HomeMy WebLinkAboutSHOPKO P.U.D., PAD B - PDP - 28-03 - CORRESPONDENCE - (4)If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6341.
Yours Truly, D�
&7/�+
Steve Olt,
City Planner
cc: The Architects Studio
North Star Design
Page 9
The following comments were offered by City staff at their project review meeting on
August 27, 2003:
Engineering/Susan Joy
1. An easement exhibit would be good. They are not clearly shown on the plans.
2. Please make sure that the project name is consistent on all plans.
3. A separate phasing sheet may be needed for clarity.
4. A utility coordination meeting for this project would be desirable to better
address all issues.
5. All necessary letters of intent for off -site improvements and easements from
affected property owners must be provided before this development proposal can
go to public hearing.
Stormwater/Basil Hamdan
1. The location of the (existing) gas line must be shown on the utility plans.
2. The proposed trellis between Buildings 1 & 2 cannot be located over an easement.
3. Dedication of new and vacation of some existing easements are necessary. This
should be done prior to public hearing.
Water-Wastewater/Jeff Hill
1. The plans that are part of the initial submittal contain significant drafting errors.
This completes staff (and outside reviewing agencies) review and comments at this
time. Additional comments and red -lined plans may be forthcoming. This proposal is
subject to the 90-day revision re -submittal requirement (from the date of this
comment letter, being September 4, 2003) as set forth in Section 2.2.11(A) of
the Land Use Code. Be sure and return all of your red -lined plans when you re -submit.
The number of copies of each document to re -submit is shown on the attached
Revisions Routing Sheet.
Page 8
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Utility Plan
Number: 32 Created: 8/27/2003
Maintain 4 feet minimum separation between meter pit and all permanent structures
(i.e. building envelope, trash enclosure, retaining walls, etc.). Place meter pits and curb
stops adjacent to the main when possible.
Number: 33 Created: 8/27/2003
Our records indicate an existing water service and fire line stub has been extended
into the area of Phase 2. Field locate all utilities, show and label on plans. Clearly
define whether existing stubs/services are to be used or abandoned.
Number: 34 Created: 8/27/2003
Provide utility easements for all water service lines upto and including the curb stops.
See site, landscape and utility plans for other comments.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 2 Created: 8/4/2003
Please remove topo lines from final site and landscape plan.
Number: 3 Created: 8/4/2003
At least one of the HC spaces needs to be van accessible and signage at the front
stating as such.
Number: 4 Created: 8/4/2003
Please label building envelope, dimensions, distance to property lines.
Number: 5 Created: 8/4/2003
Phase lines aren't real clear - which phase do the different parking lot areas go with?
Please clarify
Number: 6 Created: 8/4/2003
OPINION - the trash enclosure is the first things people are going to see when they
approach from the adjoining ShopKo parking lot. Is this the first view you want them
to have? Is there an alternate, more aesthetic location?
Number: 7 Created: 8/4/2003
No landscape plan received, please submit one for review.
Page 7
City will not own or maintain such a line and it would thus be allowed. Since this line is
carrying flows from the main ShopKo parking lot, a private easement may be needed
between the owner of this parcel and the owner of the 5hopKo, Parcel A. Please add
notes on the plan to that effect.
Topic: Utility Plans
Number: 28 Created: 8/26/2003
The storm sewer manhole along Boardwalk Drive is located in an area that is typically
used by Light and Power for their line (behind the walk). Please check with Light and
Power to make sure that this location is OK for them. If the manhole is kept at that
location, then the lid needs to be offset to keep it away from the walk. The line along
JFK could also conflict with gas lines. A utility coordination meeting might be helpful
to clarify these issues.
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: Traffic
Number: 8 Created: 8/5/2003
The Transportation Impact Study prepared for the project dated July 2003 is
acceptable and no revisions are required. The project has minimal impact to the
surrounding public street network and no street/geometric improvements on JFK or
Boardwalk will be required. Minor street left turns fail but this is normal and can be
(expected.
