Loading...
HomeMy WebLinkAboutCAMPUS WEST THEATRE REDEVELOPMENT - PDP - 23-04B - DECISION - FINDINGS, CONCLUSIONS & DECISION_ (;c2f;�Lls WPi� ����r�� - �?�'-��rnin,ycP� • G�GdttLC� no Campus West Theatre Redevelopment, PDP Administrative Hearing Findings, Conclusions, and Decision April 24, 2006 Page 9 of 9 SUMMARY OF CONCLUSIONS A. The Campus West Theatre Redevelopment, PDP mixed -use dwellings are permitted in the Community Commercial District, subject to an Administrative Hearing, meeting the procedural requirements located in Division 2.1 - General Procedural Requirements, Division 2.2 - Common Development Review Procedures for Development Applications, and Section 2.4 - Project Development Plan located in Article 2 - Administration. B. The Campus West Theatre Redevelopment, PDP meets the Site Planning and Design Standards in Sections 3.2.1-5, applicability and plat requirements located in Sections 3.1.1 - Applicability and 3.3.1 - Plat Standards, Building standards in Section 3.5 (except the lighting standards mentioned as conditions of approval below) contained in Article 3 - General Development Standards. C. The Campus West Theatre Redevelopment, PDP meets the zone district standards located in Section 4.14 — Community Commercial District, contained in Article 4 — District Standards. DECISION The Campus West Theatre Redevelopment, PDP (#23-04B) is hereby approved by the Hearing Officer with the following condition: In order to receive Final Plan approval, the applicant shall modify the design to address the standards contained in Sections 3.2.2 (D)(3)(d) Access and Parking Lot Requirements, Lighting; Section 3.2.4 Site Lighting, and Section 3.5.1(J) (2) (5) Operational and Physical Compatibility Standards. Dated this 28t' day of April, 2006, per authority granted by Sections 1.4.9(E) and 2.1 of the Land Use Code. 'ray City Planner Campus West Theatre Redevelopment, PDP Administrative Hearing Findings, Conclusions, and Decision April 24, 2006 Page 8 of 9 "The Community Commercial District provides a combination of retail, offices, services, cultural facilities, civic uses and higher density housing. Multi -story buildings are encouraged to provide a mix of residential and nonresidential uses. Offices and dwellings are encouraged to locate above ground floor retail and services. The proposed project is a three-story mixed -use building that wraps the corner of Elizabeth Street and City Park Avenue and a two-story residential building behind. A single -tier parking structure is located between the buildings, interior to the site. The project fits with the vision of the Campus West Community Commercial District Planning Study Report and the intent of the zone district. The project will be a much needed aesthetic improvement for the area and will hopefully lay the groundwork for future redevelopment in the area. B. Permitted Land Use: Mixed -use dwellings are permitted in the Community Commercial District, subject to a Type I — Administrative Hearing. C. Development Standards: 1) Site Planning [Section 4.14 (E)(1)]—The configuration of shops in the proposed project orients toward the public sidewalks along Elizabeth Street and City Park Avenue and toward a pedestrian connection with the structured parking in the interior of the site. All public entries to retail shops have been altered to open onto the street side. Ample useable outdoor spaces have been provided. Block Requirements [Section 4.14 (E) (2)]—Two buildings and a small parking structure will sit on a single replatted lot, on an existing block. More than 50% of the lot frontage on both Elizabeth Street and City Park Avenue consists of building facades and useable outdoor spaces. . The proposed buildings are 40 feet tall, greater than the 20 feet minimum height and less than the five -story maximum. This proposed mixed -use project represents a good example of meeting the intent of the Community Commercial District standards. This type of redevelopment will foster additional change in the area along with higher quality design improving the aesthetics of the Campus District. The site, building design and landscaping collectively will result in an upgrade to this redeveloped site and District as a whole. Campus West Theatre Redevelopment, PDP Administrative Hearing Findings, Conclusions, and Decision April 24, 2006 Page 7 of 9 Final Plan review to enhance the walkway out to City Park Avenue as well. Building B meets the setback minimum standards. 