Loading...
HomeMy WebLinkAboutSHOPKO P.U.D., PAD B - FDP - 28-03A - CORRESPONDENCE -• '. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, Steve Olt, City Planner cc: Susan Joy, Engineering The Architects Studio Current Planning File #28-03 Page 4 Department: Stormwater Utility Issue Contact: Basil Hamdan Topic: Easements Number: 67 Created: 1/15/2004 [1/15/04] Please provide a copy of the private line easement dedication for the line that goes between the two buildings. The area covered by the detention pond should be encompassed within a public easement, any old drainage easement that is no longer needed from the original plat should be vacated. These can be done by separate document. Topic: Erosion Control Number: 66 Created: 1/15/2004 [1/15/04] Please provide erosion control efficiency calculations and erosion control security calculations in the report. Topic: Phasing Plan Number: 68 Created: 1/15/2004 [1/15/04] Please show the phasing of the buildings on the grading plan or provide a separate phasing plan. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Utility Plan Number: 34 Created: 8/27/2003 [1/13/04] [10/27/03] The existing water service which occurs in our mapping system can not be located in the field. Therefor a new service will need to be extended into the building on the southwest portion of this project. Provide utility easements for all water service lines up to and including the curd stops. See site, landscape and utility plans for other comments. Please check with me to see if another round of paper copies review is necessary or if you can submit mylars as the next step. Be sure and return all of your redlined plans when you re -submit the required documents. PauC - 0 separate document. It may be helpful to prepare an easement exhibit showing what's existing and what's proposed so that we can keep it all straight. You will want to vacate the portion of the existing utility easement that is no longer needed, however, that can not be done until the new easement is dedicated and the new line installed. Number: 24 [1/6/04] Repeat. Created:8/26/2003 (10/28/03] This sheet will need to show phasing. (08/26/03) Sheet 6 - Phasing? Number: 26 Created: 8/26/2003 [1/6/04] Looks great .... still need detail 707 and you're done. [10/28/03] Sheet 9 was not included with this submittal. Comment remains open. (08/26/03) Sheet 9 and 10 - Provide details 707, 1601, 1603, and 1606. Please label all non-standard on -site curb and gutter details as "on -Site". Department: Light & Power Topic: Light & Power Number: 1 [1/15/04] Issue Contact: Doug Martine Created: 8/4/2003 [10/20/03] The power source to this site will be from the S.W. corner of the site. The developer will need to coordinate transformer location(s) with Light & Power Engineering. Transformer(s) will need to be a minimum of 3 ft. from any structure and have a minimum of 8 ft. of clearance to the front side of the transformer. The transformers) also must be within 10 ft. of a paved surface for line truck access. Page 2 t 'it% of Fort Cullin5 6 mmmmrr STAFF PROJECT REVIEW Doberstein Lemburg Commercial, Inc. Date: 1/21/2004 c/o Dan Bernth 702 West Drake Road Building E, Suite B-102 Fort Collins, CO. 80526 Staff has reviewed your submittal for SHOPKO PUD, PAD B - FINAL PLAN, and we offer the following comments: ISSUES: Department: Engineering Topic: General Number: 65 Issue Contact: Susan Joy Created:1/6/2004 [1/6/04] Site/Landscape/Utility - Relabel the private use easement to show that the easement is private north of the utility easement and public south of the utility easement. See the redlines on the Site Plan - I color -coded the easement so that it is more clear. Topic: Utility Plan Number: 21 Created: 8/26/2003 [1/6/04] I think its safe to submit all the legal docs for the proposed easements now that we've reached an agreement on what is required. Please provide an overall exhibit along with the individual exhibits so that we can make sure we've got everything covered. Just a reminder, the private easement is private north of the utility easement and becomes a public easement on the south side of it. See the redlines. Please see the Site Plan redlines - I highlighted what should be public and what should be private. [10/28/03] Sheet 4 is missing portions of the existing storm sewer easement. Please submit all easement dedications and vacations by separate document along with the appropriate exhibits. It may be helpful to submit an overall exhibit sheet (8.5x11) showing all the existing and proposed easements. (08/26/03) Show and label all existing and proposed utility easements, both on and off -site. Please dedicate additional utility and drainage easements by Page 1 • • To: d� PXXveAo., CURRENT Affiliation: VoV, CCWjAkerC�' PLANNING Phone #: FACSIMILE Fax #: 22(- (G1(p(v— G �a Re: GJ�l9 jko �'%8� j .. �bt1 (�.r b, L ce aG —' .._t(MWOMMI Date: t / 2$/D Pages: G) City of Fort (including this cover sheet) M red• :0.j 4j.'� -Urgent =your-ReplyASAP ;.Please Comment Steve Olt, City Planner Direct Phone: 970.221.6341 E-mail: solt@fcgov.com City of Fort Collins Current Planning 281 North College Avenue Fort Collins. CO 80524 Phone: 970.221.6750 Fax: 970.416.2020