Department: Transfort
Topic: General
Number: 9
No comments
Issue Contact: Garold Smith
Created:8/13/2003
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 35 Created: 9/1/2003
The LUC requires that a minimum 4 foot clear space be maintain where cars overhang 2
feet into walkways. Increase the width along the NE walkway from JFK to a 6 foot
minimum.
Number: 36 Created: 9/1/2003
The LUC requires that bike racks be located near building entrances in a visible secure
location. Please relocate bike racks near the primary entrances to the stores. See red
lines for suggested locations.
Page 6
Department: Police Issue Contact: Joseph Gerdom
Topic: Genera/
Number: 12 Created: 8/25/2003
Lighting between Phase 1 and Phase 2 buildings should be a minimum of 0.7fc
throughout. Location and orientation of enclosure (away from buildings) will make
natural surveillance difficult - further hindered by location of Austrian Pine.
Department: Stormwater Utility
Topic: Easements
Number: 25
Issue Contact: Basil Hamdan
Created: 8/26/2003
Need to vacate the existing storm drainage easements where the storm line is being
removed and dedicate a new easement for the relocated line. Provide an easement
vacation and dedication exhibit.
Topic: Erosion Control
Number: 31
August 18, 2003
Plan is OK. Thank you.
Topic: Grading Plan
Created; 8/26/2003
Number: 11 Created: 8/21/2003
Please provide an interim grading plan showing how the Phase 2 area will be graded
prior to its construction and after Phase 1 is completed.
Please provide tree protection notes on the plans specifying that trees in the area
where the new storm sewer is proposed on the east side of the side will be protected
in place during construction.
Topic: Grading plans
Number: 30 Created: 8/26/2003
Please provide cross sections along the east side of the building showing the slope from
the building, the swale and the storm line along JFK. Another cross-section along the
retaining wall and pond would also be helpful.
Add tree protection notes to the grading plan. Show and call out protective
construction fencing for trees to remain.
Topic: Storm Sewer Alignment
Number: 10
Created:8/21/2003
It seems that the storm sewer line coming from the parking area inlet will be crossing
under a trellis cover. Please make sure that this line is a private line that would not
require a public easement for it to be allowed. If this is a private line and the then the
Page 5
utility easement that is no longer needed, however, that can not be done until the new
easement is dedicated and the new line installed.
Number: 22 Created: 8/26/2003
May need a temporary construction easement from the property owner to the north.
If so, a letter of intent from that property owner is required before going to hearing.
Number: 23 Created: 8/26/2003
Sheet 5 - Correct overlapping labeling.
Number: 24 Created: 8/26/2003
Sheet 6 - Phasing?
Number: 26 Created: 8/26/2003
Sheet 9 and 10 - Provide details 707, 1601, 1603, and 1606. Please label all non
standard on -site curb and gutter details as "on -site".
Number: 29 Created: 8/26/2003
Suggest a Utility Coordination Meeting prior to the next submittal to work out the
storm sewer alignment in relation to the sidewalk and other utilities. Suggest rotating
the manhole away from the sidewalk.
Number: 37 Created: 9/2/2003
No structure of any kind is allowed in utility easements.
Department: Light & Power Issue Contact: Doug Martine
Topic: Light d Power
Number: 1 Created: 8/4/2003
The power source to this site will be from the southwest corner of the site. The
developer will need to coordinate transformer location(s) with Light & Power
Engineering. Transformer(s) will need to be a minimum of 3 ft. from any structure and
have a minimum of 8 ft. of clearance to the front side of the transformer. The
transformer(s) also must be within 10 ft. of a paved surface for line truck access.
Department: Natural Resources
Topic: General
Number: 38
No issues.
Issue Contact:. Doug Moore
Created:9/3/2003
Page 4
Topic: Landscape Plan
Number: 15 Created: 8/26/2003
Remove the contours.
Number: "16 Created: 8/26/2003
Show and label all existing and proposed easements.
Topic: Site Plan
Number: 13 Created: 8/26/2003
Please remove the utilities, contours and landscaping.
Number: 14 Created: 8/26/2003
Show and label all existing and proposed easements.
Number: 19 Created: 8/26/2003
Pedestrian Access Ramps do not match the utility or landscape plans. See redlines.
