City of Fort Collins
Current Planning
PROJECT
COMMENT SHEET
DATE: July 30, 2003 TO: Xcel Energy
PROJECT: #28-03 SHOPKO P.U.D. PAD B — TYPE I (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
August 27, 2003
Note - PLEASE identify your redlines for future reference
• XCEL HM A L" FF_ �rPr'_ MAIN AL!)'t0 Tt i= EA.17 SSE OF
SOttM F KFI.INf•.bY Pk1.JY RICO WILL AE.Eb TD EXrfNn
GH1 hIRIN ACROSS S_F KFMLIEQY TD SERVi PR0PVif-A- PRU713-T.
• NO 7REEI PLAN T Ei) WITH IN 4 FEET OF ANW GA`_ LIMES.
v PSCO NEF_03 MINIMUM 9 ' UTILI rY EASCI,1 117-o 9 . UT1LI Tr EATEMENI-
/S NOT AbEOUXTE /F OTHER 1.ITILITIEf i( TELE ,CRLLE , E.1EC, LTC)
I QUIF1' C,MT IS LOCRTZ-0 W1 TH IN TlttS i ` r&Tct7ENT_
RECEIVED
AUG 2 8 2003
CURRENT PLANNING
LEN Nl113lR!?RAll6 X8 7-03
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
✓flat _ lte _Drainage Report _Other
P' tility _Redline Utility �dscape
REVISION
COMMENT SHEET
DATE: October 15, 2003 TO: Excel Energy
PROJECT: #28-03 SHOPKO P.U.D., PAD B — TYPE I (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
October 29, 2003
❑ No Comment
[•— Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
.S/4�'4l= COMs,-��7/sjtt qR'�c�! r=kor•� k-��f.�'3
LFrt /1r A/i/Q
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ate
at v_Site _Drainage Report _Other `� `"
4
�ity _Redline Utility _Landscape �"
City of Fort Collins
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6341.
Yours Truly, �L}—
aave..D
Steve Olt
City Planner
cc: Susan Joy
The Architects Studio
Page 6
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Genera/
Number: 54 Created: 10/27/2003
[10/27/03] Coordinate site and landscape plans with the civil plans to reflect the same
information.
See site, landscape and utility plans for other comments.
Topic: Utility Plan
Number: 32 Created: 8/27/2003
[10/27/03] Maintain 4 feet minimum separation between meter pit and all permanent
structures (i.e. building envelope, trash enclosure, retaining walls, etc.). Place meter
pits and curb stops adjacent to the main when possible.
Number: 33
Created: 8/27/2003
(10/27/03]
(10/20/031
The power source to this site will be from the southwest corner of the site. The
developer will need to coordinate transformer location(s) with Light & Power
Engineering. Transformer(s) will need to be a minimum of 3 ft. from any structure and
have a minimum of 8 ft. of clearance to the front side of the transformer. The
transformer(s) also must be within 10 ft. of a paved surface for line truck access.
Number: 34 Created: 8/27/2003
[10/27/03]
Provide utility easements for all water service lines up to and including the curd stops.
See site, landscape and utility plans for other comments.
Len Hilderbrand of Xcel Energy (Public Service) indicated that his same comments
from 8/7/03 still apply to this development proposal. A copy of those comments is
attached to this comment letter.
This item is scheduled for an administrative public hearing on November 17, 2003.
Responses and revisions to these latest comments may be addressed with your Final
Compliance (FC) submittal to the City. If done at FC (not as revisions to the POR
please contact me to determine the submittal requirements. Be sure and return all of
your red -lined plans when you submit.
Page 5
a
Department: Stormwater Utility
Topic: Easements
Number: 25
Issue Contact: Basil Hamdan
Created: 8/26/2003
[10/28/031
Need to vacate the existing storm drainage easements where the storm line is being
removed and dedicate a new easement for the relocated line. Provide an easement
vacation and dedication exhibit.
Topic: Eroding plans
Number: 30 Created: 8/26/2003
[10/28/031
Pond area must be contained outside of the public easements.
(10/20/03]
The power source to this site will be from the southwest corner of the site. The
developer will need to coordinate transformer location(s) with Light & Power
Engineering. Transformer(s) will need to be a minimum of 3 ft. from any structure and
have a minimum of 8 ft. of clearance to the front side of the transformer. The
transformers) also must be within 10 ft. of a paved surface for line truck access.
Topic: Utility Plans
Number: 28 Created: 8/26/2003
[10/28/031
Please move manhole so that it is outside of the easement.
The storm sewer manhole along Boardwalk Drive is located in an area that is typically
used by Light and Power for their line (behind the walk). Please check with Light and
Power to make sure that this location is OK for them. If the manhole is kept at that
location, then the lid needs to be offset to keep it away from the walk. The line along
JFK could also conflict with gas lines. A utility coordination meeting might be helpful
to clarify these issues.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 64 Created: 10/28/2003
[10/28/03] No further comments.