7) Mixed -use, Institutional and. Commercial Building Standards [Section 3.5.3]—Building A is a mixed -use building which fronts on W. Elizabeth . Street and City Park Ave with connecting walkways along both frontages. Both frontages are extended to the build -to lines, though the City Park Avenue frontage is set back twenty-five feet instead of fifteen feet to accommodate outdoor seating areas. A single, large dominant building mass has been avoided in both proposed buildings. Numerous changes in mass break up the volumes and are integrally related to entries, building structure and the organization of space. The proposed project contributes to the uniqueness of the Community Commercial zone district and sets a higher bar for future residential and mixed -use projects in the area. The design's emphasis on pedestrian spaces, outdoor experience and more urban streetscape are tailored to this site both in terms of its immediate context and its wider context within the zone district. All facades exceed the minimum wall articulations. Walls have clearly defined bays, multiple changes in plane, materials and texture, arcades, awnings and porticos. All sides of each building have high quality materials consistent with the front facade. Primary building entrances are recessed into the building mass or feature a foyer and are covered with either an awning or portico. All buildings have been designed with appropriate base and top treatments including copper cladding cornices and sandstone bases. This proposed project, aside from the conditions listed above, represents a good example of meeting or exceeding the applicable general development standards. While it is recognized that there is a general lack of public parking in the Campus West area, as evidenced by testimony provided at the hearing, this project is providing sufficient levels of parking for both new residents and commercial uses on -site. The bigger picture question of a lack of adequate parking west of campus is long-standing and will need to be addressed, not on a case by case basis, but more holistic in nature, involving partnerships with the public and private sectors. 5. Article 4 - District Standards: Compliance with Applicable CC —Community Commercial District Standards A. Purpose: The purpose of the Community Commercial District is as follows: Campus West Theatre Redevelopment, PDP Administrative Hearing Findings, Conclusions, and Decision April 24, 2006 Page 6 of 9 for future projects. It transitions appropriately from the existing neighborhood to the south in terms of height and massing. The elevations are broken down into roughly twenty-five foot bays, a fine grain that blends well with the existing residential behind and commercial across the street. The project sets an enhanced standard for future redevelopment with its generous use of brick, stone, commercial display windows and metal detailing. 2) Privacy Considerations [Section 3.5.1 (D)]—The project is quite urban in nature, however zones of semi -private and public have been established relatively effectively both at the perimeter of the project in the outdoor seating and planting areas and around the townhouses in the "yards". The mixed -use nature of the site provides some natural settings for interaction among neighbors in a public space. There are also some outdoor private to semi -private spaces in the form of balconies. 3) Building Materials [Section 3.5.1 (E)]—Both the materials and colors proposed blend well with existing materials and colors and set an enhanced standard for future redevelopment. Clear glass is used in all commercial storefront windows and residential fenestration. 4) Outdoor Storage Areas/Mechanical Equipment [Section 3.5.1 (1)]—All trash and recycling areas are at least 20 feet from public walks and are screened from view according to Section 3.2.5 of the Land Use Code. All HVAC equipment will be reviewed for compliance in the Final Plan Review process. Loading and delivery will be accommodated as it is elsewhere in the Campus West area. 5) Operational/Physical Compatibility Standards [Sectiion3.5.1 (J) (2) (5)] - The lighting maximums shown on the Plans are too high for a low -density residential project in the context of an adjacent residential area. The following conditions may be imposed upon the approval of the development application to ensure that new development will be compatible with existing neighborhoods and uses, including, but not limited to, restrictions on glare, light intensity and hours of operation. The fixtures listed in the drawings submitted will need to all have down -directional, full cutoff and fully shielded specifications. In addition, the electric photometric plans will need to be redesigned to show the applicable reduced lighting levels along the periphery of the site (see conditions of approval at the end if this decision). 