Topic: Utility Plan
Number: 17 Created: 8/26/2003
Sheet 2 - 2 benchmarks are required in Line 40 of the General Notes.
Number: 18 Created: 8/26/2003
Sheet 3 - Under notes: 2. Utility phasing?
If grading is to be phased, will need a grading plan and erosion control plan for each
phase.
Number: 20 Created: 8/26/2003
Sheet 4 - Update the street cut note to read:
Limits of street cut are approximate. Final limits are to be determined in the
field by the City Engineering Inspector. All repairs to be in accordance with
City street repair standards.
You may also place this statement under "NOTES" so that you don't have to put it by
each and every street cut.
Number: 21
Created: 8/26/2003
Show and label all existing and proposed utility easements, both on and off -site. Please
dedicate additional utility and drainage easements by separate document. It may be
helpful to prepare an easement exhibit showing what's existing and what's proposed so
that we can keep it all straight. You will want to vacate the portion of the existing
Page 3
Number: 46 Created: 9/3/2003
The bike racks, as. shown, do not appear to be in convenient locations relative to the
building entries. Depending on the design of the racks, parked bikes could possibly
hinder pedestrian movement on the sidewalks around them.
Number: 47 Created: 9/4/2003
The parking spaces in front of Building 2 are 17' deep. In 2 locations there are metal
roofs held up by 3 columns each. The outside of these columns are only 4.5' from back
of curb. City Code requires that there be at least a 6' clear sidewalk in front of 17'
parking spaces. This is to allow for at least 4' of unobstructed pedestrian movement.
The proposed 4.5' between the columns and back of curb is not in compliance with
Code; therefore, something must be changed..
Number: 48 Created: 9/4/2003
There is a section of proposed new sidewalk at the west end of Building 2 (where the
bike rack is located) that is not shown on the Landscape Plan. This new sidewalk will
also conflict with an existing Pear tree. The sidewalk is necessary, however, for direct
pedestrian connectivity from the retail/office entries in the new building to the public
sidewalk.
Topic: Utility Plan
Number: 40 Created: 9/3/2003
Len Hilderbrand of Xcel Energy (Public Service) offered the following comments:
a. Xcel Energy has a 6" FB gas main along the east side of JFK Parkway. They will
need to extend a gas main across JFK Parkway to serve the proposed project.
b. No trees may be planted within 4' of any gas lines.
C. They need a minimum 9' wide utility easement. A 9' easement is not adequate if
other utilities equipment (telephone, cable, electric, etc.) is to be located within
this easement.
Number: 41
Created: 9/3/2003
The proposed trellis attached to the west end of Building 1, located between Buildings
1 & 2, cannot encroach into a utility easement.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 27 Created: 8/26/2003
The Project Title on all plan sets do not match the Project Title on DM5.
Page 2
STAFF PROJECT REVIEW
Cily o[ Fort Collins
r®
Doberstein Lemburg Commercial, Inc. Date: 9/4/2003
c/o Dan Bernth
702 West Drake Road
Building E, #B-102
Fort Collins, CO. 80526
Staff has reviewed your submittal for SHOPKO PUD, PAD B - TYPE I (LUC), and we
offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Buildings
Number: 42 Created: 9/3/2003
In reference to wall -mounted light fixture AA, are the fixtures mounted flush to the
walls or are they on an arm of some sort that would extend them out from the
buildings? The concern is about whether or not these light sources will comply with the
City's code requirement that they be down -directional and not create any off -site light
spillage.
Topic: General
Number: 49 Created: 9/4/2003
Please see red -lined plans for additional comments.
Topic: Light d Power
Number: 43 Created: 9/3/2003
The parking lot lighting should be shown on the Site & Landscape Plans.
Topic: Site Plan
Number: 44 Created: 9/3/2003
The trash enclosure is in a location that presents a first impression, focal point for the
project. Also, there is minimal landscaping being provided to screen the enclosure as
proposed. Is there no better place to put this element of the project?
Number: 45 Created: 9/3/2003
A detail is needed for the masonry block retaining walls.