Page 4
Number: 37 Created: 9/2/2003
[10/28/03] No structure of any kind (foundations/footings, etc) are allowed in the
utility easements - it appears that the building to the west may be too close to
the proposed utility easement. The building will need to be moved to the north
slightly so that no part of the building/footings lie with the proposed utility
easement.
No private structures such as storm sewer lines, private easements or detention
ponds are allowed in the utility easements. Per a discussion between
Stormwater/Engineering/Northstar after Staff Review 10/29/03, it was
agreed that because of site constraints that the storm sewer will become a
public line once it crosses the proposed utility easement. However, the line
must be maintained by the developer, not the City. The 10" line for the roof
drainage will be rerouted so that it does not fall within the public utility
easement. The detention pond, however, will not be allowed in the utility
easement and needs to be slightly re -graded.
(09/02/03) No structure of any kind allowed in utility easements.
Number: 62 Created: 10/28/2003
[10/28/03] Sheet 4 - Show the existing gas line.
Department: Light & Power Issue Contact: Doug Martine
Topic: Light d Power
Number: 1 Created: 8/4/2003
[10/20/031
The power source to this site will be from the southwest corner of the site. The
developer will need to coordinate transformer location(s) with Light & Power
Engineering. Transformer(s) will need to be a minimum of 3 ft. from any structure and
have a minimum of 8 ft. of clearance to the front side of the transformer. The
transformers) also must be within 10 ft. of a paved surface for line truck access.
Department: Police Issue Contact: Joseph Gerdom
Topic: 6eneroi
Number: 63 Created: 10/28/2003
[10/28/03] Exterior, employee, doors should contain a small shatter resistant view
port.
Page 3
Topic: Site Plan
Number: 55 Created: 10/28/2003
(10/28/03] The bike rack between Buildings 1 & 2 should be labeled.
Department: Engineering
Topic: General
Issue Contact: Susan Joy
Number: 27 Created: 8/26/2003
[10/28/03] All plan sets must be titled as: Shopko PUD, Tract B
(08/26/03) The Project Title on all plan sets do not match the Project Title on DMS.
Topic: Utility Plan
Number: 21 Created: 8/26/2003
[10/28/03] Sheet 4 is missing portions of the existing storm sewer easement. Please
submit all easement dedications and vacations by separate document along with
the appropriate exhibits. It may be helpful to submit an overall exhibit sheet
(8.5x11) showing all the existing and proposed easements.
(08/26/03) Show and label all existing and proposed utility easements, both on and
off -site. Please dedicate additional utility and drainage easements by separate
document. It may be helpful to prepare an easement exhibit showing what's existing
and what's proposed so that we can keep it all straight. You will want to vacate the
portion of the existing utility easement that is no longer needed, however, that can not
be done until the new easement is dedicated and the new line installed.
Number: 23 Created: 8/26/2003
[10/28/03] See redlines.
(08/26/03) Sheet 5 - Correct overlapping labeling.
Number: 24 Created: 8/26/2003
(10/28/03] This sheet will need to show phasing.
(08/26/03) Sheet 6 - Phasing?
Number: 26 Created: 8/26/2003
[10/28/03] Sheet 9 was not included with this submittal. Comment remains open.
(08/26/03) Sheet 9 and 10 - Provide details 707,1601,1603, and 1606. Please label
all non standard on -site curb and gutter details as "on -Site".
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
Doberstein Lemburg Commercial, Inc. Date: 11/6/2003
c/o Dan Bernth
702 West Drake Road
Building E, Suite B-102
Fort Collins, CO. 80526
Staff has reviewed your submittal for SHOPKO PUD, PAD B - TYPE I (LUC), and we
offer the following comments:
ISSUES:
Department: Current Planning
Topic: Buildings
Issue Contact: Steve Olt
Number: 59 Created: 10/28/2003
[10/28/03] Several wall -mounted lights are not shown on the Building Elevations that
are represented on the Site Photometric Plan (see red -lined Elevations from Current
Planning).
Number: 60 Created: 10/28/2003
[10/28/03] Why have the retaining walls been separated from the buildings in
elevation view (south, east, and southeast elevations)?
Topic: Landscape Plan
Number: 56 Created: 10/28/2003
[10/28/03] There are few minor plant material discrepancies on the plan and in the
Plant Schedule (see red -lined Landscape Plan from Current Planning).
Number: 57 Created: 10/28/2003
[10/28/03] The utilities (computer layer) should be taken off the Landscape Plan when
the Final Compliance plan is submitted.
Number: 58 Created: 10/28/2003
[10/28/03] The storm sewers should be labeled on the plan. There may be some
confusion because the storm sewer line designation is the same as the Phase Boundary
line.
Topic: Lighting Plan
Number: 61 Created: 10/28/2003
[10/28/03] There are several wall -mounted lights shown on this plan that do not
appear on the Building Elevations.