to a 26' EA and drive aisle. However, driveways that serve 12 or more units
need to be a minimum of 28' wide and then may taper back to 26'. Need to be 28' for at
least 25' and then taper from there. The purpose is to allow for a little more room for a car
wanting to turn right exiting the project while another is.waiting to turn left. You may offset
the drive aisle to the right side versus tapering both sides if this helps your site layout. This
comment affects both the City. Park entrance and the Elizabeth Street entrance. Please
update ALL plan sets accordingly.
[2/28/06] (Before Hearing) Per a meeting with PFA, the existing curb cut off Elizabeth will
have to be rebuilt to the 30' width. There may be some room for compromise on the curb
return radii requirement of 25' however. PFA maybe able to defer to the LCUASS, table 8-
2, for curb return radii off a public street. I encourage you to speak with Cade Dann at PFA
as soon as possible.
[1/18/06], Need to show that the existing driveway off of Elizabeth Street aligns with the
proposed drive and is of adequate width. If not it will need to be reconstructed.
Number: 34 Created: 1/18/2006
[9/12/06] The sidewalk on the south side of the driveway on City Park is shown as 7'.
Needs to be 8'.
[6/27/06] Please change the "pedestrian" easement to "access" on all plan sets where the
sidewalk is outside the row.
Page 2
6a STAFF PROJECT REVIEW
Citpof Fort Collins
SCOTT ADDINGTON Date: 09/18/2006
TRADE WIND PROJECT SOLUTIONS LLC
314 RED HAWK DR
FORT COLLINS, CO 80525
Staff has reviewed your submittal for CAMPUS WEST THEATRE REDEVELOPMENT PDP
- TYPE I AND FINAL PLANS, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Anne Aspen
Topic: General
Number: 186 Created: 9/15/2006
[9/15/06] The following departments have no further issues or concerns with the proposed
project: Comcast, Zoning, Building Inspection, Water Conservation and Neighborhood
Services.
Topic: Site Plan
Number: 187 Created: 9/15/2006
[9/15/06] At staff review we discussed the sidewalk conditions at the northwest of the
parking lot. That area needs to be redesigned to be ADA accessible and reasonably level.
The bike racks should be reconfigured to allow for easier movement through here.
Number: 188 Created: 9/15/2006
[9/15/06] Please show the stairs on the backside of the Elizabeth -facing building.
Number: 189 Created: 9/15/2006
[9/15/06] Either recess or reverse the swing of the doors on the south -most units so they do
not impede movement through the sidewalk where it is already pinched due to the stairs.
Number: 190 Created: 9/15/2006
[9/15/06] Consider reconfiguring the ramping scheme north of the stairs to simplify overall
and eliminate the ADA ramp that pinches the through walk. Give me a call if you need more
explanation.
Number: 191 Created: 9/15/2006
[9/15/06] Please show the transformer on the site and landscape plan.
Number: 192 Created: 9/15/2006
[9/15/06] Consider giving the restaurant entry more breathing room by pushing the bike
racks further north. It's pretty tight.