6) Residential Building Standards [Section 3.5.2]—these standards apply to Building B on the south of the property. These units have entries on a connecting walkway to W. Elizabeth St. and provisions will be made in Campus West Theatre Redevelopment, PDP Administrative Hearing Findings, Conclusions, and Decision April 24, 2006 Page 5 of 9 prevent spillover onto residential uses. The standards in Section 3.2.4 (outlined below) are also not met, [Section 3.2.2 (D)] g. The parking lot is designed with clear and logical circulation routes for vehicles, bicycles and pedestrians. The vehicle routes are striped for clarity; the pedestrian routes have special paving at drive aisle crossings and the bike lanes on W. Elizabeth are striped. All landscaped islands are defined with curbs [Section 3.2.2 (E)] h. Required parking setbacks are met. i. Based on the submitted plans, this project will need to provide a minimum of 62 parking spaces for the residential units and a maximum of 119 commercial spaces. 62 residential spaces are provided off-street in the surface and structured parking, and 24 commercial spaces are provided off-street in the surface and structured parking which meets the requirement. There is no on - street parking. [Section 3.2.2 (K)] j. Five handicap parking spaces are provided according to Code. [Section 3.2.2 (K)(5)(d)] k. The parking dimensions indicated on the plans meet the minimum dimensions required. The surface parking spaces are dimensioned for overhang into the landscaped area as allowed by Code. [Section 3.2.2 (L)] 3) Site Lighting [Section 3.2.4]—Proposed site lighting does not meet our lighting standards. Light sources are not concealed and do not feature full shielding or sharp cutoff features, so they will add glare. The hearing officer in reviewing the staff report and submitted drawings concurs with staffs conclusion that the proposed lighting does not meet the lighting standards found in LUC Sections 3.2.2 (D) (3) (d), 3.2.4, and 3.5.1 (J) (2),(5). Therefore, a corresponding condition of approval is part of this decision. The lighting levels are too high on -site and along the periphery of the project that could have an adverse impact on the new residents living in the buildings adjacent to the proposed parking structure and existing residents living nearby. Optional fixtures and design need to be considered to meet applicable LUC standards prior to final approval. 4) Trash and Recycling Enclosures [Section 3.2.5]—the trash enclosures have been sized appropriately to accommodate trash and recyclables. C. Building Standards — [Division 3.5] 1) Architectural Character, Building Size, Mass and Scale [Section 3.5 (B) and (C)]—the design of the project sets an enhanced standard of quality Campus West Theatre Redevelopment, PDP Administrative Hearing Findings, Conclusions, and Decision April 24, 2006 Page 4 of 9 sixteen square feet. Street trees on City Park are placed ten feet behind the attached sidewalk. Sight distance triangles are maintained at the driveway intersections. Existing trees on Elizabeth Street will be protected. Screening of parked cars from the residential neighbor to the south and the commercial neighbor to the east will be achieved with a new six-foot high wood privacy fence and mixed plantings of shrubs and ornamental trees. Standards have been met and exceeded for interior parking lot landscaping. 2) Access, Circulation and Parking [Section 3.2.2] a. Development Standards: [Section 3.2.2 (C)]—Safety Considerations: Pedestrians, bicycles and vehicles are separated to a large extent in this project. There is an internal drive aisle for vehicular access with a five-foot sidewalk to connect to the residences in Building B. An enhanced crosswalk is provided at the intersection of the east drive aisle and the east entrance to the parking structure. There are existing bike lanes along W. Elizabeth Street. Pedestrian striping will be provided across the intersection of the south entrance and vehicular ramp at the south drive aisle at the Final Plan submittal per a staff review conversation before the hearing. b. Curb cuts and ramps are provided throughout the site. [Section 3.2.2 (C)(2)] c. The design includes convenient parking facilities for bicyclists and ramps and walkways for clear and direct access to all entrances. The bike racks on W. Elizabeth will be moved during Final Plan so that they are level with the public sidewalk. [Section 3.2.2 (C)(4)] The bike lanes on W. Elizabeth Street have been recently improved by a capital improvement project. d. The crossing at the east entrance to the parking structure is shown as an enhanced crosswalk with stamped concrete. This access route will be the primary connection for residents of Building B and meets the connecting walkway standard. Additional striping will also be added at the south crossing of the drive aisle to provide an extra level of safety at that intersection. [Section 3.2.2. (c)(5)(b)] e. A Transportation Impact Study was performed and submitted with this proposal. [Section 3.2.2(c)(8)] f. All off-street