HomeMy WebLinkAboutSHOPKO P.U.D., PAD B - PDP - 28-03 - CORRESPONDENCE - REVISIONS (3)Police
General
63- For internal security reasons, we prefer not to have a window in the rear service door. Nevertheless, there are
windows that exist in the back elevation and the policeman can view into the building.
Water Wastewater
General
54- Site plan, Landscape plan, and civil plans are coordinated to reflect the same information.
Page 2 of 2
Architecture
Planning
151 West Mountain Avenue Fort Collins, Colorado 80524 970-482-8125 FAX 970-482-845C
Y
memo
To: Dan Bernth Date: Friday, December 05, 2003
702 West Drake Road
Building E, Suite B-102
Fort Collins, CO 80526
Project: Tract B, Shopko P.U.D. Re: City Comments Project No.: 03168.1
Response
From: Oussama Abbas Sent Via: Deliver Fax No.:
No. of Pages:
CC: Attachments:
Current Planning
Buildings
59- Wall mounted lights are shown on the elevations representing the photometric plan
60- The retaining walls are joined with the building elevation.
Lighting plan
6 1 - Refer to response # 59
Site plan
55- Bike rack between building 1&2 is labeled.
Engineering
General
27- Title is corrected.
Utility plan
37- No structure of any kind (foundation / footing, etc) will be in the utility easement. The columns on the south
side of building 2 will have a straight foundation (not projecting in the utility easement).
Light and Power
Light and Power
1- 2 transformers have been located on both ends of the buildings. Transformer location takes into consideration
the clearance criteria. Landscape is used to screen the transformers.
\\Carr\CB DocumentsTROJECTS Pctive\Shops ® Shopco\city comments
Architecture response 2.doc
Planning
151 West Mountain Avenue Fort Collins, Colorado 80524 970-482-8125 FAX 970-482-8450
December 5, 2003
The Architect's Studio
151 West Mountain Ave.
Fort Collins, CO 80524
RE: Project No. 2305: Shopko P.U.D., Tract B
Dear Oussama,
L mbnipr.-In ba"(mr
F.{ninrrriuq
fin•in"Im.,lld(6 6rmnumtly Plano{q
The following represents our responses to the Landscape Plan comments. Please find the
attached revised Final Compliance Landscape Plan for submittal.
Current Planning Comments
Landscape
56.
Discrepancies between the Landscape Plan and the Plant Schedule have been adjusted &
corrected.
57.
The utilities (computer layer) are not shown on the submitted Final Compliance Plan.
58.
Proposed storm sewers are labeled on the Landscape Plan. The storm sewer and Phase
Boundary line designations have been modified for clarity.
Engineering
General
27.
The Project Title has been changed to Shopko P.U.D., Tract B on the Landscape Plan.
Sincerely,
64%
Matthew J. Blakely, ASLA
Project Landscape Architect
Jim Sell Design, Inc.
cc: file
E NPROJECT FILESLLARCFK=5 TAS -PAD BAT SNOPKON00=005-RESUBMITRTC11-140.1OOC
)IM SELL DESIGN, INC. 153 WEST MOUNTAIN AVENUE FORT COLLINS, COLORADO 80524 970 484,1921 FAX: 970484.2443 JIMSELLOESIGN.COM