Loading...
HomeMy WebLinkAboutSANCTUARY WEST - FDP - FDP110004 (FORMERLY 30-07A) - CORRESPONDENCE - (3)Page 3 of 3 although not finished there are some comments. They will be sent on when the review is finished. 6. Mitigation and monitoring Plan (Lindsay Ex) — The mitigation and monitoring plan are to be a component of the Development Agreement. Bill, you have indicated to Lindsay you will provide her with a draft of the plan by Friday afternoon. Please note it is extremely likely she will have comments on this plan; please be prepared to quickly address these comments. 7. Development Agreement (Sheri Langenberger) — Staff expects to have our draft language ready for review by the City's attorney by today (Friday). This means that you will have very little time to review the DA on your part. Thus, if you have any comments on the DA, please submit them back to us as soon as possible. Again, on behalf of my colleagues, I can only reiterate that we are doing our best to process all of this information as it is returned to us. Thank you, in advance, for the timely submission of these remaining items. Sincerely, Sam Olt Steve Olt Project Planner 970-221-6341 solt(a)fcaov.com 1/6/2012 Page 2 of 3 comments still had not been addressed: a. The overall floodplain exhibit has not been updated; b. The floodplain linework is illegible. c. Repeat Comment from April 29, 2011; Cross sections must reflect those used in the floodplain modeling report. d. The drainage sheets and grading sheets must reference the Overall Floodplain sheet. e. Repeat Comment from April 29, 2011; Please add the following notes to the Plat, Landscape Plan, Site Plan, Utility Plans (General Notes), Grading Plan, and Overall Floodplain Sheet: (1) Portions of this property are located in the City 100-year flood fringe and floodway of the West Vine Basin, and are subject to the requirements of Chapter 10 of City Code. (2) No storage of materials or equipment shall be allowed in the floodway, whether temporary (during construction) or permanent. (3) An approved floodplain use permit is required for all site elements (landscaping, fencing, roadway, detention ponds, bike paths, parking lot, utilities etc.) in the floodplain prior to mobilization. (4) No -rise certification is required for all site work including landscaping and fencing within the floodway. Re -certification of no -rise is required for as -built conditions. (5) See floodplain exhibit on Sheet 70 for cross-section locations, BFE lines, and other additional floodplain information. f. Remove all references to Larimer County Floodplain Overlay Districts from the general notes. g. All BFEs must be labeled on the Overall FP Sheet. h. Repeat Comment from April 29, 2011; Please make sure both FW lines are represented on the Overall FP Sheet. i. Repeat Comment from April 29, 2011; Please add benchmark information and vertical datum to the Overall FP Sheet. j. Landscape plans; change SW Note 1 reference from "Frine" to "Fringe". k. Repeat Comment from April 29, 2011; Drainage report must reference the date of the URS floodplain modeling report. I. Repeat Comment from April 29, 2011; Drainage report must include a statement of why floodplain modeling was necessary. This is not currently clear. m. Drainage report section III, A, Regulations, must include a reference to Chapter 10 of the City of FC Municipal Code for 100-year floodplain and floodway areas. n. Repeat Comment from April 29, 2011; Drainage report must discuss all floodway construction, why Ch. 10 applies to proposed floodway construction, how floodway construction will meet no - rise certification standards, and how it will be re -certified for no -rise with as-builts. o. Site boundaries in the Drainage Report appendix figures must be shown clearly and must be to scale. 4. Overall molars (All Staff) — Because staff has not seen a complete set of Utility Plans (with a sufficient time for review) since 2010, we are generally okay with heading to mylars (once the floodplain, road design, and platting issues have been addressed). However, there is not 100% confidence amongst City Staff to say that we know we'll be able to sign the mylars when they are initially submitted. Due to this, we highly recommend that the mylars are submitted by Monday mornin4, with all of the corrections listed in this email completed. That way, if/when sheets need to be sent back, there is sufficient time to correct them. a. In addition, the Utility Plan mylars need the signatures from Poudre School District and the New Mercer Ditch Company before submittal to the City. 5. Road design concerns (Sheri Langenberger) — Sheri has also been working with you on the road design issues. Note that some of the grading changes that are being made could trigger additional Stormwater review. Additional corrections to the street profiles (utility plans) will be needed - Sheri is in the process of reviewing the revisions that were returned to her and 1/6/2012 Pagel of 3 Steve Olt From: Steve Olt Sent: Friday, January 06, 2012 11:05 AM To: Bill Veio; 'Terence Hoaglund' Cc: Lindsay Ex; Sheri Langenberger; Brian Varrella; Shane Boyle; Wes Lamarque; Jon Haukaas; Steve Dush; John Von Nieda; Jeff County; Glen Schlueter Subject: Sanctuary West - Final Plans Bill and Terence, In light of the Tuesday, January 10th drop -deadline at 5 p.m., City Staff met yesterday to generate and provide a list of our remaining needs to get to final approval. They are lengthy and we won't mince words — we are very concerned about the ability to complete all of the items listed below. However, City Staff is committed to doing what we can to help you get to approval. That said, here is our list: 1. Plat, Site Plans, Utility Plans (Jeff County and John Von Nieda) — has minor corrections that need to be made, please note the following: a. The reception numbers from the easements, see below, must be on the Plat. b. The reception numbers from the easements will need to be added to sheets 3 & 4 of the Site Plans as well. c. Both current and proposed floodway, as well as current and proposed floodplain must be shown on Plat. Recommend showing by different line types due to the already "busy" nature of Plat. d. Corrections need to be made to the legal description. e. All Outlots must be labeled with the correct easement descriptions on the Plat. f. Remove the project benchmarks from the Plat. g. Is Steve Lund still signing this Plat? If not, please change the Surveyor's Statement. h. Add the correct floodplain exhibit sheet # in standard note "e". i. There are several easement widths missing on the Plat. j. Please make sure all monuments found or set are shown & labeled on the Plat. k. More information is needed for several easements on the Plat. All easements must be locatable. I. We still need to see Utility Plan sheet 23. m. Based on the Utility Plans received on 12/20/11, there are details on sheets 64 & 66 that have outdated details from the 1980's. These need to be replaced with up-to-date details. n. We received a revised Plat from King Surveyors at 9:39 a.m. 1/06/12, but have not had time to review it completely. 2. Easements (Sheri Lanoenberger) — All the easements need to be provided in acceptable final format with all signatures and correct legals before the utility plans can be signed. a. Sheri sent a lengthy email on Wednesday detailing her concerns about the easements; both Stormwater and Engineering will need to review the revised easements before final approval can be granted. Note that there are concerns regarding attorney's certifications (4 of the easements) and the legal description of the parcels (6 of the easements). b. The legals are being reviewed on Friday and any additional changes beyond what has already been noted will be provided as soon as possible. c. Sheri will be meeting with Real Estate Services Friday morning. Any issues or concerns that come out of that meeting will be provided after that meeting. 3. F000dplain comments (Brian Varrella) — Brian saw the revised Utility Plans for the first time today; he did not have a chance to go through all of his comments from the April 29, 2011 staff letter, but did note several of his 1 /6/2012