Loading...
HomeMy WebLinkAboutECKERD DRUG, COLLEGE & DRAKE - PDP/FDP - 25-03 - CORRESPONDENCE -Department: Engineering Contact: Katie Moore . Number 62 (12/03/03) Why did the right-of-way dedication along Timberline change from 10.5 feet to 15.5 feet? According to the previous calculation, 10.5 feet was sufficient. Did something change? The plat should indicate a 10.5 foot dedication along Timberline Road. The site plan shows the dedication correctly. Number 63 (12/03/03) Did a C.A.D. layer get turned off? The plat is now missing the 10-foot Public Service Company easement and the 20-foot PSCo easement as well. Number 64 (12/03/03) Some of the lines are too light to be reproduced or scanned. Please be sure that all line weights are sufficient on the mylars for both reproducing and scanning. The plat needs to indicate that the parcel is "Lot One" and provide the square footage of the entire lot, not the building envelope. Be sure to indicate exterior building materials and color on the architectural sheet. We are ready for signed mylars. For the plat, be sure to submit a total of three mylars — one original and two copies. Be sure and return all of your redlined plans when you re -submit. As always, if you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: f / Ted Shepard Chief Planner Page 2 STAFF PROJECT REVIEW City of Fort Collins VF RIPLEY ASSOC. Date: 12/18/2003 AMYJOHNSON 401 W MOUNTAIN AVE. #201 FT. COLLINS, CO 80521 Staff has reviewed your submittal for HORSETOOTH EAST BUSINESS PARK, CARRIAGE AUTO SERVICE SHOP - TYPE II (LUC) AND FINAL PLAN, and we offer the following comments: Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 65 Created: 12/11 /2003 Please revise water quality outlet structure per redline on sheet 6. Department: Stormwater Utility Topic: Erosion Control Number: 66 [12/16/03] Third Review December 15, 2003 Issue Contact: Basil Harridan Created: 12/16/2003 Please provide an erosion control surety calculation. Some of the proposed construction is outside your proposed silt fencing and downstream (the detention area). How do you propose to account for this construction in your plan? Part of the site slopes to the north and/or northeast. What do you propose for the protection of the north drive? Your note # 9 states that gravel filters are to be installed on all inlets. Where is this? Your note # 11 calls for the straw bales to be installed immediately following grading. Where is this? Your note #12 calls for seeding all disturbed areas "as described in the Grading and Erosion Control notes on this sheet." What notes? Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 67 Created: 12/18/2003 [12/18/03] No comments Page 1