parking spaces have unobstructed access to and from public streets. All off-street parking is contained onsite. All parking surfaces are either asphalt or concrete. Light fixtures proposed for the parking area do not meet the standard in Section 3.2.2 (D) (3) (d) that they shield the source of light from sight and Campus West Theatre Redevelopment, PDP Administrative Hearing Findings, Conclusions, and Decision April 24, 2006 Page 3 of 9 FACTS AND FINDINGS 1. Compatibility with Surrounding Uses: The surrounding zoning and land used are as follows: N: CC: Existing restaurant and retail (McDonald's and the Patterson Building) E: CC: Existing commercial (Campus West Self Serve Car Wash and John XXIII University Center) S: CC: Existing single family house and undeveloped land (John XXIII University Center) SW: MMN: Existing multi -family residences (Matador Apartments) W: CC: Existing commercial and retail (West Liquor Depot) NW: CSU: Campus Housing A portion of this property (the old Campus West Theatre) went through an entitlement process through the City as two Project Development Plans called Brazil '99 and Brazil 2004. Recently, the property was sold to TNC Holdings, LLC and they also acquired the corner lot (the old Schrader's gas station and Corner Store). Neighborhood meetings were not required for this project. No written comments or phone calls from the public have been received by the Planner on this project. The project has had a sign posted and this hearing was noticed properly. 2. Article 2 - Administration: This Subdivision, PDP complies with the applicable requirements of the LUC, specifically the procedural requirements located in Division 2.1 - General Procedural Requirements, Division 2.2 - Common Development Review Procedures for Development Applications, and Section 2.4 - Project Development Plan in Article 2 - Administration. 3. Article 3 — General Development Standards A. Site Planning and Design Standards [Division 3.2] 1) Landscaping and Tree Protection: [Section 3.2.1]—The Project Development Plan provides full tree stocking, street trees, landscaped and hardscape areas throughout the project. Street trees on Elizabeth are placed at 30-40 foot intervals in tree grates that are greater than Campus West Theatre Redevelopment, PDP Administrative Hearing Findings, Conclusions, and Decision April 24, 2006 Page 2 of 9 NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established no controversy or facts to refute that the hearing was properly posted, legal notices mailed and notice published. PUBLIC HEARING The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the hearing at approximately 7:00 p.m. on April 23, 2006 in Conference Room A at 281 N. College Avenue, Fort Collins, Colorado. HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE: The Hearing Officer accepted during the hearing the following evidence: (1) Planning Department Staff Report; (2) application, plans, maps and other supporting documents submitted by the applicant and the applicant's representatives to the City of Fort Collins; and (3) a tape recording of testimony provided during the hearing; and (4) a sign up sheet of persons attending the hearing. The LUC, the City's Comprehensive Plan (City Plan), and the formally promulgated policies of the City are all considered part of the evidence considered by the Hearing Officer. The following is a list of those who attended the meeting: From the City: Anne Aspen, City Planner From the Applicant: Scott Addington, Project Manager Dan Tweeton, Construction Contractor From the Public: John Musa, Business owner near site Written Comments: None City of Fort Collins Commux. Planning and Environmental S Current Planning ices CITY OF FORT COLLINS ADMINISTRATIVE HEARING OFFICER TYPE I ADMINISTRATIVE HEARING FINDINGS, CONCLUSIONS AND DECISION ADMINISTRATIVE HEARING DATE: PROJECT NAME: CASE NUMBER: OWNER: APPLICANT: HEARING OFFICER: PROJECT DESCRIPTION: April 24, 2006 Campus West Theatre Redevelopment, Project Development Plan #23-046 Scott Addington Trade Wind Project Solutions, LLC 314 Red Hawk Drive Fort Collins, CO 80525 Randy Meyers TNC Holding, LLC 2620 E. Prospect Road, Suite 100 Fort Collins, CO 80524 Pete Wray Senior City Planner This is a request to redevelop a now vacant 2.06 acre (89,859sf) site into a two -building mixed -use development with 37 residential units and approximately 14,265 square feet of commercial space. The property is located on the southeast corner of W. Elizabeth Street and City Park Avenue, the former site of the Campus West Theatre and Schrader's Gas Station. SUMMARY OF HEARING OFFICER DECISION: ZONING DISTRICT: STAFF RECOMMENDATION: Approval with Conditions CC - Community Commercial District. Approval with Exceptions 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020